The plan, version 0.1
The full design.
Everything behind FrankenMining in 57 sections and appendices, from the first soil sample to the board’s capital decision, with every load-bearing statement labelled FACT, DESIGN, HYPOTHESIS, TARGET or OPEN.
Where to start
New here
What it is, the bets it makes, who it serves and the scenarios that drive it.
The epistemic core
Claims, evidence classes, unknown unknowns and the forecast ledger.
Geology and planning
Exploration, drilling, the subsurface ledger, geotechnics and the pit.
Operations and plant
The operations twin, the plant, tailings, people and reconciliation.
Money and decisions
Accounting beside the ERP, decision cards, the capital program and disclosure.
Thesis
Part I · 5 entriesWhat the mining software stack gets wrong, and the system of record FrankenMining is built to be.
§2479 wordsBets, each with its falsifier§3518 wordsReaders and their questions§41,012 wordsGoals, non-goals and anti-goals§5854 wordsNorth-Star scenarios (before → after; TARGETs)Each scenario is an acceptance narrative. The milestone in brackets is where it first becomes demonstrable.
The epistemic core (plumb)
Part II · 5 entriesFrankenMining separates four planes. Most category errors in mining software come from collapsing them (DESIGN).
§7798 wordsEvidence classes, knowledge states, and the no-laundering rulesAttestation is not an evidence class (NL-3). A CP, QP, EoR, controller or ITRB signature changes a Claim's authority field (who stands behind it).
§81,001 wordsThe universal ClaimThe universal Claim: a value with its support, evidence class, calibration record, unknown-unknown term and provenance.
§91,851 wordsKnown knowns, known unknowns, unknown unknownsWhy not one global Bayesian posterior? Under misspecification the model cannot represent (M-open), a posterior concentrates on the KL-nearest wrong model, and coverage decays as data grow.
§101,777 wordsThe forecast and calibration ledger, and surpriseForecasts registered before the outcome and scored after it, with monitors that flag a stream once it stops being calibrated.
The mine, end to end
Part III · 14 entriesExploration as Bayesian prospectivity, with typed negative evidence and undiscovered-endowment estimates.
§122,169 wordsCorebox: drilling, sampling, QA/QC and assaysCorebox owns layer L0 of the subsurface: immutable, bitemporal observations with characterized error. Everything in Strata, Lodestar and Touchstone is only as good as Corebox's error…
§135,368 wordsStrata: the Subsurface Belief LedgerThe subsurface belief ledger: block models as claims with support, uncertainty and change-of-support corrections.
§142,089 wordsHighwall: geotechnics and ground controlHighwall is the most safety-critical part of the system's cognition. Its doctrine is therefore the strictest:
§155,866 wordsPushback: mine planning and optimization under uncertaintyMine planning under uncertainty, with a certified ultimate pit and schedules that say what they are worth.
§164,547 wordsHeadframe: the operations twin of recordThe operations twin of record: loads, faces, fleet and custody, read from the systems already on site.
§174,130 wordsCrucible: processing, metallurgical accounting and on-site refiningProcessing and metallurgical accounting: balanced streams, recovery cards and grinding models.
§183,953 wordsFreeboard: tailings, water and closureTailings, water and closure, with every instrument's age and evidence in view.
§192,345 wordsMuster: workforce, rosters, critical controls, productivity and budgetsSource: Brenner pass B6 (planning/brenner/B6_operations_plant_tailings_workforce.md, sub-question B6-SQ4), building on FSS privacy doctrine, R6 §1.5, R7 and W3 data-residency statutes…
§203,760 wordsTouchstone: reconciliation, the truth signalReconciliation as joint state estimation across model, mine, mill and market.
§216,619 wordsBullion: accounting through franken_accounting, and the metric engineAccounting through FrankenAccounting beside the ERP, and the metric engine behind cost per ounce.
§221,700 wordsHelm I: DecisionCards and the value of informationDecisionCards and the value of information: what more evidence is worth before you buy it.
§235,076 wordsHelm II: the CapitalProgram, executive optimization and the scenario indexThe capital program: portfolios chosen for value with a bound on the bad tail.
§242,916 wordsHallmark: the resource and reserve register, attestation and disclosureCrate: fmine-reserves. Sources: R7 §4.2 (codes verified to October 2026), B1 (snapshot triple), B5 W7, E031.
Substrate, suite and engineering
Part IV · 8 entriesMany material reconciliation failures in mining are not modelling failures but basis failures (HYPOTHESIS, tested by the M2 parity reproduction and GB-34):
§264,580 wordsBedrock: authority cells, objects, sync and the runtimeSource: Brenner pass B4 (planning/brenner/B4_substrate_and_integration.md). Each verdict below survived a refuter-first test, and each has a cheap discriminating experiment and a kill gate.
§272,687 wordsSuite consumption: what FrankenMining takes from its siblings, and howDoctrine. Consume, never fork (§0.4, sentence 9). A sibling is used in exactly one of five postures:
§282,947 wordsWorkspace, crate map and budgetsDependencies point downward only: T → U → V → E → K → S1 → S0.
§291,423 wordsNumerics posture and determinismGOAL-024 promises that an auditor can replay a disclosed number offline and get the same certificate digest.
§301,432 wordsAdit: surfaces and the agent modelThe agent model: documented commands, typed refusals and the line agents cannot cross.
§312,523 wordsSecurity, confidentiality and OT safetyVerdict (B4 SQ6): layered security. Two simpler hypotheses were refuted:
§321,170 wordsPortal: industry interoperability inside a closed universeProduction code is either lifted (with provenance and a licence check) or reimplemented. Foreign tools are pinned lab oracles: they capture fixtures, and those fixtures are never…
Verification, gates, risks and open questions
Part V · 4 entriesA result may be described only by the claim its evidence supports. Each claim type has its own evidence, gate family and permitted wording.
§341,754 wordsThe gate registerWhat makes an admission record valid (R7-C017, R7-C083, R7-C101, R7-C153). An INT-* record is valid only if it cites a commit in which Cargo.lock is tracked and contains the foundation,…
§351,825 wordsRisks and the pre-mortemSource: B5 §7. The stories are ordered roughly by likelihood × impact (HYPOTHESIS). Each gives a leading indicator visible by about month 6 and a countermeasure already designed into this…
§361,126 wordsOpen questions and the decision ruleAn OPEN item past its deadline is escalated to the program review. Its default stays in force, and the plan records that the default, not a decision, is governing.
Delivery
Part VI · 3 entriesEach milestone has an artifact, acceptance criteria (TARGETs), a kill gate with a fallback, and the published metrics whose decision inputs it touches.
§38522 wordsWork packagesEach work package (WP) has an owner role, a crate set (§28.3), the gates it must pass and its dependencies.
§399,089 wordsThe first 357 beadsThese 357 beads instantiate WP-00 to WP-12 in detail and WP-13 to WP-20 as epics. They are generated from one structured list, and the generator refuses unknown dependencies and cycles.
Appendices
11 entriesDomain terms are defined as this plan uses them. Where industry usage varies by site, the plan treats the definition as registry data (for example F-factors, §20.4), and this glossary gives…
Appendix B1,349 wordsBrenner verdict registerThe six Brenner passes argued from the MOR case file (planning/mor/MOR_CASE.md, pivotal questions PQ-1 to PQ-7 plus B6-SQ1 to B6-SQ4).
Appendix C910 wordsIdea-wizard: 30 ideas → 5 → 15The idea-wizard pass generated 30 ideas against the brief, thought each through (mechanism, user perception, implementation, failure mode), and winnowed them.
Appendix D1,260 wordsEV matrices and the galaxy-brain card indexScore = (Impact × Confidence) ÷ Effort, each 1–5. Families below 2.0 were rejected or deferred.
Appendix E1,217 wordsMathematics compendiumEquations used by the plan, with where they are used and the assumptions that bound them. Labels follow the plan: FACT means stated in a cited source.
Appendix F1,422 wordsUpstream asks and the foundation dependency ledgerSibling repos are read-only to this program. FrankenMining's platform owner holds every FD- row; the fix for an ask belongs to the sibling's maintainers, who file it as a bead in their own…
Appendix G443 wordsEvidence register indexThe register is planning/mor/MOR_CASE.md. It is append-only: corrections are appended rows (e.g. the E029 correction), never overwrites.
Appendix H2,068 wordsAudit fold-inChecked and sound: the arithmetic of the 28 cards the report lists, the cited formulas, planning algorithms, GISTM and TML facts, accounting standards and the Barrick and industry figures…
Appendix I3,152 wordsThe document corpus: what it showed and what it changedThis appendix records how the supplied documents were read, what they established, and where each finding now lives in the plan. The findings themselves are in the plan body (§10–§39).
Appendix J624 wordsThe public-source research pass (W1–W5)Appendix I ended with questions "only the owner can answer". Most of them have public answers. Five agents looked for primary sources on 2026-10-28/29 (filings on SEC EDGAR, Barrick's IR…
Appendix K4,795 wordsRound 7: the M0 reality audit, the assurance-chain pass (B7) and the idea duelClaim ids in this plan of the form R7-C### refer to planning/mor/r7/MOR_CLAIMS.jsonl.
Overview
1 entryDocument control
Part 0 · 7 entriesThe words MUST, MUST NOT, SHOULD, SHOULD NOT and MAY follow RFC 2119. Every load-bearing statement carries one of these labels.
§0.2165 wordsWhat "implemented" meansA capability is implemented only when all seven of the following hold (after FSS §0):
§0.3341 wordsStable identifier prefixes (never renumbered; retired IDs are tombstoned)Short labels are local to the section that defines them: R0–R3 are reconciliation levels (§20.3) while R1–R8 are research reports.
§0.4391 wordsReading guide§0.5365 wordsSubsystem namesNamed subsystems give each bounded context a short, memorable handle, as FA's Folio/Abacus/Almanac do. Each maps to a set of crates (§28).
§0.6511 wordsHow this plan was produced (compact provenance)The process is recorded so that refinement rounds can audit it. It is not a deliverable.
§0.7112 wordsPlan hygiene rules (FTX lessons)