Evidence register index
443 words1 tablePlan version 0.1
The register is planning/mor/MOR_CASE.md. It is append-only: corrections are appended rows (e.g. the E029
correction), never overwrites.
| Ids | Topic | Source |
|---|---|---|
| E001–E010 | frankensim state, liftable crates, geometry coupling, physics gaps | R1, read-only survey |
| E011–E016 | asupersync, fgdb, fsqlite, suite idioms, storage by authority shape | R2 |
| E017–E018 | Numerics coverage and gaps | R3 |
| E019–E021 | franken_accounting posture and the 17-part mining domain pack | R4 |
| E022–E023 | FrankenTextiles lessons; the four false flags and authorization refusals | R5 |
| E024–E027 | Barrick, executive pay metrics, industry economics, OEM consolidation | R6 |
| E028–E032 | Prospectivity, geostatistics and reconciliation, planning, reporting codes, epistemics | R7 (E029 and E031 carry appended corrections) |
| E033 | The FrankenSurveillance pattern | FSS, read directly |
| E034 | Newmont's NGM default notice (3 Feb 2026) and settlement (10 Aug 2026); NGM data JV-sensitive | Newmont FY2025 10-K and Barrick Q2 2026 release (W5 E628, E629); corpus E139 |
| E035 | The industry's believed proofs are single-asset uplifts (Freeport TROI at Bagdad, consultant-reported, FACT[U]); twins stall on people (Lihir) | B5 §9; W5 E643, E644 |
| E101–E149 | Barrick public statistics and site decks | planning/corpus/C1 |
| E151–E199 | Nevada technical reports | planning/corpus/C2 |
| E201–E249 | Africa technical reports | planning/corpus/C3 |
| E251–E299 | Americas and PNG technical reports | planning/corpus/C4 |
| E301–E349 | Reko Diq Early Works ESIA | planning/corpus/C5 |
| E351–E399 | Textbooks (reference only) | planning/corpus/C6 |
| E401–E449 | Host-state events: Mali 2023 Code and the Loulo-Gounkoto dispute, Porgera, Cobre Panamá, DRC Code 2018, Twiga | planning/research/W2 |
| E451–E499 | Barrick Mine Stats Q1 2024–Q2 2026: retrieval, layout, discrepancies, site series | planning/research/W1 |
| E501–E549 | Data-residency and mining-data statutes, 12 countries | planning/research/W3 |
| E551–E599 | M2 site choice and site-data timing | planning/research/W4 |
| E601–E649 | Primary-source verification of the plan's figures | planning/research/W5 |
| E651–E655 | Crate-name and asupersync-pin checks made directly | planning/mor/MOR_CASE.md |
Status: E001–E035 were used by the Brenner passes and audited in the review rounds. For the corpus rows E101–E399,
AUDIT_4 (a second reader) reports 273 exact, 18 confirmed with nuance and 3 page-locator fixes (E146, E211,
E212), with no substantive errors, and it re-read the 18 quarterly Mine Stats and AISC workbooks
(planning/mor/audits/AUDIT_4_corpus_claim_verification.md). The research rows E401–E655 were written from primary
sources by the agents that cite them and have had no second reader yet (H-4). E656–E672 record the second-reader
checks of the concurrent revision (Appendix H.5b).