North-Star scenarios (before → after; TARGETs)

854 wordsPlan version 0.1

Each scenario is an acceptance narrative. The milestone in brackets is where it first becomes demonstrable.

  • NS-01 AISC waterfall [M0/M2]. Before: the CFO asks why gold AISC moved between periods, and FP&A returns a narrative citing "lower grades, fuel, royalties" three days later. After: a certified waterfall (grade, recovery, tonnes, price-linked royalty, fuel, FX, sustaining capex), descriptive on public data and causal only once the site's metallurgical balance is in (M2; §21.6). Each bar cites its evidence, and the whole waterfall replays offline. At M0, public data support only these bars for gold sites: tonnes, grade, recovery, the sold/produced ratio, royalties per ounce and the AISC-workbook components (cost of sales, depreciation, by-product credits, NCI, G&A, minesite exploration, sustaining capex and leases, rehabilitation accretion), with no residual plug. Fuel, FX and labour bars need site data and arrive at M2 (R7-C044, Appendix K.3).
  • NS-02 Reserve-replacement bridge [M0/M3]. Before: different reserve-replacement percentages sit in different documents. After: one page renders reserve replacement under each named basis from one cited roll-forward.
  • NS-03 Monthly reconciliation [M2]. Before: a five-day spreadsheet exercise. After: a posterior in hours, with F1/F2/F3 intervals. A gross error is localized to the mill sampler, and the metallurgist attests the finding.
  • NS-04 Guidance setting [M3/M5]. Before: ranges set without a track record in view. After: ranges derived from calibrated site intervals, shown beside the track record ("5 of the last 6 quarters inside the 80% band").
  • NS-05 QP support [M3]. Before: the classification rationale lives in the QP's head. After: per-domain evidence (data spacing, slope of regression, conditional-simulation probability, reconciliation record) sits beside the QP's signed act. A reconciliation section is drafted for the QP's review.
  • NS-06 Expansion card [M4]. Before: a single capex point estimate. After: a reference-class-shifted capex distribution, P(overrun > 25%), the VOI of further geotechnical drilling, and "what would change our mind".
  • NS-07 Junior deal [M4]. Before: a spreadsheet for one structure. After: earn-in, stake, option and walk-away are compared on the same prospectivity posterior and stage gates. Each card shows the implied resource-conversion rate in the junior's share price and its distance to Tier One.
  • NS-08 Hindcast honesty [M4]. "Would we have flagged this district's discoveries with what was known in 2005?" The answer comes with its confidence interval and its count of positives, including a null if that is the truth.
  • NS-09 Dry holes, honestly [M4]. Before: three dry holes "kill" a target. After: Lodestar shows the target's probability fell from 0.20 to 0.06, if the holes could see the footprint, and to 0.09 under the detection uncertainty. Because the search is regional (Cox mode), no probability was moved elsewhere. The cheapest next move is a deeper hole on the eastern flank (GB-02).
  • NS-10 Stockpile truth [M2]. Before: survey, dispatch and weightometer are averaged. After: tonnage is admitted only when the three agree within tolerance. Otherwise its state is conflicted and an investigation opens.
  • NS-11 Price-deck change [M3]. Before: the reserve price deck moves and weeks of re-runs follow. After: reserves, DD&A inputs, impairment headroom and Tier-One filters recompute with new digests, and no stale caches survive.
  • NS-12 Surprise monitor [M5]. The anytime-valid monitor on F2 coverage trips, and a hypothesis-review case opens with the evidence attached. Nothing retrains silently.
  • NS-13 TSF evidence state [M5]. Before: a green dashboard. After: "4 of 11 failure modes monitored; 2 piezometers stale more than 14 days; last independent review 7 months ago". The system never says "safe".
  • NS-14 Auditor replay [M3]. The external auditor verifies the AISC certificate and its FA bundle offline, without access to the live system.
  • NS-15 Agent query [M2]. An agent asks for metal in circuit last week. It receives a certified figure, or FMINE-REF-201 (no claim in domain): mill sampler offline 2 days.
  • NS-16 Plan with gaps [M6]. Before: "the optimal LOM plan". After: an NPV distribution, a dual bound 1.8% above the plan, a sampling standard error of 0.9%, and a calibration note that tonnes-to-mill forecasts have run 6% high for 8 quarters (the correction is applied and visible).
  • NS-17 Blast to mill [M6]. Before: fragmentation is anecdotal. After: each shot's design, as-drilled deviations, measured fragmentation and downstream mill throughput sit in one lineage. Powder factor changes are DecisionCards with measured outcomes.
  • NS-18 Feed forecast [M5/M6]. The plant manager sees next week's feed blend as a distribution (hardness, head grade, preg-robbing carbon, arsenic) with predicted throughput and recovery. Last month's prediction is scored beside it.
  • NS-19 Roster risk [M5]. Before: roster gaps surface on the day. After: Muster forecasts the probability of falling below minimum competent crew per critical role per shift, flags fatigue-rule violations before approval, and records critical-control verifications with evidence.
  • NS-20 Capital program [M4]. The board sees one CapitalProgram: sustaining, expansions, exploration stages, a junior earn-in, a stream as tail insurance, and buybacks. Each is valued on the same scenarios, with CVaR, selection stability across resampled scenarios, the shadow price of each pay-metric constraint, and the three flip conditions that would change the allocation.