The public-source research pass (W1–W5)
624 words4 subsections1 tablePlan version 0.1
On this page4
J.1 Why it ran
Appendix I ended with questions "only the owner can answer". Most of them have public answers. Five agents
looked for primary sources on 2026-10-28/29 (filings on SEC EDGAR, Barrick's IR host, official gazettes, statute
texts) and wrote one report each to planning/research/. Two smaller questions (crate naming, the asupersync 0.6
bump) were checked directly. No agent edited the plan; the fold-in was done afterwards with exact-match patches.
J.2 What each pass found
| Pass | Question | Result | Where folded |
|---|---|---|---|
| W1 | The missing Mine Stats workbooks | All ten quarters Q1 2024–Q2 2026 retrieved with MD&As and AISC workbooks; Q3 2026 releases 9 Nov 2026. Structural identities hold everywhere; 17 new discrepancy candidates; Copper-Total recovery is a constant 94%; a Porgera label of 47.5% against values at 24.5%; the corporate AISC layer is positive in all 16 periods | §21.6, §37.3, I.2, I.5, I.6, I.9 |
| W2 | Porgera 2020, Cobre Panamá 2023, Mali 2023 Code | All primary-sourced. Mali's code is Loi n°2023-040, applied retroactively to Loulo-Gounkoto ($200M, Apr 2026; royalty about 18%); Porgera's 2017 extension application existed; DRC Art. 80 renewal costs +5% State equity | §10.1, §21, §23.4, RISK-26 |
| W3 | Data-residency statutes (OPEN-B4-01) | 72 statute-cited rows for 12 countries; hard localisation in Zambia, Tanzania, DRC and Mali for personal data; Reko Diq governed by its agreement and BMR 2002 | §26.14, §31.2, RISK-21, BD-292 |
| W4 | M2 site and site-data timing | Keep Lumwana (only wholly owned operating mine; grade-adjusted recovery gap 1.7–2.7 points, $30–57M/yr); site data by month 7 is not assumed, so M2′ is fully planned | §34.4, §37.2, §37.3 |
| W5 | The plan's industry and Barrick figures | 72 claims: 49 verified, 2 corrected (Tanami 2 history; the 190%/504% bases), 15 partly right, 4 secondary-only, 2 unverifiable | Part I, §11, §14, §16, §21, §23, Appendix G |
| Direct | fmine naming; asupersync 0.6 |
fmine is free on crates.io; asupersync 0.6 is unreleased and only frankensympy's runtime crates follow main |
§28.1, §31.4 |
J.3 Corrections that change an executive statement
- Tanami 2 went from $850–950M to $1.7–1.8B (about 1.8–2.1×), not "from $395M": $395M was spend to June 2022 (E631, E632).
- Reserve replacement: 190% and 504% cover the same three years; they differ by metal (gold vs GEO), not by window (E603, E604). OPEN-BULL-4 is closed.
- Barrick's pay GEO uses fixed reserve prices, so the gold price does not move pay GEO (E606; GB-27's flip).
- North American Barrick IPO: the official target is still end-2026; the CEO said on 29 Sep 2026 it may slip into January 2027 (E615, E616).
- Mali settlement: Barrick's filing gives $253M (28 Nov 2025), not the $430M press figure in R6 (E408).
- Autonomy at Cortez was retrofitted in May 2026 and was due to roll out in Q3 2026; it was not yet "live" (E619).
- Loulo-Gounkoto: the reset is a fiscal one (2023 Code, 18% royalty, retroactive to 2024), with ownership unchanged at 80% (E406, E412–E414).
J.4 Collisions repaired in a concurrent edit
A concurrent revision (2026-10-28, 23:44 local) added BD-309–BD-320 and new design text. It reused two identifiers that already had meanings: the new support-regularization guard took G-STRATA-6 (already
"QA/QC invalidation after the cut") and the pad-tree dual bound took PO-LODE-5 (already the MapMark4 parity
test). They are renumbered G-STRATA-11 and PO-LODE-15, with table rows, and the new refusal code 108 was added
to the FMINE-REF-1xx registry. That edit's content is otherwise kept as written. Its Loulo-Gounkoto cost figures
were Q2-only and are now labelled with the H1 values beside them (E638).