1,349 words1 tablePlan version 0.1

The six Brenner passes argued from the MOR case file (planning/mor/MOR_CASE.md, pivotal questions PQ-1 to PQ-7 plus B6-SQ1 to B6-SQ4). Each verdict survived a refuter-first attempt and a forced third alternative. Sources: planning/brenner/B1–B6.

Pass · question Hypothesis Verdict Where it lives
B1 · PQ-1 subsurface representation Kriged block model as the authority Killed as authority; survives as the DeclaredOk projection with bit-for-bit parity §13.1
B1 Ensemble of conditional simulations as the authority Downgraded: realizations are the exchange currency, regenerated, never stored as truth §13.1, §13.5
B1 Generative hierarchical belief object Survives, amended: staged ("cut") inference, hypothesis set plus catch-all, procedure certificates §13.1–13.3
B1 Event-sourced data plus recipes only Survives, merged as the storage and provenance substrate §13.1, §26
B1 Support-indexed authorities glued by restriction maps Downgraded to the reconciliation consistency layer §13.1, §20
B1 QP wireframes as the authority Downgraded to AttestedInterpretation inputs with a contact-uncertainty model §13.1
B2 · PQ-2 prospectivity (a) Pixel-wise ML as the object of record Refuted as the object of record; kept as a covariate §11.2
B2 (b) Hierarchical marked, thinned Cox process Survives as the regional object of record §11.2–11.5
B2 (c) Mineral-systems model standalone Refuted standalone; survives as the factorization of log-intensity §11.2
B2 (d1) Search-theoretic POMDP Survives at prospect scale only (phase 2) §11.2
B2 (d2) Hybrid (a)+(c) → (b) → (d1) Adopted architecture §11.2
B2 N0 MapMark4-degenerate tract model Checked null; parity oracle and deterministic fallback §11.2
B2 · PQ-5 epistemics Single global posterior / credal sets as stored belief Both refuted as the stored belief; the layered epistemic stack is adopted (Bayes inside models, ε-contamination envelope for irreversible actions, Manski bounds) §9.2
B3 · PQ-3 planning H3a Deterministic chain Rejected as the decision basis; retained as the parity baseline in every PlanCertificate §15.1
B3 H3b Simultaneous stochastic optimization (COSMO-style) Conditional adopt, only through the three-arm out-of-sample VSS gate §15.1, GB-14
B3 H3c Information acquisition as a decision Adopt narrowly on discrete commitments §15.1, §22
B3 H3d Hierarchical decomposition with certified gaps Adopt as the architecture §15.1, GB-15
B3 H3e Policy search over a frozen skeleton Adopt for tactical policies §15.1
B3 · PQ-7 capital H7a NPV/IRR plus hurdle Rejected as the rule; retained as a reporting column §23.1
B3 H7b Mean-CVaR over shared scenarios Adopted as the risk layer, always with selection frequency §23.1, GB-30
B3 H7c Real options plus Gittins/bandits Staged-option valuation adopted; Gittins and regret guarantees rejected §23.1
B3 H7d Per-share two-stage CapitalProgram Adopted as the decision object §23.1–23.3
B4 · PQ-4 SQ1 authority H1-A fgdb as authority Falsified for 3 of 5 contexts §26.1
B4 H1-C fsqlite as relational authority Falsified as authority §26.1
B4 H1-B One FM-owned mechanism; everything else projects Survives, conditional on GATE-STORE-01 (KILL-4 fallback) §26.1
B4 · SQ2 topology H2-A central / H2-B site-sovereign / H2-C hybrid per-context cells A and B falsified; H2-C survives §26.2–26.4
B4 · SQ3 frankensim Path/git dependency vs reimplementation vs lift Lift-only in every production posture §27.1
B4 · SQ4 FA contract Direct library use vs subprocess fad plus fa --json subprocess from one bridge crate with a signed intent outbox §21.3, §27.2
B4 · SQ5 workspace fm- vs fmine-; crate map fmine- prefix (verified collisions); B4's 39 crates grown to 59 in §28.3 §28
B4 · SQ6 security Capabilities alone / perimeter only / layered Layered security adopted §31
B4 · SQ7 Avathon Replace / feed blindly / anchor-pinned system of record Verdict C: FrankenMining is the system of record; Avathon is a cognition-plane consumer under a five-point contract §32.3
B5 · PQ-6 wedge H-a Exploration and capital first Deferred to M4 (second wedge) §37.1
B5 H-b Reconciliation and metal accounting as system of record first Rejected as system of record; kept as assurance §37.1
B5 H-c Full operating twin first Rejected for 24 months; becomes the M6 twin of record §37.1
B5 H-d Evidence spine plus thin slice Mandatory but narrowed §37.1
B5 H-e DecisionCards Adopted as the delivery format §37.1
B5 H-f Guidance & Reserve Assurance Recommended wedge (GB-38) §37.1–37.2
B5 H-g TSF evidence state or CCV first Deferred to M5 §37.1
B6 · B6-SQ1 Headframe H6.1a Smooth cycle-time curves + match factor + static diesel/grid power Killed as operational authority; kept as PO-HEAD-2 analytic ceiling §16.4, GB-17
B6 H6.1b Real-time closed-loop dispatch twin writing to FMS/AHS/PLC Rejected permanently (INV-002, NONGOAL-002, G-HEAD-1) §16.1, §31.3
B6 H6.1c AHS intersection-token & safety-bubble DES + EnergyEnvelope microgrid co-optimizer + G-HEAD-7 uncured-fill refusal Adopted as the operational simulation & scheduling-coupling architecture §16.3–16.4, §16.8, GB-40
B6 H6.1d (forced third) Event-sourced state-transition twin + MWD/blast-movement spatial assimilation Adopted and merged with H6.1c as the site authority substrate (CELL-TEL, CELL-FLOW) §16.2–16.3, §26.8
B6 · B6-SQ2 Crucible H6.2a Static domain-average or shift-by-shift steady-state regression Killed as fitting/reconciliation model; kept as R0 published-card reproduction mode §17.3, GB-41
B6 H6.2b Four-layer versioned CorrelationCards + N-tank RTD deconvolution + curvature correction + two-sided stoichiometric blend windows Adopted as the plant prediction & planning-coupling architecture §15.6, §17.3, GB-41
B6 H6.2c First-principles multiphase CFD / population-balance digital twin Rejected for v1 (unidentifiable parameters, violates G-CRUC-5 when uncalibrated) §17.1, §17.8
B6 H6.2d (forced third) AMIRA P754 check-in/check-out bilinear state estimation + 3D heap/stockpile voxel twin (G-CRUC-6) Adopted and merged with H6.2b as the plant accounting authority §17.5, §20.8
B6 · B6-SQ3 Freeboard H6.3a Compliance dashboard ("safe / conformant / green-light") Rejected permanently (INV-002, G-FREE-1, G-FREE-2) §18.1, §18.7
B6 H6.3b Generalized RequirementSet traceability + EsCommitment (OB-COMMIT) + three-valued OB-TARP + environmental certificate reconciliation Adopted as the governance & obligation substrate §18.2–18.4
B6 H6.3c Autonomous 3D coupled hydro-mechanical Biot/liquefaction FEM as sole authority Rejected as sole authority (NONGOAL-007, INV-002); external EoR models enter as attested claims §18.3
B6 H6.3d (forced third) Coupled physical-financial twin (B̄ = Δu/Δσ_v, Naranjo PAG co-disposal shadow pricing, three-measurand ARO completeness G-FREE-11) Adopted and merged with H6.3b §18.3, §18.6, GB-42
B6 · B6-SQ4 Muster H6.4a Individual operator surveillance leaderboard + soft fatigue penalties Rejected permanently (G-PUSH-1, G-MUST-1..5, W3 residency statutes) §19.1, §19.8
B6 H6.4b Privacy-by-design pseudonymous crew analytics + hard hours/statutory/competency constraints + covariate-adjusted partial pooling + G-MUST-6 anti-Goodhart CCV monitor Adopted as the workforce & safety-verification architecture §19.1–19.6, GB-43
B6 H6.4c Unadjusted raw shift-tonnage ratios and raw CCV completion counts Killed as decision metrics (confounded by geology/haul and Goodharted under pay incentives) §19.5–19.6, GB-43
B6 H6.4d (forced third) Registered causal DiD / staggered-rollout attribution + exact LMDI labour variance bridge (PO-MUST-3) + denominator-typed local content Adopted and merged with H6.4b §19.3, §19.6–19.7