FrankenMining

Goals, non-goals and anti-goals

1,012 words3 subsections2 tablesPlan version 0.1

On this page3
4.1 Goals4.2 Non-goals4.3 Anti-goals (things that would make the product worse even if requested)

4.1 Goals

ID Goal Primary section
GOAL-001 Every number crossing a module boundary is a Claim with support, evidence class, calibration flag, UU term, validity and provenance. §8
GOAL-002 Every resolvable forecast is registered before resolution and scored by a proper rule. Calibration is reported per family, segment and author (models, people, agents). §10
GOAL-003 Known knowns, known unknowns and unknown unknowns are represented natively with honest probabilities, or explicitly unpriced flip margins. There are no fabricated probabilities. §9
GOAL-004 Regional prospectivity reasons Bayesianly about undiscovered deposits using spatial context, analogue terranes, deposit models, exploration effort and typed negative evidence. §11
GOAL-005 The value of the next survey or drill program is computed as decision-relevant VOI, and the budgeted drill portfolio carries an approximation certificate. §11
GOAL-006 Drillhole, sample, assay and QA/QC data are immutable, superseded never edited, MNPI-embargoed and conserved through compositing. §12
GOAL-007 The subsurface authority is evidence plus a hash-addressed belief specification. Every block model, realization and wireframe is a certified, regenerable projection at a declared support. §13
GOAL-008 frankensim's geometric primitives, sparse solvers, evidence colours and materials-database discipline are used, by lift with provenance until re-convergence, for block grids, wireframes, exact predicates, volumes, seepage, ventilation and wear. §13, §27
GOAL-009 Geotechnical evidence state per failure mode, TARP automata and slope/stope design inputs are first-class. The system never signs off. §14
GOAL-010 Strategic, tactical and short-term plans carry the three-gap certificate. Pseudoflow pit limits match a lab oracle exactly. §15
GOAL-011 "Optimal ore mix at best unit cost" is computed by cut-off, stockpile and blend policy optimization under geometallurgical constraints, consistent with accounting truth. §15.6
GOAL-012 An operations twin of record holds as-built geometry, drill and blast, load and haul cycles, equipment health, ventilation and dewatering state. It is read-only to OT. §16
GOAL-013 Processing models (comminution, flotation, leach, CIL/CIP, refractory, SX-EW, tin gravity) predict throughput and recovery with uncertainty and reconcile to the metallurgical balance. §17
GOAL-014 Tailings, water and closure: an evidence state for all GISTM requirements, water balance, ARD classification refusals, closure cost estimates linked to ARO. §18
GOAL-015 Workforce: rosters, competencies, fatigue, critical-control verification, driver-based budgets and productivity, with forecastable schedule compliance. §19
GOAL-016 Reconciliation: a joint posterior over the material-flow graph, conservation enforced at commit, F-factors as posterior quantities, attribution with refusals. §20
GOAL-017 Accounting through franken_accounting: the 17-part mining domain pack, monthly Merkle-folded summary posting, human review, and acceptance tests against the pinned FA rev. §21
GOAL-018 Reproducible, versioned metric definitions (AISC, AIC, cash cost, C1, GEO, reserve replacement, ROCE) with certified causal waterfalls. §21.6
GOAL-019 DecisionCards for every material decision: alternatives, loss matrix, expected loss, regret, flip margins, VOI, monitors, kill gates and required attestations. §22
GOAL-020 Executive capital allocation as one CapitalProgram over a shared scenario index: sustaining, growth, exploration plays, junior equity and earn-ins, M&A, streams, buybacks. §23
GOAL-021 A resource/reserve register with QP/CP attestation workflow, code-agnostic renderers (JORC, NI 43-101, S-K 1300, CRIRSCO) and a data-verification evidence index. §24
GOAL-022 Multi-site federation: single-writer authority cells, certified sync over intermittent links, residency-aware, MNPI- and JV-walled. §26, §31
GOAL-023 A robot-first CLI, daemon, MCP and TUI with one verb registry. Agents get certified numbers or typed refusals. §30
GOAL-024 Deterministic replay: the same inputs, seed and code revision give the same certificate digest. An auditor replays offline with fmine-verify. §26, §33
GOAL-025 Synthetic-truth mines and districts exercise every engine with known answers, misspecification and control conditions. §33.3

4.2 Non-goals

ID Non-goal Reason
NONGOAL-001 Replacing SAP S/4HANA, Pitram, DISPATCH/MineStar/FrontRunner, Leapfrog, Whittle or Deswik, at any horizon FrankenMining is the evidence layer that reads their exports (§1.5). Replacement is neither the wedge nor the destination (B5 R-b1, R-c1).
NONGOAL-002 Fleet, plant or any other equipment control No write conduit to ISA-95 Levels 0–2 exists or will exist (§31.3).
NONGOAL-003 Classifying resources or reserves; signing geotechnical or tailings safety; asserting regulatory compliance E023, E031. These belong to humans.
NONGOAL-004 Building a general ledger FA is the book of record (E019).
NONGOAL-005 Competing with AI operating platforms on computer-vision safety, predictive-maintenance or procurement agents B5 F1. FrankenMining is what those agents cite.
NONGOAL-006 A general-purpose commercial MILP solver Mining problems decompose; domain decomposition with dual bounds wins (§15).
NONGOAL-007 Full-physics multiphysics in year 1 (coupled hydro-mechanical TSF models, DEM comminution) frankensim is unconverged (E001). Use correlation cards and lifted solvers with validity domains.
NONGOAL-008 A hidden aggregate "ESG score" R5 #45. Components are shown, never a composite.

4.3 Anti-goals (things that would make the product worse even if requested)

  • No probability without a calibration flag. No single number without an interval, an evidence class and a source.
  • No dashboard-first product. The unit of delivery is a Claim, a scored forecast or a DecisionCard.
  • No private-data forecast leaves the tenancy. No public-lane author holds private access (§31.1).
  • No hindsight claims ("we would have saved project X") unless they are built bitemporally as known at the decision date.
  • No optimizer that is "merely different" from its oracle (R5). Known answers first, then improvements with certificates.
  • No silent retraining. Every model change after a surprise goes through an InvestigationCase (§10.5).
  • No plug figures. Conservation failures are refusals, not adjustments (§20.2).