Lodestar: exploration and Bayesian prospectivity
4,604 words10 subsections9 tables4 listingsPlan version 0.1
On this page10
11.1 Decisions served, and the base rates that bound every output
-
Decisions served.
- Which ground to hold, acquire, earn into or drop.
- Which survey or drill program to fund next, and when to stop on a target.
- How much undiscovered endowment backs a district's option value. This is the interface to the CapitalProgram (§23).
-
Loss asymmetry. Both errors are false certainty, and both cost more than missed upside, the cheapest error:
- a falsely "cleared" area, from overconfident negative evidence;
- a falsely "hot" area, from overconfident analogue transfer.
So absolute probabilities MUST be refused or bounded wherever exploration effort or analogue transfer is unidentified.
-
Base rates (FACT, R6 §4.4–4.5, E026).
- About $218M of exploration spend per discovery (2011–20).
- About 0.69 of value created per exploration dollar.
- 2–3 Tier-1 discoveries per year globally.
- 15.7 years from discovery to production for 127 mines started 2002–23, and 17.9 years for mines started 2020–23 (FACT[U], S&P Global Market Intelligence, two different samples; E636).
-
Sanity rule (DESIGN). A model that implies a materially better hit rate than these base rates over a broad area is presumptively miscalibrated until its hindcast says otherwise.
11.2 Verdicts on method (Brenner pass B2)
| Candidate | Verdict | Role |
|---|---|---|
| (a) Pixel-wise ML prospectivity (RF/GBT/CNN on evidence rasters) | Refuted as the object of record. It has no probability semantics. It treats unlabelled cells as negatives (SCAR), collapsing all absence classes into one zero. Its scores proxy past effort. It degrades under leave-one-terrane-out (E028). | Survives as a cross-fitted covariate supplier and a proposal generator |
| (b) Hierarchical marked, thinned Cox process (LGCP/SPDE intensity; grade–tonnage marks; discovery thinning by effort × detectability; terrane partial pooling) | Survives as the regional object of record, conditional on the effort-data gate GATE-LODE-P4 | Core of fmine-prospect |
| (c) Mineral-systems causal model (source–pathway–trap–preservation) | Refuted standalone: it has no calibration and no discovery-bias model | Survives as the factorization of log-intensity (a noisy-AND prior) and as the transport argument for dissimilar terranes |
| (d1) Search-theoretic POMDP over competing geological hypotheses (Intelligent Prospector; Popper–Bayes) | Survives at prospect scale only (≲10² km², ≲10² holes); intractable regionally | Phase 2 (fmine-prospect::pomdp), fed by (b)'s local posterior as its prior |
| (d2) Hybrid: (a)+(c) feed (b), which feeds (d1), with typed search modes | Adopted architecture | — |
| N0 MapMark4-degenerate tract model (negative-binomial counts × grade–tonnage pdfs) | Checked null | Parity oracle and deterministic fallback |
11.3 Data model (fmine-explore)
pub struct DepositRecord { id: DepositId, geom: Geom, deposit_type: TypeProbs /* vector over catalogue + k* */,
marks: MarkRecord /* tonnage, compositional grade, depth, style; censored where sub-economic */,
discovery: Option<DiscoveryEvent{ year, method: ExploreMethod, company, doc: DocRef }>,
aggregation_rule: RuleId /* USGS consistency rule: one rule for labels, marks and outputs */, provenance: ProvenanceDag }
pub struct EffortRecord { id: EffortId, method: ExploreMethod, geom: Geom, valid: TimeInterval,
spec: MethodSpec /* line spacing, depth of investigation, detection limits, hole depth, sample medium */,
source: DocRef, coverage: CoverageConfidence /* High | Medium | Low | Unknown */ }
pub struct CovariateField { id: FieldId, ingredient: Ingredient /* Source|Energy|Pathway|Trap|Preservation|Cover */,
realizations: RealizationSetId /* stochastic interpolation/inversion; never a single deterministic raster */,
support: Support, evidence: EvidenceClass }
pub struct ElicitationRecord { tract: TractId, experts: Vec<PersonId>, protocol: Idea, n90_n50_n10: [u32; 3], seeds_scored: CalibRecordId }
pub struct TractMap { version: SemVer, tracts: Vec<Tract>, alternatives: HypothesisSetId /* map uncertainty is KU-structural */ }
Absence classes (DESIGN; extends R7 §1.7 with a fifth class).
| Class | Typed as | Enters the likelihood as | Knowledge state | Example |
|---|---|---|---|---|
| A0 Not looked | No EffortRecord intersects s |
Nothing | not_observable |
Unmapped tenement under 60 m of transported cover |
| A1 Looked, insensitive | Effort with q_j(m, cover) ≤ q_min for that style and depth | ≈ nothing (the hazard is computed and logged) | not_observable for that style and depth |
Soil geochemistry over transported cover; early multispectral imagery |
| A2 Looked, sensitive, nothing | Hazard H > 0 | −∫λπ penalty, scaled by q | estimated (absence of detection, with π) |
Close-spaced aircore through thin cover |
| A3 Found sub-economic | Occurrence with a censored mark | A positive point plus a mark upper bound | known occurrence |
A 0.3 g/t intercept over 20 m |
| A4 Effort suspected, unrecorded | coverage ∈ {Low, Unknown} or a report mention without geometry |
Manski bounds: π ∈ [0, π_era-typical] | unknown (an unknown known) |
A 1987 report cites "extensive RAB drilling" with no collars |
Data sources.
- Each source enters with its evidence class and its detection model q_j, drawn from the method-specification
catalogue:
- airborne magnetics and radiometrics; gravity; AEM (time-domain and frequency-domain); IP/resistivity; MT;
- multispectral and hyperspectral remote sensing; stream-sediment, soil, lag and biogeochemistry;
- geological and structural mapping; historical drilling; deposit catalogues; open-file company reports.
- Geophysical inversions (gravity, magnetics, IP/EM) enter as realizations of covariate fields from stochastic inversion, never as one deterministic model. Deterministic interpolation halves the apparent variance (FACT, Caers 2025, R7).
- Inversion engines are a build item:
fmine-prospect::inversion. It starts with linear Bayesian inversion for potential fields (gravity, magnetics) on liftedfs-sparseand defers EM/IP to Phase 2 (OPEN-LODE-3).
11.4 The generative model (DESIGN)
Types k ∈ K_named ∪ {k*} k* = "novel/unclassified type" slot (UU; Good–Turing, GB-09)
Terranes τ(s) from a versioned tract map (each version is a Claim; map uncertainty = KU-structural alternatives)
Intensity log λ_k(s) = α_{k,τ} + Σ_i log p_{k,i}(s) + w_k(s)
p_{k,i}(s) = logistic(γ_{k,i,τ}ᵀ z_i(s)) ingredient i's proxies z_i (mineral-systems noisy-AND)
z_i may include cross-fitted ML scores, stored as realizations, never as labels
w_k ~ SPDE-Matérn(range ρ_k, sd σ_k) on mesh M (2D continental; nested 2D/3D district)
Hierarchy θ_{k,τ} = (α, γ) ~ N(θ_k + GP_terrane(d(τ,τ′)), Σ_k) σ_τ hyperprior ≈ 1–1.5 (GB-07)
Marks log T ~ spliced{ lognormal body | GPD tail above u_k }; ilr(G) | T ~ N(·); depth z; style
observed tonnage = true × growth(era, age); truncated below the reporting threshold
Thinning π(s,m,t) = 1 − exp(−H(s,m,t)), H = Σ_j ∫_0^t e_j(s,τ) q_j(m, cover(s), τ) dτ
q_j hierarchical: q_j = q̄_j(era) · g_j(footprint(T), cover/DOI_j); discovery-method labels → competing hazards
Observation (1) deposit catalogue (presence-only, thinned, marked)
(2) drill intercepts with assays (presence/absence at known support, prospect scale)
(3) geochemistry/geophysics as covariate realizations z_i^{(r)}, r = 1..R
(4) elicited N90/N50/N10 per tract as a pseudo-likelihood on ∫λ (enables MapMark parity)
Likelihood ℓ = Σ_obs log[λ π f] − ∫∫ λ π f dm ds (+ intercept and elicitation terms) ← the integral is where absence lives
Inference Laplace / INLA-lite: Newton on the latent field per hyperparameter point (log-concave, PO-LODE-4),
lifted fs-sparse supernodal LDLᵀ with symbolic reuse; hyperparameters by CCD/grid; covariate
uncertainty by mixing over r; HMC/NUTS fallback at district scale (fmine-infer); SBC mandatory
Posterior IntensityPosterior{ basis: Public | Full }: draws of (θ, w at mesh nodes, q, mark parameters)
Why each modelling choice (rationale for future agents):
- Cover enters detection (q) and economics, never existence (λ). Preservation and erosion affect existence. Confusing the two is the classic way pixel models "learn" that covered ground is barren.
- Spliced lognormal–GPD marks. The top 10% of deposits hold 71–86% of the metal (FACT, Singer 1995, R7). That implies a lognormal σ of ≈1.8–2.4, and the tail is probably still understated by a lognormal. Valuing with medians flips decisions (GB-05).
- Growth model on reported tonnage. Resources grow after discovery (e.g., the Golden Mile from 36 to 72 Moz, FACT, R7). Catalogue tonnage at year t is not the endowment.
- Effort ignorability is an assumption, and it is tested. The thinned likelihood is valid only if effort depends on recorded information. If prospectors followed unrecorded signs (gossans, old workings), then unexplored ground was judged poorer. Test A2 (§11.8): does lagged effort predict post-T discoveries beyond the covariates? If yes, model effort jointly as preferential sampling, or widen to Manski bounds.
11.5 Decision outputs and their compiled artifacts
Every output is a Claim with:
- a representation;
- an evidence class;
- a calibration flag;
- a UU term;
- validity (price deck and economic-filter version);
- a basis (Public or Full);
- a confidentiality level.
(A) P(≥1 economic deposit in area A | E, t).
Λ_econ,undisc(A) = ∫_A ∫_{M_econ(deck)} λ(s) f(m|s) (1 − π(s,m,t)) dm ds
P(N ≥ 1) = 1 − E_post[ exp(−Λ_econ,undisc(A)) ] ← expectation OUTSIDE the exponential (GB-03)
M_econ(deck)is a versioned economic-mark filter: minimum contained metal and grade at depth z under a declared price/cost/recovery deck.- Output fields:
- P10/P50/P90 of the probability itself;
- an AOA flag;
- a Manski bound pair when the unknown-effort area exceeds 10% of A;
- the limiting ingredient argmin_i p_i (the explanation: "the trap proxy is the binding constraint here");
- the top uncertainty driver (range ρ, detection q, terrane effect θ_τ, mark tail).
- Refusal. If dissimilarity(τ) > d_max or GATE-LODE-P4 fails, the output is
Interval{Manski}orRefused(NoClaimInDomain). Never a point probability.
(B) Distribution of undiscovered contained metal.
- A compound Cox sum Σ T_n·G_n over undiscovered deposits, by Monte Carlo over posterior draws.
- Report P10/P50/P90, the mean, and P(at least one Tier-One-size deposit). State which Tier-One definition was used: an issuer's own definition and industry definitions differ, so they MUST NOT be mixed (R6 §1.3).
- The output is an
EnsembleClaim on the shared realization index, so the CapitalProgram joins it with price paths using common random numbers.
(C) EV and VOI of the next survey or drill program (preposterior).
EV(a | E) = E_post[ U(a, θ) ] U includes lead-time discounting (15.7–17.9 yr), P(develop | discovered), deal terms
VOI(o | E) = E_{y ~ p(y|E,o)} [ max_a E[U(a) | E, y] ] − max_a E[U(a) | E] (≥ 0)
net(o) = VOI(o) − cost(o) − delay_cost(o)
y-model = thinned-process predictions of survey/drill outcomes: detect / false-positive anomaly / sub-economic / dry
- Estimated by nested Monte Carlo with common random numbers and control variates, reporting the Monte Carlo standard error.
VoiStatus::Indeterminateapplies when the sign of net(o) is unresolved at 2·SE. In that case the ranking falls back to uncertainty-proportional ranking, labelled as heuristic.- Information-theoretic EOI (expected entropy reduction) is shown as a secondary, decision-agnostic column. It is never the ranking key.
fs_voi(frankensim) is used as a pattern and for Gaussian sub-problems only. Its closed form assumes Gaussian outcomes, which is unfit for heavy-tailed, discrete discovery outcomes (FACT,fs-voi/src/lib.rsheader).
(D) Bayesian search after negative drilling: two typed modes.
| Mode | When valid | Update | Effect elsewhere |
|---|---|---|---|
SearchMode::Cox |
Unknown number of deposits (regional, district) | λ_post(s,m) = λ(s,m)·(1 − d_prog(s,m)) for the undiscovered part; θ_τ updated through the likelihood integral | No renormalization upward. Elsewhere changes only through a slight shrink in the shared terrane effect, and through hypothesis reweighting where a hypothesis predicted this spot. |
SearchMode::SingleTarget{anomaly} |
One causative body is asserted to exist: a boulder-train source, a geochemical dispersion fan, an EM conductor. The assertion is itself a Claim with P(exists). | Koopman: p′_i = p_i(1 − d_i) / (1 − Σ p_j d_j) | Other cells renormalize upward by 1/(1 − pD) |
- Hole detection model.
- d_hole(s,m) = P(the hole trace intersects the footprint of a deposit at s with mark m) × P(recognized | intersected, logging and assay protocol).
- The footprint is the alteration and geochemical halo, not the ore.
- Detection is never 1.
- The AF447 failure. Overstating d clears ground too hard, which is the AF447 search failure (R7 §1.7). The posterior over d is displayed with the update (GB-02).
- Artifact.
SearchUpdate{mode, before, after, d_posterior, hypothesis_reweights, mass_moved_elsewhere}, an append-only claim pair with a galaxy-brain card.
(E) Drill-target and pad/wedge fan ranking under budget.
- Objective. F(S) = E_post[Σ_deposits V(m)·(1 − Π_{h∈S}(1 − d_h(deposit)))]. For each fixed deposit realization the coverage term is monotone submodular in the hole set S, and a non-negative mixture over the posterior preserves this.
- Cost. Holes share set-up costs: cost(S) = Σ_{p∈P(S)} C_pad,p + Σ_{w∈W(S)} C_parent,w + Σ_{h∈S} c_h ≤ B,
where P(S) is the set of drill pads or underground drill bays the holes use and W(S) the parent holes from which
wedge daughters are kicked off (Fourmile names daughters like
FM25-260DW1; FACT, E656). An underground platform can replace deep surface fans: Fourmile's timeline starts Bullion Hill decline development in 2026 and underground drilling from the Goldrush MPD in 2027 (FACT, E657), and each enters as a pad option. - Algorithm.
- With zero pad and parent costs, cost is modular. Lazy greedy (CELF) gives ≥ (1 − 1/e) under a cardinality constraint; cost-benefit greedy plus the best singleton gives ≥ (1 − 1/e)/2 under a knapsack budget.
- With set-up costs, cost(S) is submodular rather than modular, and no constant-factor guarantee is claimed.
fmine-prospectruns bundle greedy: each candidate pad or parent hole with its best fan (inner CELF) is one bundle, ranked by marginal coverage per incremental cost, and the best single bundle is kept as a fallback. - The certificate carries a data-dependent upper bound instead of a ratio. By monotone submodularity, OPT ≤ F(Ŝ) + max_{T: cost(T) ≤ B} Σ_{h∈T} δ_h(Ŝ), where δ_h(Ŝ) is the marginal gain of hole h given the chosen set Ŝ; the LP relaxation of that fixed-charge knapsack bounds the max from above (Leskovec et al. 2007). The gap between F(Ŝ) and the bound is reported (PO-LODE-15).
- All guarantees apply to the monotone coverage term under the budget. F(S) − cost(S) is not monotone, so cost enters only as the constraint, never as a subtracted term inside the guaranteed objective.
- The result is a
PortfolioCertificate: the pad/parent/wedge activation tree, the marginal-gain trace, the upper bound and a submodularity spot-check.
- Not claimed. The VOI objective is generally not submodular. Adaptive sequential choice at prospect scale (for example, kicking off a wedge only if the parent hole's intercept justifies it) goes to the phase-2 POMDP, or to myopic VOI with one-step lookahead over parent → daughter branches.
- Deals. The ranking accepts options whose cost and value are shaped by deal terms (earn-in, stake, option).
The deal economics live in §23 (
ProgramOption{deal}).
11.6 Discriminating experiment and hindcast protocol (cheap, one district, one quarter of effort)
- District. A mature public district with dated deposits and open-file effort: Yilgarn (Guj et al. 2011 precedent), Abitibi or Nevada. Data licensing is OPEN-LODE-1.
- Freeze. Evidence and labels as known at T, via a bitemporal as-of query. Score discoveries in (T, T+20 yr].
- Models compared:
- (a) RF with pseudo-absences;
- (a′) bagging-PU;
- (b) full thinned process;
- (b0) (b) without thinning;
- the mineral-systems-structured (b);
- N0.
- Scores:
- point-process log score of held-out discoveries;
- PR-AUC on cells;
- capture efficiency at the top 1%, 5% and 10% of area;
- expected vs observed discoveries per intensity decile;
- 80% coverage of tract counts;
- the count of positives. Fewer than about 15 in-tract post-T discoveries means the test cannot discriminate, and the report says so.
- Splits. Blocked cross-validation with block size from the variogram range; leave-one-terrane-out; temporal.
| Prediction if (b)/(d2) is right | If instead | Then |
|---|---|---|
| The (b) − (b0) log-score gain concentrates in low-effort and deep-cover strata | The gain is uniform or zero | Thinning does no work. Check effort coverage before concluding anything about the model. |
| (a) ≥ (b) in high-effort shallow cells; (b) > (a) in low-effort and leave-one-terrane-out cells | (a) wins everywhere, including leave-one-terrane-out | KILL-LODE-1: (b) is demoted to the counting layer |
| The mineral-systems structure gains more under leave-one-terrane-out than in-terrane | No difference | The factorization is ornamental; keep flat covariates |
| (b) decile calibration within the 80% band; N0 beaten on tract counts | (b) not better than N0 | Fall back to N0 plus effort-adjusted tracts |
11.7 Confidentiality: the dual-basis posterior (MNPI)
- When MNPI inputs exist (unreleased drill results are material non-public information, E023), every posterior is
computed twice:
basis = Public, from public evidence only;basis = Full.
- Only the Public posterior may leave an information wall. The difference between the two bases is itself MNPI, because it encodes the drill results.
- A Claim whose provenance contains an MNPI leaf stays MNPI until that leaf's public-release valid time.
- Transfer-price inputs are walled too. Barrick "anticipates Fourmile will be incorporated into the Nevada Gold Mines joint venture, at fair market value, if certain criteria are met" (FACT, E139). Any Fourmile valuation is therefore a potential JV transfer-price input: walled lane, insider-listed, never in NGM-partner- visible outputs (§31.2). Fourmile's PEA uses a $1,900/oz stope optimiser against the $1,500 reserve deck (E141), so its inventories are re-priced before any haircut (§23.5). Its one-year resource growth (Indicated 1.4 → 2.6 Moz, Inferred 6.4 → 13 Moz at 35 m and 80–90 m target spacing; E140, E142) is a conversion-prior datum. The deck labels two processing end-members (FACT, E656): the Wenban 5/8 contact as "Double Refractory Roaster feed" (FM24-200D, 1.3 m @ 16.25 g/t) and the silicified, structurally controlled zone as "Single Refractory Roaster or Autoclave feed" (FM24-209D, 1.6 m @ 30.6 g/t inside 16.3 m @ 47.07 g/t). Valuation and drill VOI (§11.5(E)) keep them apart, because single-refractory ounces carry a higher shadow value whenever roaster capacity binds (§15.6). Since 9 Aug 2026 Fourmile is to be vended into NGM (FACT, E658), so its value is now an NGM transfer price as well as a Barrick asset.
- A capability gate forbids junior-equity decisions (§23) from consuming
basis = Fullclaims about that junior's ground (OPEN-LODE-6 with counsel). - Model weights trained on MNPI are MNPI (membership leakage).
11.8 Assumptions ledger (each with its test)
| ID | Assumption | Test / monitor | If false |
|---|---|---|---|
| A1 | Independent thinning given λ (no deposit-to-deposit detection interaction) | District shutdown effects in hindcast | Add a district-maturity covariate to q |
| A2 | Effort ignorability: effort depends on recorded information only | Does lagged effort in λ predict post-T discoveries? | Preferential-sampling joint model, or Manski widening |
| A3 | Poisson/Cox with clustering in w; inhibition via the aggregation rule | Pair-correlation residuals | Add an inhibition term |
| A4 | Marks independent of location given covariates | Mark–covariate residual test | Mark regression |
| A5 | One aggregation rule applied identically to labels, marks and outputs | Versioned rule hash on all three | Block the fit |
| A6 | Covariate realizations represent interpolation uncertainty | Variance-ratio check against deterministic interpolation | Flag Estimated; widen |
| A7 | Reported tonnage = true × growth(era) | Inventory time series | Wider growth prior |
11.9 Galaxy-brain cards (illustrative values)
GB-01 · The discovery-thinning integral.
-
Equation.
- Λ_undisc = Σ_cells Λ·e^{−H}, where H = Σ_j e_j q_j.
- Log-likelihood penalty = −Σ Λ(1 − e^{−H}).
-
Substituted. One 400 km² cell with a prior of 0.5 deposits per 1,000 km², so Λ = 0.1 per half.
- Shallow half: soil q = 0.9 plus magnetics 0.1 gives H = 1.0, so π = 0.632 and Λ_undisc = 0.037.
- Deep half (40–80 m of transported cover): soil is insensitive (A1, q = 0). Magnetics 0.1 plus aircore 0.15 gives H = 0.25, so π = 0.221 and Λ_undisc = 0.078.
-
Result.
Treatment P(≥1 undiscovered) Thinning model 1 − e^{−0.115} = 0.108 Ignore effort 0.181 "Explored = barren" (pseudo-absence) ≈ 0 68% of what remains lies under cover.
-
Intuition. You only learn from looking where looking could have worked.
-
Assumptions. A1, A2, and q at that cover depth.
-
Flip. If deep-cover aircore q is really 0.40, the ranking barely moves. If effort records are incomplete, report the Manski bounds [0.108, 0.181].
GB-02 · Bayesian search after three dry holes.
- Equation.
- Cox mode: Λ′ = Λ·Π(1 − d_h).
- Single-target mode: p′ = p(1 − D)/(1 − pD).
- Substituted. Prior P(≥1) = 0.20, so Λ = 0.223. d_h = 0.35 per hole, so the miss probability is 0.65³ = 0.275.
- Cox mode: Λ′ = 0.0613, so P′ = 0.059. Elsewhere is unchanged.
- Single-target mode (D = 0.725): p′ = 0.064, and every other cell scales by 1/(1 − 0.145) = ×1.17.
- AF447 check. If the true d_h is 0.15 (holes too shallow beneath cover), the true P′ is 0.128. The target was cleared 2.2× too hard. A hierarchical d that is 50/50 on {0.35, 0.15} gives P′ = 0.094.
- Intuition. Dry holes clear ground only as well as the holes could see. They push probability elsewhere only if you assert that the body exists.
- Flip. The d posterior (d < 0.2 → keep the target), or an A3 sub-economic intercept (positive evidence).
GB-04 · EVOI of an IP survey before a six-hole program.
- Equation. VOI = Σ_y P(y)·max(EV_drill | y, 0) − max(EV_drill, 0).
- Substituted.
- Inputs: P(present) = 0.10; program detection 0.70; V_net = $125M (lead-time-discounted, net of definition cost); drilling $3M; survey $0.4M with sensitivity 0.85 and false-positive rate 0.30.
- Drill now: EV = 0.07·125 − 3 = $5.75M.
- P(anomaly) = 0.355. P(present | anomaly) = 0.239, so EV = $17.95M. P(present | no anomaly) = 0.023, so walk away.
- Survey policy gives $6.37M, so VOI is $0.62M gross, +$0.22M net. Survey first.
- Flip. VOI_gross = 1.4325 − 2.7·FP. Above a false-positive rate of ≈ 0.38, skip the survey and drill. Graphite and clays are chargeable, so a black-shale host flips the decision.
- Assumption. Survey and drill errors are independent given the deposit.
GB-05 · Heavy-tailed marks: never value with the median.
- Equation. V ~ LN(μ, σ) with σ = √(2 ln(mean/median)). Top-decile value share = 1 − Φ(z₀.₉ − σ).
- Substituted. Median $40M, mean $150M, so σ = 1.63.
- Valued at the median, GB-04's drill EV is 0.07·(40 − 25) − 3 = −$1.95M (drop).
- Valued at the mean, it is +$5.75M (drill).
- 79% of discoveries are worth less than the mean, and the top decile holds 64% of the value.
- Flip. Only portfolio-level risk limits (CVaR), not medians, may overrule expected value.
GB-07 · Analogue transfer and partial pooling (calibrated on Ellefsen 2026: pooled and local assessments differ in 14 of 16 cases, FACT, R7).
- Equation.
- Expected range of 16 normal draws ≈ 3.53σ, so σ_τ ≈ (ln 5.53 + ln 26.6)/3.53.
- Pooling weight on local data = σ_τ²/(σ_τ² + 1/n).
- Substituted. σ_τ ≈ 1.41, so an unexplored terrane's intensity is uncertain by a factor of about 16 either way at 95%. The weight on local data is 0.67 at n = 1 deposit and 0.91 at n = 5.
- Intuition. The honest analogue prior is wide, and a few well-explored local deposits dominate it fast.
- Assumption (HYPOTHESIS). The ratio statistics proxy tract log-intensity differences.
- Flip. A direct hierarchical fit on 30 or more tracts replaces this card.
GB-09 · Novel deposit-type mass via Good–Turing.
- Equation. P(next discovery is of an unseen type) ≈ n₁/N.
- Substituted. N = 120 regional discoveries in the versioned type catalogue, with n₁ = 3 types seen exactly once, so ε_type = 0.025 of the discovery rate goes to the k* slot. Precedent: IOCG was a new deposit type when Olympic Dam was found in 1975.
- Intuition. The catalogue's own singletons price its incompleteness.
- Flip. A catalogue revision that reclassifies the singletons.
11.10 Proof obligations, gates and kill gates
| ID | Statement | Verification | If violated |
|---|---|---|---|
| PO-LODE-1 | For fixed hyperparameters, adding effort with no discoveries never increases λ_undisc(s) | Metamorphic property tests | Block release |
| PO-LODE-2 | E[N_obs(A)] + E[N_undisc(A)] = E[N(A)] within 1e-6 relative | Exact identity test | Block |
| PO-LODE-3 | Polygon-integrated counts invariant under mesh refinement within 2% | Refinement ladder | Coarse-mesh claim plus an explicit discretization term |
| PO-LODE-4 | For fixed (θ, q) the latent posterior is strictly log-concave, so the Newton mode is unique. Certificate: ‖∇‖∞ < tol and all LDLᵀ pivots > 0. | LaplaceCertificate |
HMC (district) or N0 |
| PO-LODE-5 | The degenerate configuration matches MapMark4 endowment quantiles within Monte Carlo error (KS < 0.02 at 10⁵ draws) | Lab oracle (test time only) | Block the parity claim |
| PO-LODE-6 | A single-target update equals p(1−d)/(1−pd), and total mass is conserved | Unit test | Block |
| PO-LODE-7 | Simulation-based calibration rank histograms are uniform (χ² p > 0.01). Undiscovered-count and metal coverage within ±3 points of nominal over ≥200 replicates. | Synthetic district (§33.3) | Demote to Uncalibrated |
| PO-LODE-13 | The greedy portfolio achieves its stated ratio; submodularity is spot-checked on samples | Marginal-gain trace | Report "heuristic, no bound" |
| PO-LODE-14 | VOI sign is reported only when resolved at 2·SE | Monte Carlo CI | Indeterminate plus the heuristic baseline |
| PO-LODE-15 | Under pad, parent-hole and wedge costs the certificate's upper bound is ≥ the brute-force optimum and F(Ŝ) ≤ that optimum; with zero pad and parent costs the result meets the knapsack (1 − 1/e)/2 guarantee | Brute force on synthetic pad trees (≤ 20 holes) | Block the PortfolioCertificate |
| Gate | Threshold (TARGET) |
|---|---|
| GATE-LODE-P1 | Synthetic coverage within ±3 points (≥200 replicates); SBC p > 0.01 |
| GATE-LODE-P2 | MapMark4 parity (KS < 0.02) |
| GATE-LODE-P3 | In ≥1 public district, (b) beats N0 and (a) on held-out point-process log score (paired race e ≥ 20, or a 95% bootstrap CI excluding 0); the gain concentrates in low-effort strata; decile calibration within the 80% band |
| GATE-LODE-P4 | ≥60% of area-weighted effort digitized at coverage ≥ Medium before any absolute probability leaves the lab |
| GATE-LODE-P5 | Metamorphic suite 100% |
| GATE-LODE-P6 | A 10⁶-node 2D Laplace fit takes < 1 h on one workstation; a polygon query < 1 s |
| Kill | Trigger | Deterministic fallback |
|---|---|---|
| KILL-LODE-1 | (b) fails GATE-LODE-P3 in two districts | N0 plus (a) ranking labelled Uncalibrated; thinning only as a tract-level effort adjustment |
| KILL-LODE-2 | GATE-LODE-P4 unreachable for any target district within 6 months | Ship Manski bounds plus an unknown-knowns digitization VOI list as the exploration product |
| KILL-LODE-3 | PO-LODE-4 or GATE-LODE-P6 fails | Vecchia approximation or a coarse mesh; tract mode |
| KILL-LODE-4 | The prospect-scale POMDP saves < 20% of holes against myopic VOI at equal accuracy | Myopic VOI |
Open questions.
- OPEN-LODE-1 (the decisive risk). Effort-data availability and licensing (WAMEX/MINEDEX, OGS, NBMG, company archives).
- OPEN-LODE-2. The magnitude of effort endogeneity in real districts.
- OPEN-LODE-3. Three-dimensional under-cover point-process scale, and EM/IP stochastic inversion.
- OPEN-LODE-4. Pure-Rust nested-dissection ordering plus selected inversion for marginal variances. The lifted fs-sparse has AMD plus LDLᵀ only.
- OPEN-LODE-5. The value function V(m) for undiscovered deposits; it is the interface to §23.
- OPEN-LODE-6. MNPI and JV data-room policy with counsel.