20.1 The material-flow graph (mine to market)20.2 Conservation laws (INV-005)20.3 Reconciliation as joint state estimation20.4 F-factors as posterior quantities20.5 Bias priors back upstream (the learning loop)20.6 Identifiability, attribution and the value of measurement20.7 Forecast registration and disclosure-grade reconciliation20.8 Stockpiles, heaps and inventory as latent states20.9 The reconciliation certificate20.10 Synthetic truth, known answers and gates20.11 Guards and proof obligations20.12 Galaxy-brain cards (illustrative values)

Reconciliation is the one place where every model in a mine meets reality. FrankenMining treats it as a joint state estimate with uncertainty over the material-flow graph, not as a ratio of two estimates. It is the wedge's engine (B5 H-f; §37 M1–M2).

Crates:

  • fmine-flow: the material-flow graph and conservation laws.
  • fmine-recon: the estimation engine. It uses fmine-infer (NUTS, Kalman smoothing) and lifted sparse linear algebra.

20.1 The material-flow graph (mine to market)

Node class Examples Quantities Typical measurements (error model from §12.5)
In-situ volumes Resource-model and GC-model projections over the as-mined solid (§13.7, §16.2) Tonnes, metal per element (model claims at their supports) Survey volumes, density field
Blasted and dug Blast polygons shifted for movement (§16.3), dig blocks Tonnes, metal Truck counts × payload, bucket counts
Transport Truck loads by destination Tonnes (wet), assigned polygon probabilities Payload weighing, FMS cycles
ROM pads, stockpiles, heaps Grade-binned stockpiles, long-term low-grade, leach pads Tonnes, metal, latent inventory Periodic surveys, reclaim records, leach curves
Plant Crusher feed, mill feed, intermediate streams, concentrate, tails, doré, cathode Dry tonnes, metal, water Weightometers, samplers, slurry analysers, stocktakes
Products and market Shipments, refinery outturn, smelter settlement Payable metal Draft surveys, assay exchange, outturn statements
Cross-complex and third-party sources Ore from another complex, purchased concentrates, toll feed Tonnes, metal, owner Back-allocation only; Carlin plants take Cortez ore and third-party concentrates, and "it is not possible to break out individual sources beyond what is back allocated" (FACT, E157), so source attribution is a §20.6 identifiability question
Waste and tailings Dumps by class (PAG, NAF), TSF Tonnes, S, metal losses Surveys, tailings samplers
  • Edges are typed transfers with valid time.
  • Time alignment is explicit:
    • stockpiles, pads and plant inventories decouple mining time from processing time;
    • the graph is a state-space model over periods, not one static balance;
    • a period's reconciliation is never computed as "mined this month ÷ milled this month" across a stockpile (guard G-TOUCH-3).

20.2 Conservation laws (INV-005)

  • The law. For every node, period and extensive quantity q (dry tonnes, water, metal per element): Σ in − Σ out − Δ inventory = 0, within the registered measurement tolerance.
  • Reconcile extensive quantities only. Tonnes and metal are reconciled as extensive variables, which keeps the constraints linear. Grades are derived (metal ÷ tonnes) after reconciliation and never reconciled directly. This mirrors Strata's remap rule (§13.4).
  • Commit refusal. A period whose reconciled residuals fail the gross-error test is not committed (FMINE-REF-101). It becomes an InvestigationCase with the suspect measurements ranked.
  • No plugs. A survey true-up, stocktake or outturn adjustment is a measurement with an error model and evidence, never an unexplained balancing figure. "Unaccounted metal" is a posterior quantity with an interval, attributed where identifiable (§20.6) and explicitly unattributed where not.
  • Published balancing rows are latent terms. NGM's "GC adjustment" line sits between theoretical feed (mined − feeder-pad change) and GC call: −49, +20 and +25 koz across three plants (INFERENCE, C2 §4.2b). Kibali's "GC Adjustment" row carries −10,466 t at −31.15 g/t (FACT, E207); Loulo's stockpile-change row carries a negative grade (E208). Touchstone models each as an explicit latent term (feeder-pad survey and grade error).
  • Import rule. Importers store printed reconciliation cells verbatim, recompute every ratio and t·g → oz identity, and file mismatches beyond rounding as DiscrepancyRecords citing both pages. A residual row is imported as (Δt, Δoz) with grade = NOT_DEFINED. Fixtures: Kibali's 2024 MCF row recomputes to 107.1/94.6/101.2% against a printed 100/96/95% (E206); Kibali Tables 6-2 and 15-27 disagree for the same years (E241); Loulo's RCF plant ounces print 683,184 against 753,220 elsewhere (E209).

20.3 Reconciliation as joint state estimation

Level Method Purpose Status
R0 Parity Reproduce the site's own monthly reconciliation pack (F1/F2/F3, tonnes/grade/metal) from the same inputs and conventions Trust: "we get your numbers first, and every difference is explained" (B5 M2 acceptance 1) DESIGN; mandatory
R1 Linear data reconciliation Weighted least squares on the linear constraints: x̂ = x − ΣAᵀ(AΣAᵀ)⁻¹Ax, with posterior covariance Σ − ΣAᵀ(AΣAᵀ)⁻¹AΣ; global χ² and per-measurement tests (FACT[U], R7 §7.6) Closes balances with honest uncertainty; finds gross errors DESIGN; P0
R2 Hierarchical Bayesian state-space Latent inventories over periods (Kalman smoother in the linear-Gaussian case); bias terms per measurement node and per domain-period with hierarchical priors; Student-t likelihoods for gross-error robustness; stockpile mixing model (well-mixed vs layered vs FIFO) as a model choice with evidence F-factors as bias posteriors; learning across periods; attribution DESIGN; P1, NUTS via fmine-infer
R3 Model-integrated Strata realizations at T_resource and T_gc projected over the as-mined volume give prior predictive distributions for in-situ nodes; Crucible cards give plant node priors The posterior is consistent with the belief ledger, so its residuals become Strata's bias priors DESIGN; P2

Why R2 rather than ratio factors:

  1. F1 and F2 errors can cancel and hide problems ("mutual compensation"; FACT, R7 §4.3).
  2. The mill head grade is itself an estimate back-calculated through metallurgical accounting, not truth (FACT, R7 §4.3).
  3. Stockpiles decouple mining from milling in time.
  4. Factors applied as fudge multipliers creep (FACT, R7 §4.3).

A state-space posterior handles all four by construction, and it says when the data cannot separate two explanations.

20.4 F-factors as posterior quantities

  • Definitions are registry data, because variants differ by company (FACT, R7 §4.3; R6 §6.1):

    • F1 = GC model ÷ depleted resource (or reserve) model over the mined volume;
    • F2 = mill received ÷ mine delivered (GC model);
    • F3 = F1 × F2;
    • F0 (reserve ÷ resource), F2′ (post-blast, accounting for swell; FACT, R6 §6.1, AusIMM 2022) and the South African mine call factor (MCF) are also defined.

    Each definition is versioned and named in every output.

  • Site-specific definitions registry (FACT; C2 §4.2, C3 §3.1). At Barrick's own sites the same names mean different numerators and denominators:

    Registry key Numerator Denominator Support Source
    F1.barrick_kibali.conversion Short-range (GC) model Long-range model Areas converted Ind→Meas, year on year (not the mined volume) E203
    MCF_out.barrick_africa Mill check-out (bullion + inventory change) GC call Plant year or month E204
    MCF_in.barrick_africa Mill check-in (grade reconstituted from CIL and gravity sampling) GC call Plant year E210
    MCF_t.barrick_loulo / MCF_g.barrick_loulo Tails tonnes / check-out grade GC call tonnes / grade Plant year E205
    RCF.barrick_loulo Plant check-out Resource model over the 3D mined volume Plant year E209
    MCF_out.ngm Mill check-out GC call (tonnes, grade, metal) Plant year E154–E156

    NGM's MCF out sits closer to F2 than to F1, and no NGM F1 is public (DATA-GATE). Kibali's "F1" is a model-to-model conversion factor, not the plan's F1, so G-TOUCH-4 renders the registry key, never the bare label.

  • Each factor is reported as a posterior for tonnes, grade and metal, with an interval, per domain and period, together with the bias decomposition behind it.

  • Compensation detector. When F3 ≈ 1 while F1 and F2 each deviate in opposite directions beyond their intervals, the period is flagged "compensating errors" and opened as an InvestigationCase. The good-looking F3 is not reported alone. Reconciling against production "must be used strictly together with" reconciling against grade control (E385).

    • The detector also runs inside one factor, tonnes against grade: the Goldstrike Roaster's tonnes 109% and grade 94% net to metal 102% (FACT, E154).
    • Public case and known answer KA-TOUCH-KIBALI-2016-2025 (100% basis; Barrick 45%): Kibali's open-pit GC call held fewer ounces than the raw GC model in every year (−2% to −13%), with more tonnes and lower grade from 2022, while the 2025 mill MCF (out) read 100/101/101, with +2.6% check-out over check-in (FACT, E210–E212). It supplies ten years to fit a signed bias prior.
  • Tolerance bands. No published industry benchmark for typical F1/F2/F3 tolerance bands exists; the ±5–10% figure is practitioner lore (INFERENCE: a checked null in R6 §6.1). FrankenMining therefore reports intervals, not band compliance. Bands, where a company has them, are policy data.

20.5 Bias priors back upstream (the learning loop)

Posterior residual Updated object Mechanism
In-situ metal bias by domain and period (resource vs GC vs mill) Strata L2 bias_prior per domain (§13.3) Hierarchical update; the next estimate carries the learned bias with its uncertainty
Density bias Strata density field and regression card Card refit through an InvestigationCase
Payload and truck-factor bias Headframe per-truck payload model (§16.4) Hierarchical per-truck and fleet bias
Sampler and weightometer bias Crucible measurement node models (§17.5) Bias term with an eproc drift monitor
Stockpile survey and bulking bias Headframe survey-epoch model (§16.2) Bulking factor posterior
Dilution and ore loss beyond plan Pushback dig-line and blast-movement models (§15.7, §16.3) Card refit; registered before/after test
Recovery card residuals Crucible cards (§17.3) Refit through an InvestigationCase
Source-specific bias (open pit, underground, stockpile) Bias priors keyed by mining source Porgera 2007–2011 shows opposite signs: underground declared ore +36% oz against reserve, open pit −8% (FACT, E298)
  • Dilution attribution. Residual dilution and ore loss are attributed to internal, planned, accidental and geologic sources (E399; §15.5).

  • Safeguards. Every update is a logged event with the evidence cut. A surprise monitor alarm (§10.4) routes the update through an InvestigationCase; there is no silent retraining (anti-goal, §4.3).

  • The difference from factor multipliers:

    • a factor multiplier says "multiply next month's GC estimate by 0.93";
    • a bias posterior says "the GC model in domain 12 has over-estimated metal by 7% ± 2% over 9 periods, the bias does not depend on bench, and here is the evidence".

    The latter can be audited, tested and retired.

20.6 Identifiability, attribution and the value of measurement

  • Identifiability analysis. Before any attribution, the engine computes posterior correlations among bias terms. It also checks the rank of the observation operator restricted to the bias parameters.
  • Refusal FMINE-REF-104. When two biases are not separately identifiable (posterior |correlation| > 0.8 and the split is prior-dominated), the engine refuses to attribute. It reports what is determined (their difference or sum) and what measurement would separate them (GB-25).
  • Measurement VOI. For each non-identifiable pair, the engine estimates the posterior-variance reduction and decision value of candidate measurements, using the Helm VOI machinery (§22):
    • a sampler audit;
    • a cross-belt analyser campaign;
    • a stockpile resurvey;
    • check-assay round-robins;
    • density programmes;
    • a reconciliation-grade sample of grade-control holes.
  • Detection power is stated. For each measurement node, the bias size detectable over one quarter at the declared power and false-alarm rate is computed and published (B5 M1 acceptance).

20.7 Forecast registration and disclosure-grade reconciliation

  • Registered forecasts. Before each period, the resource-model, GC-model and plant forecasts of tonnes, grade and metal for the planned volumes are registered (§10). After the period, they are scored against the reconciliation posterior, not against a single measured number.
  • Reporting codes. The JORC exposure draft proposes a mandatory reconciliation section (final wording and commencement unverified; JORC 2012 remains in force; E031). Touchstone produces the reconciliation evidence package and a draft reconciliation section for the CP's review (§24). The CP writes and signs the disclosure.

20.8 Stockpiles, heaps and inventory as latent states

  • Stockpile states. Tonnes and metal per element are posteriors updated by inflows (with their GC grade uncertainty), reclaims and surveys. Surveys reset the tonnage uncertainty but not the grade uncertainty.

    • Parcel provenance (StockpileVoxelTwin; DESIGN). Where FMS dump events and loader GPS exist, fmine-flow::stockpile keeps a voxel model (2.5–5 m, on the lifted VdbGrid). Each dump places a parcel with its source polygon and angle-of-repose spreading; each reclaim cut removes voxels and passes their parcel mix and age to the crusher feed; each voxel integrates its oxidation exposure θ_ox(v, t) = ∫ r_ox(T, O₂, S²⁻) dτ since dumping, which indexes Crucible's degraded-recovery card and Freeboard's ARD source term (§18.5).
    • Plant cone and surge inventory. The cone between crushers and mills is a latent inventory, not a constant. Pueblo Viejo's 2025 MCF reconciliation opens with 281.7 kt at 2.41 g/t and closes with 352.1 kt at 2.44 g/t (FACT, E666), a 70 kt swing that the monthly balance must carry.
    • Mixing model. Without dump and reclaim positions, stockpile grade at reclaim depends on a declared mixing model (well-mixed, layered/FIFO, or campaign-separated). The reconciliation compares the candidates' predictive performance, and the voxel model is one more candidate where its data exist.
  • Stockpile tracking practice (FACT, E194). Cortez records each truck's majority block ID, grade and constituents, corrects tonnage to survey, scores each pile annually, and sonic-drills piles on a 15–18 m grid. These are the observations the stockpile state consumes; sonic-drill intercepts also condition voxel grade and oxidation state.

  • Stockpile metallurgical state (DESIGN; C4 P3). Per pile, lift or voxel, carry Stot, S²⁻, Ctot/Corg and exposure age as posteriors, with a declared degradation model. Crucible's recovery card is indexed by that state, and the same oxidation latent feeds ARD (§18.5). Pueblo Viejo: stockpiles hold 6.0 of 20 Moz of reserves and supplied 70.6% of 2025 crusher feed; recovery falls to 74% for one ore type above 8.5% Stot; the stockpiles are Probable only because sulphur degradation affects recovery (FACT, E252–E255, E258). The §24.4 support pack shows the degradation uncertainty; the class remains the QP's call.

  • Heap leach and gold-in-circuit inventories are latent states with leach-curve dynamics (§17.3, GB-20). A multi-lift pad (Veladero, Cortez, Carlin, Zaldívar) is discretized by lift ℓ and irrigation panel c (DESIGN): ṁ_PLS(t) = Σ_{ℓ,c} M_ℓc · R∞(domain_ℓc, P80_ℓc) · h_ℓc(t − t_irrig,ℓc; Z_ℓ, q_ℓc(t), κ), with Z_ℓ the drainage depth through the lifts below, q_ℓc the application flux (L/h/m²) and κ a channelling parameter. PLS flow and grade update the posterior over (κ, R∞) and the recoverable inventory per cell. The site book is usually a recoverable-basis roll-forward (E275), stored as MetalStage::Recoverable (§25.2), and Touchstone reconciles the cell posterior against it every month.

  • Accounting hand-off (§21.5). Inventory posteriors feed FA through Bullion:

    • quantity and cost layers;
    • NRV tests at a price basis set per inventory class by policy (expected selling price for doré, concentrate and metal in circuit; long-term price only where the book's policy allows it for long-term stockpiles); a degrading long-term stockpile is valued at the recovery expected at its scheduled reclaim date, not today's;
    • current vs non-current classification of long-term stockpiles.

    A true-up is posted as an Adjusting entry with the survey or reconciliation Workpaper as evidence (FACT, R4 §7: FA records, FrankenMining computes).

20.9 The reconciliation certificate

Every committed period produces a ReconciliationCertificate. It extends the ReconciliationWitness of §13.11:

Field Content
Inputs Evidence cut; measurement set with error-model versions; F-factor definition versions
Parity R0 differences from the site's pack, each explained or refused
Balance Pre- and post-reconciliation residuals per node; χ² statistics; gross errors detected and their disposition
Posteriors Node quantities, F-factors, bias terms (mean, interval), latent inventories
Identifiability Pairs refused attribution, with the separating measurement and its VOI
Forecast scores Registered forecasts for the period and their scores
Attestation The site reconciler or metallurgical accountant signs (Reviewed{against}); FrankenMining never signs
Determinism Replay digest (same inputs and seed ⇒ same certificate digest)

20.10 Synthetic truth, known answers and gates

The synthetic-truth generator (fmine-gen, §33.3) builds open-pit Au and Cu–Au mines with seeded biases in:

  • the resource model;
  • dilution and ore loss;
  • stockpile survey and bulking;
  • mill sampler;
  • density;
  • truck payload.

The generator produces every measurement the real graph has, with known error models.

Gate / kill Threshold (TARGET) When Fallback
GATE-TOUCH-01 (R1 known answers) Linear reconciliation unbiased with the stated covariance on synthetic flowsheets; gross errors of stated size detected at stated power M1 — (must pass)
✖ GATE-TOUCH-02 (bias recovery) Over ≥ 200 replicates, 90% intervals on each injected bias cover truth 85–95% of the time; the metal balance closes within stated uncertainty; non-identifiable pairs return FMINE-REF-104, not a number; detection power for a 5% sampler bias over one quarter stated M1 (B5) Kill if coverage is outside 80–97% after one fix cycle, or identifiability is not characterised. Fallback: no site proposal on reconciliation; lead with the metric engine (§21.6) and capital (§23)
GATE-TOUCH-03 (parity) Site pilot: the site's F1/F2/F3 reproduced from the same inputs, every difference explained M2 Parity-only deliverable
✖ GATE-TOUCH-04 (material finding) ≥ 1 material finding (pre-registered as ≥ 1% of contained metal or ≥ a $M/yr threshold set with the sponsor) attested Reviewed{against} by the site QP or metallurgist as new and plausible M2 (month 12) B5 F8 "checked null": a well-reconciling site yields a certified clean bill, the second pilot site is engaged, and the program gate at month 12 weighs it (§37)
GATE-TOUCH-05 (hindcast) 8–12 historical quarters run rolling-origin; coverage reported with a small-sample caveat M2 —
GATE-TOUCH-06 (public known answers) The §20.4 registry reproduces the published Kibali 2016–2025 MCF series, the Pueblo Viejo 2025 stock-and-flow table (stockpile additions inferred at about 4,560 kt; E258, E259) and the Porgera 2007–2011 source tables, with every irreproducible cell filed as a DiscrepancyRecord M1 Fixtures only

20.11 Guards and proof obligations

Guard Condition Action
G-TOUCH-1 Grade reconciled directly instead of tonnes and metal FMINE-REF-103
G-TOUCH-2 Attribution requested for a non-identifiable pair FMINE-REF-104
G-TOUCH-3 Period ratio computed across a stockpile without the latent-inventory model Refuse; require the state-space form
G-TOUCH-4 An F-factor rendered without its definition version and interval Refuse the render
G-TOUCH-5 A factor applied as a multiplier to a future estimate Refuse; require a bias prior through Strata (§20.5)
G-TOUCH-6 A grade is imported or rendered on a residual (difference) row Store (Δt, Δoz) with grade NOT_DEFINED; file a DiscrepancyRecord
G-TOUCH-CAVE Block-cave draw-point samples used as the grade-control term of F1 for reserve verification Refuse; they are admissible only as observations of cave-draw grade (E386)
PO Statement Verification
PO-TOUCH-1 R1 reconciled estimates satisfy every constraint exactly (to 1e-9 relative) Property test
PO-TOUCH-2 R1 posterior covariance matches Monte Carlo on synthetic flowsheets Statistical test
PO-TOUCH-3 The R2 Kalman smoother equals the batch Gaussian posterior on linear-Gaussian cases Known-answer test
PO-TOUCH-4 NUTS posteriors match conjugate known answers within Monte Carlo error; R̂ < 1.01 and ESS above the threshold are required for publication Diagnostic gate
PO-TOUCH-5 Bias recovery coverage (GATE-TOUCH-02) Synthetic replicates
PO-TOUCH-6 Certificate digest is replay-stable LabRuntime replay

20.12 Galaxy-brain cards (illustrative values)

GB-24 · One month of tonnes, reconciled.

  • Measurements.
    • Truck tonnes: 1,000,000 t, σ = 3%.
    • Mill weightometer: 960,000 t, σ = 1%.
    • Stockpile change from survey: +25,000 t, σ = 15,000 t.
  • Imbalance. r = 1,000,000 − 960,000 − 25,000 = 15,000 t.
  • Equation. x̂ = x − ΣAᵀ(AΣAᵀ)⁻¹r, with AΣAᵀ = 1.217×10⁹.
  • Reconciled.
    • Trucks 988,909 t (−11,091).
    • Mill 961,136 t (+1,136).
    • Stockpile +27,773 t (+2,773).
    • χ² = 0.185 (p ≈ 0.67): no gross error.
  • Metal.
    • Mine-claimed 988,909 t × 1.20 g/t = 38,153 oz.
    • Mill-received 961,136 t × 1.10 g/t = 33,991 oz.
    • Stockpiled 536 oz.
    • Unexplained 3,626 oz (9.5%), so F2(metal) = 0.904.
  • Intuition. The least precise measurement (truck counts) absorbs most of the tonnage correction. Over many months that becomes a payload-bias posterior. The 9.5% metal gap is the real question, and GB-25 asks who owns it.
  • Assumptions. Independent Gaussian errors; one period; the stockpile grade is known (it is not; R2 makes it a latent state).
  • Flip. A χ² p-value < 0.01 → gross-error InvestigationCase before any F-factor is published.

GB-25 · Whose fault is the missing 9.5%? (identifiability and the value of an audit)

  • Model.
    • The observed F2 log-ratio y = b_gc − b_mill + ε = −9.6%, with σ_ε = 1.5%.
    • Priors: b_gc and b_mill ~ N(0, 5%) each.
  • Posterior from F2 alone.
    • b_gc − b_mill = −9.6% ± 1.5% (determined).
    • Individually, b_gc = −4.6% ± 3.6% and b_mill = +4.6% ± 3.6%, with correlation 0.92.
    • The even split simply mirrors the equal priors, so attribution is refused (FMINE-REF-104).
  • After a mill-sampler audit. An audit measures b_mill = +1.0% ± 2.0%. Then:
    • b_gc = −7.1% ± 2.2% (95% interval excludes 0);
    • b_mill = +1.8% ± 1.8%.
  • Intuition.
    • Without an independent measurement, any "it's the grade-control model" story is a prior dressed as a finding.
    • One audit turns a ratio into an attributable, ≥ 1%-of-metal finding: the kind GATE-TOUCH-04 requires.
  • Assumptions. Linear-Gaussian; no stockpile or density terms (R2 includes them, which widens the posterior).
  • Flip. The audit shows b_mill ≈ −9% → the mill sampler owns the gap, and the GC model is exonerated. Either way, the decision is which party fixes what, and that is a DecisionCard.

Open questions.

  • OPEN-TOUCH-1. The pilot site's F-factor definitions and pack conventions (R0 parity depends on them).
  • OPEN-TOUCH-2. Whether the GC model is produced in other software and must be ingested as an observation (OPEN-STRATA-3).
  • OPEN-TOUCH-3. Stockpile mixing-model evidence at the pilot (reclaim sampling).
  • OPEN-TOUCH-4. Whether the CP will accept a reconciliation-section draft for JORC 2026-style disclosure.