Highwall: geotechnics and ground control
2,089 words6 subsections5 tablesPlan version 0.1
On this page6
Highwall is the most safety-critical part of the system's cognition. Its doctrine is therefore the strictest:
- FrankenMining computes, tracks evidence state, forecasts and scores. The geotechnical engineer and the EoR
sign.
geotechnical_signoffnever appears as true (INV-002). - A stale instrument is
not_observable, never "stable" (FMINE-REF-404). - Probabilities of failure are stated only with an admissible reference class or a vetted model. Otherwise the UU term is a flip margin with the probability not stated (§9.3).
14.1 Rock mass model
- Inputs from Strata:
- geotechnical domain partition;
- RQD, fracture frequency, joint condition;
- UCS fields (via the UCS(Is50) card);
- GSI/RMR/Q as ordinal fields with elicitation records;
- structural fabric per structural domain (Fisher or bimodal Bingham distributions of joint sets, with persistence and spacing distributions).
- Material models are cards that consume field projections:
- Hoek–Brown (σci, mi, GSI, D disturbance), Mohr–Coulomb equivalents, and anisotropic (ubiquitous-joint) models;
- each card has a validity domain and colour.
- Card rules from the corpus (E392, E396–E398).
- Water counted once. RMR carries a groundwater rating and Q carries Jw. An index-derived strength card
declares
water_basis: dry_normalised | as_logged; an LEM run with explicit §14.5 pore pressure accepts onlydry_normalisedinputs (groundwater rating dry, Jw = 1). Otherwise lint raises "water double-counted" (INFERENCE). - Q card: Q = (max(RQD, 10)/Jn)·(Jr/Ja)·(Jw/SRF) (E397). Its basis is tunnel support, so open-pit use is
OutsideValiditywithout site calibration (INFERENCE). - UCS(Is50) card: UCS = k·Is50 with k calibrated per domain; the textbook prior k ≈ 20 with ±20% test error
(E396) alone is
Assumed. - Classification indices are never the sole design input (E392).
- Model currency. Every interpretation and analysis feeding a design carries its date and review state. Carlin's GQ7CN highwall failed on 11 Feb 2024 (~1 Mt); the review board found the LOM designs rested on a 2008 geology model and 2018 analyses that were not independently reviewed (FACT, E195). An unreviewed or stale basis renders on the slope card.
- Water counted once. RMR carries a groundwater rating and Q carries Jw. An index-derived strength card
declares
14.2 Open-pit slope design support
| Analysis | Method | FrankenMining output |
|---|---|---|
| Bench-scale kinematics | Planar, wedge and toppling admissibility from joint-set orientation distributions against face orientation per design sector (stereographic logic); Monte Carlo over orientation, persistence and friction | P(kinematic release) per bench face per sector, with expected spill and catch-bench retention; registered for scoring against mapped bench failures |
| Inter-ramp and overall | Limit equilibrium: Bishop simplified, Janbu, Spencer, Morgenstern–Price on 2D sections cut from the belief ledger, with pore pressure from §14.5 | FoS distributions over realizations of strength, structure and pore pressure; PoF = P(FoS < 1) only when the inputs are calibrated; otherwise a flip margin ("the overall slope reaches FoS 1.0 if pore pressure ratio rᵤ > 0.32") |
| Acceptance criteria | Site acceptance policy registered as data, with dac_basis ∈ {FoS, PoF, FoS+PoF} and a nullable pof_threshold. The corpus's site criteria are deterministic FoS only: Kibali open pits use a consequence-and-confidence DAC with an example lower DAC of FoS 1.2 (FACT, E214); Kibali CTSF3 requires FoS > 1.5 static and > 1.1 pseudo-static (FACT, E215). PoF criteria (e.g. Read & Stacey 2009) are FACT[U] here |
Pass/margin per sector on the site's own basis, rendered as evidence for the engineer's design acceptance; PoF is shown beside an FoS-only criterion as evidence, never as the criterion |
| Numerical analysis | Shear-strength reduction FEM, via fmine-simbridge only once frankensim has Mohr–Coulomb/Hoek–Brown (an upstream ask; fs-solid is J2-only today, E007) |
Until then, LEM plus lab-oracle comparison (Slide/SLOPE/W-class tools) on benchmark sections |
Limit-equilibrium solvers are built in fmine-geotech::lem. They take known-answer tests from published benchmark
problems (ACADS-style), and their pinned oracle outputs are never regenerated from the candidate.
14.3 Underground ground control
- Stope stability. Empirical stability graph (Mathews/Potvin) as a card with validity domain; hydraulic radius
vs modified stability number N′; dilution (ELOS) forecasts registered and scored against cavity monitoring
scans (CMS) of mined stopes. The scan-vs-design comparison is computed in
fmine-ops::asbuilt(§16.2). - Ground support. Demand (dead-weight wedge, depth-of-failure from empirical relations) vs capacity (bolt, mesh, shotcrete capacity cards) per excavation class; factor-of-safety distributions; installation QA records (bolt pull tests) as evidence.
- Mine seismicity. Microseismic event catalogues → Gutenberg–Richter b-value and activity-rate estimates per
volume and time; anytime-valid change detection on event rates (lifted
fs-eproc) after blasts and production changes; exposure-based re-entry rules are policy data. FrankenMining never declares an area "safe"; it states the evidence state and the rule outcome. - Caving (block/panel cave) — Phase 2. Cave propagation and fragmentation are research-grade (OPEN-HIGH-3); Laubscher-style empirical cards with explicit validity domains only.
14.4 Monitoring and TARPs (Trigger Action Response Plans)
- Instruments: survey prisms, slope stability radar, InSAR, GNSS, extensometers, inclinometers, time-domain reflectometry, piezometers, microseismic. Each is a packet-plane stream (§6.1) with a calibration and a staleness monitor.
- TARP automaton (DESIGN). Each monitored domain has a registered TARP (policy data authored by the geotechnical
team): levels (Normal/Level 1/Level 2/Level 3) with trigger predicates over instrument evidence (displacement,
velocity, acceleration, pore pressure, event rate) and required responses (inspect, restrict access, evacuate,
notify). FrankenMining evaluates triggers, raises
OB-TARPobligations (acknowledged and escalated per the TARP) and records responses; it never executes them (§31.3). - Trigger predicates may use antecedent rainfall over a registered window (e.g. 60 days, set by site calibration) and reservoir or pit-lake level, not only piezometers: rising groundwater is the dominant landslide trigger (E394, E395). A creep forecast that assumes deceleration is a registered hypothesis scored like any other; "creep will stabilise" is never a default (Vaiont; E395).
- Trigger evaluation is three-valued:
Triggered/NotTriggered/Indeterminate(instrument stale, coverage gap, conflicted sources).Indeterminateescalates likeTriggeredfor notification purposes (DESIGN; the safe default) while being labelled honestly. - Time-of-failure forecasts. Inverse-velocity methods (Fukuzono-type, 1/v → 0) are allowed only as registered, scored forecasts with explicit uncertainty, never as a deterministic "failure at 14:20". Their track record in the calibration ledger is shown with every forecast (§10).
- Coupled radar and piezometer precursor (DESIGN). Radar sees surface displacement, while effective stress
σ′ = σ − u falls at depth first.
fmine-geotechtherefore pairs radar inverse-velocity tracking with the rate of rise at vibrating-wire piezometers (VWP). A pore-pressure rise beyond its TARP step (or a drop in horizontal-drain flow) together with positive radar acceleration raises a registered hydro-mechanical precursor alert, scored like any other forecast.
14.5 Hydrogeology, pore pressure and FoS sensitivity
- Hydrogeological units are a Strata partition. Piezometer data and pumping records condition pore-pressure fields.
- Seepage and depressurization: a confined Darcy operator is available through frankensim's
fs-conductionoperator-twin (bridge-gated); unconfined/Richards flow and coupled consolidation are gaps (E010) — build a pragmatic 2D/quasi-3D groundwater model infmine-geotech::pore, or request upstream (FD-FSIM-03). - Pore-pressure sensitivity of FoS (DESIGN). Each limit-equilibrium solve also emits J_u = ∂FoS_s/∂u_k for
sector s and each piezometer or phreatic control node k. For Bishop's simplified method, with slice weight W_i,
base inclination α_i, width b_i, strength c′_i and φ′_i, pore pressure u_i = Σ_k w_ik u_k (w_ik the
interpolation weight from node k to slice base i), T_i = c′_i b_i + (W_i − u_i b_i) tan φ′_i and
m_α,i = cos α_i + sin α_i tan φ′_i / F:
∂F/∂u_k = −[Σ_i w_ik b_i tan φ′_i / m_α,i] / [Σ_i W_i sin α_i − Σ_i T_i sin α_i tan φ′_i / (F² m_α,i²)].
The second denominator term is the implicit dependence of m_α on F. Without it the sensitivity was 10–14% low on
a test section, while the full form matches finite differences. Spencer and Morgenstern–Price take the same
implicit-function step on their converged equilibrium system. Uses:
- piezometer deltas update a linearized ΔFoS_s = Σ_k J_u,k Δu_k between full solves, and a full re-solve runs when |ΔFoS_s| > 0.02;
- drain holes and replacement piezometers are ranked by |J_u,k| · σ_u,k, the input GB-39 needs.
- Pore-pressure realizations and J_u feed LEM (§14.2) and the TSF (§18).
14.6 Highwall gates and kills
| Gate | Threshold (TARGET) |
|---|---|
| GATE-HIGH-01 | LEM solvers reproduce benchmark FoS within ±0.01 on the published problem set; metamorphic test: on a single planar slip surface every method reproduces FoS = (c·A + (W cos α − U) tan φ)/(W sin α) (E393) |
| GATE-HIGH-02 | TARP automaton: 100% of synthetic trigger scenarios (including stale and conflicted instruments) produce the registered response obligations; Indeterminate never silently maps to NotTriggered |
| GATE-HIGH-03 | Kinematic P(release) forecasts registered for ≥ 1 year of bench mapping at a pilot site; reliability reported |
| Kill | Trigger | Fallback |
|---|---|---|
| KILL-HIGH-1 | Engineers reject probabilistic slope outputs | Deterministic FoS per section with sensitivity tables and flip margins; probabilities hidden behind an opt-in view |
| KILL-HIGH-2 | frankensim never gains Mohr–Coulomb/HB | LEM-only; numerical analysis stays in the engineer's existing tools, ingested as attested results |
Guards.
| Guard | Fires when | Action |
|---|---|---|
| G-HIGH-1 | A slope FoS or PoF is requested without pore-pressure provenance (piezometer evidence or an attested assumption) | Refuse; list the missing input |
| G-HIGH-2 | A PoF would be stated without an admissible reference class or a vetted model (§9.3) | State the UU flip margin; the probability is not stated |
| G-HIGH-3 | A card (Hoek–Brown, Mathews/Potvin, Laubscher, UCS(Is50)) is evaluated outside its validity domain | Refuse (out-of-box); show the domain |
| G-HIGH-4 | An inverse-velocity time-of-failure forecast is rendered without its calibration record | Refuse |
| G-HIGH-5 | A TARP trigger reads an instrument past its staleness bound | Evaluate as Indeterminate; escalate like Triggered (FMINE-REF-404) |
Proof obligations.
| PO | Statement | Method |
|---|---|---|
| PO-HIGH-1 | TARP evaluation is three-valued, and Indeterminate never maps to NotTriggered |
Exhaustive automaton test over synthetic trigger scenarios (shared with PO-FREE-1; GATE-HIGH-02) |
| PO-HIGH-2 | LEM solvers reproduce published benchmark FoS within ±0.01 | Known answers against pinned oracle outputs (GATE-HIGH-01) |
| PO-HIGH-3 | A stale instrument is not_observable, never "stable" |
Property test on virtual time (LabRuntime) |
| PO-HIGH-4 | geotechnical_signoff is false in every output |
Type-level (INV-002) plus a grep-style output test |
| PO-HIGH-5 | Kinematic and time-of-failure forecasts are registered before resolution | INV-008 late-registration refusal test |
| PO-HIGH-6 | PoF is computed from the realizations, never from a fitted FoS distribution alone | Differential test: realization PoF vs normal and lognormal fits on skewed fixtures |
GB-39 · A section that passes on FoS can fail on PoF once pore pressure is uncertain.
- Policy basis. Acceptance criteria are site policy data, not FrankenMining's. The only site criteria in the
corpus are deterministic FoS: Kibali's open-pit DAC is a function of consequence and confidence, with an
example lower DAC of FoS 1.2 (FACT, E214); Kibali CTSF3 uses > 1.5 static and > 1.1 pseudo-static (FACT,
E215). Neither Kibali nor Loulo states a PoF criterion. A PoF limit (Read & Stacey 2009 style) is FACT[U]. The
card therefore runs on the site's
dac_basis; where that is FoS-only, PoF is evidence beside it. - Equation. PoF = P(FoS < 1), estimated over realizations of strength, structure and pore pressure.
Illustrative policy with
dac_basis = FoS+PoF(values FACT[U]): overall slope, high consequence, mean FoS ≥ 1.3 and PoF ≤ 5%. - Substituted.
- Mean FoS = 1.35 passes the FoS criterion.
- Strength uncertainty only: sd = 0.12 → PoF ≈ Φ((1 − 1.35)/0.12) = 0.2%.
- Adding pore-pressure realizations conditioned on sparse piezometers: sd = 0.22 → PoF ≈ 5.6%, which fails.
- Two more piezometers in the section narrow sd to 0.18 → PoF ≈ 2.6%, which passes.
- Intuition. The deterministic FoS hides the input that dominates the tail. The piezometers have a quantifiable value of information, and the card shows it next to the engineer's design acceptance.
- Assumptions. A normal approximation is used only for the illustration. A lognormal FoS with the same mean and sd gives 3.8% at sd 0.22, so the distributional form itself is a flip; that is why PO-HIGH-6 requires PoF from realizations.
- Flip. Pore-pressure sd falls (drainage holes, more piezometers) or the consequence class is moderate (PoF limit 10%) → passes without new instruments. Under an FoS-only policy (Kibali-style DAC 1.2) the section passes outright, and the 5.6% PoF is the evidence the engineer weighs.
OPEN-HIGH-1 (site TARP formats and ownership), OPEN-HIGH-2 (slope radar vendor data access), OPEN-HIGH-3 (caving scope).