Introduction and contents
202 words1 tablePlan version 0.1
COMPREHENSIVE PLAN FOR THE DESIGN OF FRANKENMINING
FrankenMining (
franken_mining; cratesfmine-*; binariesfmine,fmined,fmine-mcp,fmine-tui) is an evidence-native, asupersync-based operating system of record for integrated gold, copper, silver and tin mining companies. It covers the chain from the first soil sample to the board's capital decision. Every number it emits carries its support, its evidence class, its calibration record, its unknown-unknown term and its provenance. Every forecast it makes is frozen before the outcome and scored after.
| Field | Value |
|---|---|
| Document | COMPREHENSIVE_PLAN_FOR_THE_DESIGN_OF_FRANKENMINING.md |
| Version | 0.1, first comprehensive pass. It goes to multi-model refinement rounds next (see §0.6). |
| Date | 2026-10-28 |
| Status | PLAN. An M0 scaffold of 15 crates exists in crates/ (local commit 68e7091); nothing in it is implemented in the §0.2 sense, and its M0 output is synthetic (Appendix K.2). Every capability statement in this document is DESIGN or TARGET unless it is labelled FACT. |
| Sibling plans mimicked | franken_surveillance_system/COMPREHENSIVE_PLAN_FOR_FRANKEN_SURVEILLANCE_SYSTEM.md (FSS), franken_accounting/COMPREHENSIVE_PLAN_FOR_THE_DESIGN_OF_FRANKENACCOUNTING.md (FA), franken_textiles/COMPREHENSIVE_PLAN_FOR_THE_DESIGN_OF_FRANKENTEXTILES.md (FTX) |
| Process artifacts | planning/research/R1–R8, planning/mor/MOR_CASE.md, planning/brenner/B1–B7, planning/mor/audits/ (audit reports), planning/corpus/C1–C6, planning/research/W1–W5, planning/mor/r7/ (round-7 audited review), planning/duel/ (idea duel) (§0.6, Appendix K) |