Round 7: the M0 reality audit, the assurance-chain pass (B7) and the idea duel
4,795 words7 subsections6 tablesPlan version 0.1
On this page7
K.1 What ran (2026-10-29)
| Pass | What it did | Where |
|---|---|---|
| Modes-of-reasoning round 7 | A neutral case (E673–E690 new, E001–E672 imported), six reasoning passes (baseline, M0 reality, internal consistency, quantitative checks, readers and obligations, dependencies), a normalised ledger of 171 claims and eight auditors who did not write the claims they checked. Auditors re-ran the M0 binary against real and altered workspaces, re-read workbook cells and recomputed the arithmetic. Result: 102 VERIFIED, 59 PARTIALLY_SUPPORTED, 2 REJECTED, 1 HYPOTHESIS, 1 SUPERSEDED, 6 NON_MATERIAL; no genuine conflict survived | planning/mor/r7/ (report, case, ledger, audits) |
| Brenner B7 | The assurance chain (§20, §21, §22, §24, §30) tested against the real Barrick workbooks and filings and the obligations of QPs, CFOs and IR, on a live NTM squad (Claude, two Codex, Gemini), with a forced third alternative and a cross-family disagreement register | planning/brenner/B7_assurance_chain.md |
| Idea duel | Claude, Codex and Gemini each generated 30 ideas, kept 15, scored the other two models' 15 on 0–1000, saw their own scores, rebutted, steelmanned the rival's best idea and named blind spots | planning/duel/ (DUELING_WIZARDS_REPORT.md) |
Claim ids in this plan of the form R7-C### refer to planning/mor/r7/MOR_CLAIMS.jsonl.
K.2 The committed M0 slice against this plan (FACT; executions of 2026-10-29)
A local commit, 68e7091, added 15 crates, xtask, registries, CI and 320 beads (87 closed). It has not been
pushed; origin/main and origin/master are at 30ee8f5. What the auditors reproduced:
| # | Finding | Claims |
|---|---|---|
| 1 | Every figure in fmine assure public --issuer barrick comes from an in-code stand-in workbook or from literals. Any registered file that is missing or unreadable is silently replaced by the stand-in, per file, with exit 0. With the real workbooks under the expected names the command refuses (FMINE-REF-502: no "Gold AISC" sheet). Changing an input cell leaves the output and state root byte-identical |
R7-C001, R7-C011, R7-C058, R7-C059, R7-C065 |
| 2 | Figures labelled as Barrick's are wrong: FY2025 AISC 1,638 against a published $1,637/oz; 3,255 is attributable production, not ounces sold (3,318); FY2024 3,973 matches no gold-ounce cell; the corporate layer has the wrong sign; the North Mara block is labelled 2024 Q1→Q2 with values that match no cell (the real move is Q2 2025 $1,292 → Q2 2026 $2,577); reserve-replacement inputs were solved to hit 190%/504%; the price decks are shifted by a year. None of the stand-in's 41 explicit values sits at a published coordinate | R7-C002–R7-C006, R7-C054, R7-C159 |
| 3 | The parser itself works: it reads all 18 real workbooks and matches an independent reader exactly. The obstacles are the compiled-in file list, the hard-coded sheet name and fixed coordinates | R7-C007–R7-C010, R7-C063 |
| 4 | All 87 closed beads share one close reason citing GATE-BULL-01, closed within 12 seconds; four were closed over open blockers; at least 23 have unmet done-when conditions (no GATE-BULL-01 scorer, no INV-002 flags, no golden cards, no robot schema) | R7-C013–R7-C016 |
| 5 | INT-AS-001 and INT-NUM-001 records say PASS while no external crate is in the build graph; lmdi.rs and fmine-calib call std transcendentals although INT-NUM-001 lists them as BitwisePortable |
R7-C017–R7-C019, R7-C083 |
| 6 | The envelope lacks the four INV-002 flags, certificate, next_actions and the no_claim line; claim show returns Exact/KnownKnown for any id with the right prefix |
R7-C021, R7-C022, R7-C062, R7-C147 |
| 7 | Refusal codes mean different things in the plan, the registry and the compiled catalogue (4 of 25 agree); the evidence types are not §7.1/§7.2's; the CONTRACT template lacks six of §0.2's ten sections; 14 of 15 LOC budgets differ from the registry; five of eight lift guard tests do not exist; five lift headers misstate frankensim's licence; unwrap/expect/panic are not denied |
R7-C080, R7-C081, R7-C087, R7-C088, R7-C096, R7-C099, R7-C164 |
| 8 | deny.toml would fail asupersync 0.5.0 (rider licences, duplicates) and is not run in CI; franken-stack.lock uses -01 row ids that collide with F.2's upstream-ask ids and names an unrelated crates.io fastmcp |
R7-C150–R7-C152, R7-C162, R7-C163 |
| 9 | What holds: §39 and .beads/issues.jsonl agree exactly (320 beads, 533 edges, acyclic, 29-bead critical path); §38 is the transitive reduction of the bead graph; §28.3 equals the LOC registry; all 51 inter-crate edges point downward; every lock pin resolves in the sibling repositories; the toolchain pin matches |
R7-C068–R7-C074, R7-C166, R7-C170 |
Before any push (DOMINANT under the owner's loss function; R7 report R001–R003).
- Remove both silent fallbacks; refuse with a non-zero exit that names each absent or unreadable registered file.
Move the stand-in and every Barrick-attributed literal to a synthetic lane whose output prints
syntheticand cannot count toward GATE-BULL-01. Replace the four stand-in tests with labelled synthetic tests plus a real-file run; do not delete or weaken them (BD-321). - Reopen the closed beads whose done-when is unmet, or replace the shared reason with each bead's own evidence; no close reason cites GATE-BULL-01 before a scorer records a PASS on real inputs. Rewrite INT-AS-001 to "not admitted" and INT-NUM-001 to "FD-row fallback taken" (BD-323).
- Pin the 18 real workbooks in a source registry and rebuild the importer on label anchors before the Q3 2026 release (BD-322).
68e7091 was pushed on 2026-10-29 at the owner's instruction, followed by correcting commits (543df53 …
748da79); public history is never rewritten, so it stays (OPEN-R7-5, resolved). Step 2 was not complete at that
push and is tracked as BD-323.
State after the corrective work of 2026-10-29 (FACT, executions; MOR_CASE E820–E823). Items 1 and 3 are done.
- The stand-in and both fallbacks are removed.
- A workspace without the files refuses with FMINE-REF-502 (exit 8), naming all 18.
- An altered file refuses with both digests.
fmine-publicnow holds:- a registry pinning the 18 workbooks (URL, bytes, SHA-256);
- a label-anchored AISC reader;
- the five-state identity ledger with exact certificates and registered reconstructions;
- a synthetic lane that prints
syntheticand is never gate-eligible.
- The real-file run reproduces an independent reader exactly. This covers the census and numeric digest of all 18 workbooks, and the full ledger: 34 tables, 2,595 instances, footing 1,004/4/6/24, per ounce 1,116/3/17/385/36.
- The envelope carries the INV-002 flags,
no_claim, cited exceptions with certificates, andnext_actions.claim showrefuses. - In
fmine-metrics:- the price decks are the Circular's (E606);
- reserve replacement refuses a non-positive depletion;
- the four mislabelled tests are synthetic.
Still open:
- item 2 (BD-323);
- findings 5, 7 and 8;
- GATE-BULL-01 part 3 (issuer consistency across vintages).
Cell number formats are now read and the ledger scores displayed values (bd-jg43.1–.3, MOR_CASE E833, E834 and E838). E823's twelve refusals are all (i). The LibreOffice cross-check of the display rules is still to run.
K.3 Corrections folded into this plan
| # | Where | Change | Claims |
|---|---|---|---|
| 1 | Document control | Status reflects the M0 scaffold; process artifacts list R7, B7 and the duel | R7-C028, R7-C043 |
| 2 | §3 | Rows added for investor relations and the disclosure committee, and for the compensation committee | R7-C139, R7-C140 |
| 3 | §5 NS-01 | M0 bars restricted to what public data support; fuel, FX and labour bars wait for M2 | R7-C033, R7-C044 |
| 4 | §10.4 | Coverage time to alarm at 58% coverage: median about 2 years, not 3–5 years |
R7-C124 |
| 5 | §10.7 gates | GATE-PLUMB-E3 pooled over ≥ 50 replicate worlds; GATE-PLUMB-E5 needs ≥ 1,000 null runs and a Clopper–Pearson bound; KILL-PLUMB-6 states the ARL₀ that keeps chance kills ≤ 5% | R7-C120, R7-C122 |
| 6 | §17 GATE-CRUC-02 | Pooled over recovery and throughput; the twelfth outcome is dated from first plant data | R7-C120 |
| 7 | §21.6 | Public lane: registered inputs only, typed refusal on any missing file, state root over the input manifest, filed-page labels for company-level figures | R7-C034, R7-C037, R7-C038, R7-C065, R7-C131 |
| 8 | §21.6, §21.8, §37.3 | GATE-BULL-01 split into extraction fidelity, identity accounting and issuer consistency; the single 95% bar and its 84/89 basis withdrawn; kill on blind-file extraction fidelity | R7-C023, R7-C024, R7-C040, R7-C050, R7-C110, R7-C111 |
| 9 | §21.6, §37.3 | The FY2026 forecast record: cut-off, manifest, 100% basis, baselines, interval score, external time proof by 31 Dec 2026, attestation, Q1/Q2 2027 vintages, no positive calibration claim before n ≈ 35 | R7-C026, R7-C042, R7-C061, R7-C066, R7-C118, R7-C119, R7-C154, R7-C155 |
| 10 | §21.6 | Corporate-layer band stated for the six blocks it fits (Q3 2025 is +$88.66); 504% labelled as the published figure | R7-C029, R7-C125 |
| 11 | §21.8 | GATE-BULL-02 is M3 (with INT-FA-001); GATE-BULL-03 in the site's unit ($/lb at Lumwana) and honest about cost-driver bars | R7-C091, R7-C105, R7-C142 |
| 12 | §21.9 GB-28 | Review-load arithmetic restated with its assumptions; year-1 writer time is 12–18 min/day on average | R7-C123 |
| 13 | §22 GATE-HELM-02 | χ² test over K problems replaces the per-seed 2·SE rule | R7-C121 |
| 14 | §27.5, F.1 | frankenpandas pin fixed at git 37bb94101 (crates.io 0.6.0 is older); fastmcp-rust named; FD row ids canonical |
R7-C162, R7-C163, R7-C165 |
| 15 | §28.3, RISK-25 | Sibling velocity reference class; LOC figures are scope caps; RISK-25 raised to High | R7-C112, R7-C113, R7-C115 |
| 16 | §30.1 | Refusal family → exit code table; usage errors exit 2; registry is the single source | R7-C080, R7-C092, R7-C093, R7-C100 |
| 17 | §31.1 | "Private access" defined; the issuer's public lane frozen at GATE-DATA-01; issuer data terms | R7-C052, R7-C136, R7-C137, R7-C158, R7-C160 |
| 18 | §34.2 | Admission records need a tracked Cargo.lock with the foundation; INT-AS-001 split into 001a (WP-00) and 001b (WP-05, M1) |
R7-C017, R7-C083, R7-C101, R7-C153 |
| 19 | §34.4 | GATE-DATA-01 freezes the public lane; GATE-DATA-03 has recovery-led and grade-led thresholds; P(M2′) ≈ 0.7 with Lumwana alone, about 0.5 only if the alternates were independent | R7-C084, R7-C102, R7-C126, R7-C137 |
| 20 | §35.1 F7, §35.2 | F7's 4-of-8 miss is strong evidence (P = 0.005); RISK-31 issuer data terms, RISK-32 synthetic figures reaching an issuer, RISK-33 overstated process records | R7-C118, R7-C160 |
| 21 | §36.2 | OPEN-HALL-4 moved before GATE-DATA-01; OPEN-R7-1…5 added (data terms, reviewers, the owner's lane status, the sourcing rule, the fate of 68e7091) |
R7-C030, R7-C032, R7-C045, R7-C138, R7-C161 |
| 22 | §37.3 M0 | Blind-test timing (push before 06:00 ET on 9 Nov 2026, else Q4 2026 at M1); named reviewer pool and disclosure sequencing (40-F filer; NP 51-201 and provincial statutes, not Reg FD); crates include BD-090 and BD-142; dependency calendar by role | R7-C025, R7-C041, R7-C086, R7-C089, R7-C090, R7-C104, R7-C116, R7-C132–R7-C135 |
| 23 | §37.3 M2 | Recovery-led GATE-DATA-03 route; a material finding routed to Barrick's disclosure QP and committee the day it is attested; waterfall bars classed controllable, price-linked or structural | R7-C084, R7-C102, R7-C138, R7-C141 |
| 24 | §39 | Bead rule: own-evidence close reasons, no closing over blockers, an xtask check; BD-123 accepts the FD-FMD-00 fallback | R7-C039, R7-C085, R7-C103 |
| 25 | §21.6, §21.8, §37.3 | GATE-BULL-01 part 2 rewritten as five cited states under a declared rounding construction; the live-dependency proof added to M0 acceptance | B7; E691–E698 |
| 26 | §21.6 | G&A sits wholly in L_corp (FACT); the waterfall is descriptive on public data, with factor-domain refusal, rounding intervals per bar and the printed-rate gap listed | E697, E699 |
| 27 | §5 NS-01 | "Certified causal waterfall" becomes causal only once the metallurgical balance is in (M2) | E699 |
| 28 | §22.1 | A finding is not a decision: evidence-challenge packets for public exceptions | B7 EV-P2-3, EV-P3-5 |
| 29 | §22.8 GB-29 | No-flip prior 34/43 ≈ 0.79, not about 0.78 | B7 EV-P2-4 |
| 30 | §24.3, §24.9 | Issuer reserve rows as imported assertions; GATE-HALL-01's fixture is the filed roll-forward, with the deck as a cross-check | E692, E698 |
| 31 | §37.3 M0, M1 | M0 adds the live-dependency proof, the reproduction kit, certified discrepancies and (as a target) the guidance transcription; M1 adds the public-data capabilities of K.5 | K.5 |
| 32 | §39, BD-272 | BD-272 drops the ±1-last-digit rule; BD-321 to BD-357 added (K.6) | B7 EV2-P1-1 |
Rejected during audit (kept as lessons). "The 95% bar is reachable because AISC values match Mine Stats in 420 of 432 cells" (R7-C064): that agreement rate is a different test on a different denominator. "INV-009 has no enforcing bead" (R7-C095): the same rule is NL-6, covered by BD-042 and GATE-PLUMB-E1.
Checked nulls. JV partners, regulators and QPs have no material reader gap in M0–M1 (R7-C143–R7-C145); retrospective DecisionCards built only from public evidence touch no disclosure rule (R7-C146); site access and suite non-convergence are controlled for M0–M2 deliverables (R7-C168, R7-C169); the build-host disk shortage affects local throughput, not plan control (R7-C171). The recomputed cards GB-03, GB-08, GB-26, GB-29 and GB-35 hold (R7-C055, R7-C056, R7-C125).
K.4 What B7 established about the assurance chain
B7 tested 24 design hypotheses (six per pane, one pane per model family plus a second Codex pane) against the real
workbooks and filings, in two refutation rounds, a decisive pilot and three per-family distillations. The full
record and the verdict table are in planning/brenner/B7_assurance_chain.md, the register in
planning/brenner/B7_disagreement_register.md.
Adopted into this plan (rule → where).
- Bind every imported value to its bytes and its interpretation: cell or page, header, unit, basis, subject and publication vintage, with the raw token kept. An anchor alone proves too little (§21.6; BD-322, BD-332).
- Extraction fidelity is its own gate. A five-state identity ledger reports what the identities show; no completeness count stands in for fidelity (E696; §21.6 part 2; BD-331).
- Name the rounding construction before judging an identity: a subtotal rounded once, or a sum of rounded component lines. The AISC tables identify the second (1,207 of 1,212 totals foot; E815). Feasibility, explanation and physical accuracy are separate claims, and an explanation is either stated by the issuer or reconstructed from public cells (E691, E694, E695, E698, E816; BD-340).
- On public data the waterfall is a descriptive bridge: factor-domain refusal with a signed additive fallback, rounding intervals on every bar, and closure treated as arithmetic, not attribution (E699; §21.6; BD-333).
- A finding is not a decision: public exceptions ship as evidence-challenge packets, and DecisionCards refuse without actions, states and utilities (§22.1; BD-349).
- Issuer reserve rows are imported assertions with deck and vintage keys; filed rows win over decks, and both vintages of a corrected row are kept (§24.3; GATE-HALL-01; E692, E698; BD-335).
- Exact finite VOI where the decision supplies finite states and utilities. GB-29's no-flip prior is exactly 34/43 ≈ 0.791, not about 0.78: at 0.78 a "low" result still flips the decision and EVSI is about $2.3M, below the test's $9.8M cost (B7 EV-P2-4; GB-29 corrected).
- The agent surface reads from the store: an invented Claim id is refused, and a draft is distinguishable from its registration or adoption (§30; K.2 finding 6).
Killed or narrowed in the plan's earlier text. The ±1-last-digit identity rule (it flips 21 of 306 regional verdicts; BD-272); "zero unexplained failures" as identity acceptance (replaced by five states); a universal causal waterfall on public data; a monetary DecisionCard for every public finding; investor-deck endnotes as the roll-forward fixture; G&A as an inference about the total layer (now FACT, E697).
Settled by B7's decisive pilot, then checked against the bytes. The Africa & Middle East Q1 2025 gap closes from Loulo-Gounkoto's public cells, with the inclusion rule unstated (E816). Loulo-Gounkoto lost control on June 16, 2025, as both filed MD&As say (W1-DR-03 closes), and the Q1 2026 MD&A states that no operating data were provided for Q1–Q3 2025. NOT_PUBLISHED therefore stands for scoring (Appendix I.6), and the Q1 2025 workbook's production cells stay a register item (E818).
Still open (owner or next pass). Why Veladero's per-ounce rows sit on an ounce series no public cell carries (six quantities, Q1 2024–FY2025; E691, E817), and North Mara's Q2 2026 rows on one about 1 koz below the printed ounces (E819); Hemlo's Q4 2025 and FY2025 cost of sales per ounce; and the 2023 Latin America & Asia Pacific region rows that disagree with their own members (E817). Each is a state-(iv) item naming the document that would close it. The cheapest common test is to run the one-cell cost-of-sales check, share-scaled, on every site column of the eight AISC workbooks: if only these columns fail, the cause is site-specific, not a basis rule.
K.5 New capabilities from the idea duel and B7
Three models each proposed 15 ideas (45 in all), scored the other two models' 15 on 0–1000, saw their own scores,
rebutted, steelmanned the rivals' best ideas and named blind spots (planning/duel/DUELING_WIZARDS_REPORT.md). Each
capability below has a first slice that does not assume the M0 code works. Scores are the two rivals' scores,
then any revision after steelmanning.
The headline (INFERENCE). All three models' own first-ranked ideas were about the issuer's published guidance (CC-01, COD-01, AGY-01). Two independent pairs converged on an exact rounding-aware consistency check (CC-02, COD-02) and on per-value provenance tests (blind spots of Claude and Gemini). A third pair converged on recall of issued outputs (blind spots of Claude and Codex). The duel's strongest advice is therefore not a new subsystem: test the evidence chain itself, and use the issuer's own forward statements as the pre-registered forecasts that M0 lacks.
| # | Capability (origin; rival scores) | Subsystem and reader | First slice | Test | Kill or fallback | Bead |
|---|---|---|---|---|---|---|
| 1 | Live-dependency proof (Gemini and Claude blind spots, independent) | Testpit, Portal; gate reviewers, auditors | M0: delete or blank each registered file; perturb each cited cell by one unit in its last place | Seeded hard-coded literal, dead ancestor edge and silent fallback each fail; every M0 scored value passes | If the CI budget is exceeded, sample cells stratified by output, never skip a file | BD-338 |
| 2 | Reproduction kit for outside readers (Gemini blind spot) | Portal; auditors, readers of the public repository | M0: URLs, sha256, label selectors, expected state roots; no workbook bytes committed | A clean checkout plus the issuer's downloads reproduces every state root | A re-posted file with new bytes is a new vintage in the registry | BD-339 |
| 3 | Exact rounding-interval consistency solver (CC-02: 875, 910; COD-02: 830, 875) | Bullion, Portal, Hallmark; controller, IR, auditor, JV partner | M0: linear identities on the ten Mine Stats workbooks; M1: per-ounce identities and roll-forwards | 0 certified conflicts on 10⁴ generated clean tables; known answers E113–E116, E144, E147, E691, E692, E698 | If it never finds more than the interval rule alone, it stays as BD-331's kernel and is not a product | BD-340 |
| 4 | Guidance track record (CC-01: 730 → 790, 865 → 905) | Plumb, Bullion; CFO, IR, compensation committee, board | M0 target: two-reader transcription FY2023–FY2026 with pages; M1: scores | Every value reproduces its page or cell; estimators cover truth 85–95% over ≥ 200 synthetic replicates | Fewer than three resolved years × ten sites with citations in week 1: single-site guidance cards | BD-341 |
| 5 | Guidance completion test (COD-01: 610 → 720, 860 → 900; AGY-01 narrowed: 540 → 640, 430 → 610) | Bullion, Helm; CFO, disclosure committee, site GMs | M1, public lane only: required remaining production and AISC numerator against the site's quarterly envelope and its technical-report nameplate | North Mara H1 2026 reproduced (68 koz against 200–230 koz; E587); synthetic sites with known feasibility | If a year of results never changes an envelope tier, fold it into the track record | BD-342 |
| 6 | Forecast cohorts and outcome vintages (COD-08: 700, 735) | Plumb; every reader of a track record | M0–M1, with the FY2026 forecast record | No missing outcome leaves a denominator; a restatement never overwrites an assessment | None: it is a ledger property | BD-343 |
| 7 | Temporal-cone check (AGY-15: 720, 790) | Plumb, Testpit; QPs, auditors | M1, on the first hindcast and both retrospective cards | Seeded leaks through a variogram fit, an exclusion list and a deck are caught; replay with post-cut objects removed matches | Ancestors without availability times make the card refuse; the rule is never relaxed | BD-344 |
| 8 | Disclosure lint in cited mode, with a publicness verdict (CC-04: 810, 810; converges with COD-10, AGY-05 and Claude's blind spot B2) | Adit; disclosure committee, IR, AI agents | M1: cited mode and six metric keys over public text | Two-reader labelled set: no false verified; publicness verdicts match filing dates |
Discovery precision below about 90%: cited mode only; counsel declines the publicness verdict: drop it | BD-345 |
| 9 | Reliance status and outbound register for issued outputs (Codex and Claude blind spots, independent; COD-04 narrowed) | Adit, Plumb; IR, audit committee, JV recipients, agents | M1: synthetic issuer, one report, two holders, one later defect | A withdrawn output is refused for current reuse while its digest still verifies | Holders never reuse detached outputs: keep only the export-path check | BD-347 |
| 10 | JV mirror (CC-06: 830, 850) | Portal, Bullion; JV partners, both audit committees | M1: NGM and Pueblo Viejo against Newmont's filings, Kibali against AngloGold Ashanti's | Production mirrors FY2023–FY2025 reproduce both filings' cells; each bridge cites its own reconciliation | Coarser partner perimeter: reconcile there; cost lines refuse: production and capex only | BD-346 |
| 11 | Evidence-challenge packet (B7 H-P2-6, survived) | Plumb, Bullion; source owners | M0, with the discrepancy register | Every register item renders; none carries an invented NPV, CVaR or likelihood | None | BD-349 |
| 12 | Non-interference check at the wall (Gemini blind spot) | Bedrock; general counsel, IR, agents | M2, when private data arrive (GATE-DATA-01) | A seeded MNPI note that changes a ranking is caught | Deterministic tool outputs only; prose stays behind the lint | BD-348 |
| 13 | Target disclosure checks (CC-10: 760, 785) | Lodestar, Helm; BD and M&A | M1–M2: synthetic juniors, one developer cash-flow replay | Seeded selective reporting caught; one public NPV reproduced | Irregular release formats: cited mode, a person enters intervals | BD-350 |
| 14 | Comparability engine (CC-12: 705, 705) | Bullion, Portal; CFO, IR, remuneration committee | M1–M2: AISC and production for four issuers | Synthetic claim set classified correctly | Definitions too thin: production and capex only | BD-355 |
| 15 | Untested-ore decision bounds (COD-28: 590, 815; contested) | Crucible, Strata, Helm; metallurgists, QPs | M2 | Synthetic strata known answers | Blending interactions declared: refuse | BD-351 |
| 16 | Evidence-origin accounting (COD-03: 620, 805; contested) | Plumb, Corebox; QPs, statisticians | M1–M2 | Batch-bias known answer; a reprint never narrows an interval | Overlaps domain bias models: keep only the schema | BD-352 |
| 17 | Compensation-formula exposure (Codex blind spot; the R7 compensation-committee row) | Bullion, Helm; remuneration committee | M1: synthetic scheme; one disclosed formula if its terms suffice | Every threshold boundary enumerated; a range across a threshold is never a point | No formula reproducible from disclosures: an ambiguity warning only | BD-353 |
| 18 | Insurance recovery evidence (Gemini and Codex blind spots, independent) | Helm, Bullion; risk and insurance team, CFO | M3, after the sponsor gate | Synthetic known answers | No repeatable insurer question, or terms unavailable | BD-354 |
| 19 | Pilot protocol card (CC-05: 625, 765) | Testpit, Crucible; sponsor, site GM | M1, before GATE-DATA-01 | Reviewed by the sponsor | Power stated as an envelope; no ranking fallback | BD-356 |
| 20 | Salted review (Claude blind spot B4) | Testpit; gate reviewers, QPs | M0, internal reviews only | Two rounds report a catch rate with a Clopper–Pearson bound (0 of 5 caught bounds it below about 52%) | Reviewers decline; any seed reaches an export: stop | BD-357 |
Merged, parked or dropped (with the reason).
| Idea | Disposition |
|---|---|
| CC-09 guidance lifecycle; COD-16 intervention-affected outcomes | Merged into BD-341 and BD-343; the sequential revision guarantee is dropped |
| COD-10 bounded sentences; AGY-05 prose verifier | Merged into BD-345 |
| COD-04 decision recall; Claude's B3 outbound register | Merged into BD-347 |
| COD-07 JV disagreement; COD-09 comparability frontier | Public versions are BD-346 and BD-355; partner-agreed exports wait |
| CC-13 sealed-answer benchmark | Folded into GATE-ROBOT-01 |
| CC-03 spreadsheet lifter; AGY-02 workbook autopsy | Narrowed to a structural audit at M2: public formulas sit almost wholly in three workbooks (1,092 #REF! cells in Q2 2026 Mine Stats, E466; 304 formula cells in each 2026 AISC file, 302 of them external references) |
| AGY-12 geomet bridge | Its critique of BD-300's guarantee stands; folded into BD-300 |
| AGY-07 stream terms; COD-05 metal to spendable cash | Folded into BD-314 |
| AGY-09 stockpile segregation; AGY-14 stope sequencing | One candidate operator in BD-312; the two-sided paste window in BD-307 |
| CC-07 intertemporal-shift ledger (450, 825); CC-08 fiscal mirror; CC-11 conversion bounds; CC-14 board delta pack | Parked: contested, or their formulations need repair first |
| AGY-04 block-model forensics (450, 340); AGY-03 shadow-price loop (340, 300) | Parked: both rivals scored them low, and AGY-03's chance constraint is unproven |
| AGY-08 data room (400, 180); CC-15 disruption library | Dropped by their authors; CC-15 survives as a cited fixture of quantified events |
| Gemini blind spots: statutory workpapers (IFRIC 20, IAS 2, IAS 36, IAS 37); lender completion tests | Parked to M3 with FA: per-pushback stripping data and credit agreements are not public |
K.6 Beads added (BD-321 to BD-357)
| Range | Work packages | What they carry |
|---|---|---|
| BD-321, BD-322, BD-329–BD-334 | WP-03 | K.2's pre-push steps, the uncited-number and filed-page checks, the five-state ledger, vintage keys, the public-data waterfall, the forecast-record manifest |
| BD-323–BD-327, BD-357 | WP-00 | Bead and INT record corrections, the close-reason check, INT-AS-001a, deny.toml in CI, the CONTRACT template, salted review |
| BD-328 | WP-06 | One refusal registry |
| BD-335, BD-342, BD-346, BD-355 | WP-13 | Issuer reserve rows, the completion test, the JV mirror, the comparability engine |
| BD-336 | WP-10 | Metallurgical-balance import for the recovery-led route; BD-204 now depends on it, so WP-12 depends on WP-10 |
| BD-337 | WP-05 | INT-AS-001 criterion 8 |
| BD-338–BD-341, BD-345, BD-347, BD-349 | WP-03 | Live-dependency proof, reproduction kit, the exact solver, the track record, the lint, the reliance check, challenge packets |
| BD-343, BD-352 | WP-02 | Forecast cohorts, evidence-origin accounting |
| BD-344 | WP-08 | Temporal-cone check, beside the hindcast tool |
| BD-348, BD-356 | WP-12 | Non-interference at the wall, the pilot protocol card |
| BD-350 | WP-15 | Target disclosure checks |
| BD-351 | WP-16 | Untested-ore bounds, beside geomet coverage |
| BD-353, BD-354 | WP-14 | Compensation-formula exposure, insurance recovery evidence |
Edges added to existing beads: BD-065 ← BD-322 (the harness runs on registered inputs only); BD-068 ← BD-334; BD-074 ← BD-338 (the M0 end-to-end run includes the live-dependency proof); BD-076 ← BD-343; BD-204 ← BD-336. The generator reports 357 beads, 589 edges, 0 cycles and an unchanged 29-bead longest chain.
K.7 Public-lane dates (2026-10-30)
The public lane keeps four dates: the Q3 2026 workbook read on 9 Nov 2026; per-site Q4 2026 estimates with 80% ranges, time-proved by 31 Dec 2026; the demonstration, cut-off reproduction included, ready at the end of January 2027; scoring against the FY2026 results in February 2027.
- BD-067's edges. BD-047 and BD-059 are replaced by BD-322 (the reader), BD-334's stamped rules and the Q3 2026 vintage. With the old edges BD-068 sat behind 31 open beads, mostly WP-00/WP-01. BD-334's frame freezes and hashes the record itself; BD-047 later ingests it.
- Priorities. BD-334, BD-067 and BD-068 are P0 with due dates; the Lumwana gap (bd-srqc) is P1, since the pilot's mechanism rests on it.
- Open scope. BD-274 reproduces seven cut-offs (E182–E184); the target is every cut-off a technical report states.
- Later vintages stop when the author gains private access (§21.6).