FrankenMining

Headframe: the operations twin of record

4,547 words11 subsections5 tablesPlan version 0.1

On this page11
16.1 Doctrine16.2 As-built geometry and survey epochs16.3 Drill and blast (fmine-blast)16.4 Load and haul (fmine-ops::haul, fmine-ops::fleet)16.5 Equipment health, reliability and maintenance16.6 Ventilation and underground environment (fmine-ops::vent)16.7 Dewatering and mine water16.8 Energy, power supply and emissions (EnergyEnvelope)16.9 OT data ingestion16.10 Guards, proof obligations, gates and kills16.11 Galaxy-brain cards (illustrative values)

Source: Brenner pass B6 (planning/brenner/B6_operations_plant_tailings_workforce.md, sub-question B6-SQ1), building on R1, R3, R6 and R7. Every verdict survived a refuter-first attempt and a forced third alternative: H6.1c (AHS intersection-token + safety-bubble DES on LabRuntime + EnergyEnvelope microgrid co-optimizer + G-HEAD-7 uncured-fill refusal) is adopted over H6.1a (smooth cycle-time curves, kept only as PO-HEAD-2 analytic ceiling) and H6.1b (real-time OT closed-loop dispatch, rejected by INV-002 / G-HEAD-1), with H6.1d (event-sourced state-transition twin + MWD/blast-movement spatial assimilation) merged as the site authority substrate.

16.1 Doctrine

  • Twin of record, not twin of control.

    • Headframe holds the evidence-backed state of the operation: as-built geometry, blasts, loads, cycles, equipment condition, airflow, water, energy. Every displayed state is a projection with a staleness tag.
    • No write conduit to ISA-95 Levels 0–2 exists (NONGOAL-002, §31.3).
    • Recommendations (dispatch targets, blend set-points, dig lines, maintenance timing) are EFFECT-* prepared effects. A human or a third-party control system may act on them, but FrankenMining never does.
  • It coexists with the OEM stack. Fleet management, autonomy and dispatch belong to the OEMs:

    • Komatsu FrontRunner (Cortez: 23 haul-truck retrofits completed May 2026, site-wide rollout planned for Q3 2026; Carlin: 40 retrofits from Q2 2026, autonomous operations planned for Q1 2027; FACT, E618, E619), on a new fleet management system whose vendor Barrick does not name (Modular DISPATCH is HYPOTHESIS);
    • Caterpillar MineStar (Boddington: 41 autonomous trucks; FACT R6);
    • Micromine Pitram underground (NGM Goldrush; FACT R6);
    • Wenco, Sandvik and Hexagon.

    Headframe ingests their exports as observations with error models, and scores their predictions (§16.5).

  • The Avathon contract (E024, B5 W1). Data exchange with an incumbent AI platform is limited to anchor-pinned exports of certified projections, plus evidence-only write-back: their outputs enter as ModelledUncalibrated claims until scored. FrankenMining is the auditable kernel that agents cite, not a competing agent platform (NONGOAL-005).

  • The time model is strict. Every telemetry record has sensor time, ingest time and anchor time.

    • Sensor clock drift is estimated per source.
    • Records arriving after an anchor seals are late evidence. They supersede projections; they never edit history (§6.3).

16.2 As-built geometry and survey epochs

Input Processing (fmine-ops::asbuilt) Output
Surface DTM epochs (drone photogrammetry, LiDAR, GNSS pickups) Registration to the mine grid. ICP with pose covariance follows frankensim's fs-asbuilt Kabsch/Umeyama pattern (Pattern, §13.9). Ground-control residuals become the registration error model. Surface epochs with vertical uncertainty per cell
Underground cavity monitoring scans (CMS), drive scans Mesh ingest (LAZ/E57, §32) → watertight check → comparison against design solids Overbreak, underbreak, ELOS per stope, scored against Highwall dilution forecasts (§14.3)
End-of-period surveys Surface-to-surface volume with an interval enclosure, using the divergence-theorem volume over registered meshes (fmine-geom::volcert, §13.9) Mined volume per period and polygon, with uncertainty
Depletion Volumes intersected with Strata L5 → depletion epochs (§13.2) As-mined solids. These are the denominators of F-factors (§20.4).
Stockpile and heap surveys Volume above a base surface whose own uncertainty is modelled. Bulking factor is a claim. Stockpile tonnes posterior (§20.8)

FACT (R6, AusIMM 2022). Standard F2 can misstate tonnes and grade because in-situ models ignore blast swell. Headframe therefore carries swell and bulking as explicit, uncertain parameters per domain, never as a constant.

16.3 Drill and blast (fmine-blast)

Records. The blast lifecycle is:

  • design: pattern, burden, spacing, hole diameter, depth, sub-drill, stemming, explosive product and density, initiation and timing;
  • as-drilled: collar survey, depth, deviation;
  • as-charged: per-hole kg, product, gassing;
  • fired: date and time, weather, misfires;
  • post-blast: muckpile survey, fragmentation images, blast-movement monitors, vibration and airblast records.

The shot_ and blast_ prefixes apply (§0.3).

Measure-while-drilling (MWD) is free geology.

  • Rotary penetration rate, torque, pull-down and specific energy of drilling, at blasthole support, are observations of rock hardness and competence. They feed the Strata hardness and UCS fields (§13.6) through CorrelationCards (specific energy of drilling → UCS proxy) per rig and bit type.
  • Rig-specific bias is a hierarchical term.
  • HYPOTHESIS: MWD-conditioned hardness improves SAG-throughput forecasts measurably over drillhole-only hardness. Tested at the pilot site through registered forecasts.

Fragmentation.

  • Kuz-Ram predicts x50 = A·K^−0.8·Q^(1/6)·(115/RWS)^(19/30), with rock factor A, powder factor K and charge mass Q (FACT[U], R7 §6.1). The uniformity index comes from the design.
  • Swebrec, P(x) = 1/{1 + [ln(x_max/x)/ln(x_max/x50)]^b}, fixes Rosin–Rammler's fines tail (FACT[U], R7 §6.1).
  • Both are cards with per-domain learned parameters. Image-based fragmentation measurement (shovel, truck tray or crusher cameras) is an observation with its own bias, because image methods under-count fines.
  • The fragmentation → mill throughput card closes the mine-to-mill loop (§17.3).

Blast movement.

  • Blasting displaces and mixes material (FACT, R7 §6.1).
  • Movement vectors come from buried monitors (BMM-class) or a movement model calibrated to them. They shift ore/waste polygons before dig-line classification (§15.7).
  • Mixing is modelled as a dilution kernel. Shifting alone does not recover it.

Vibration, airblast and flyrock.

  • Peak particle velocity follows a site law, PPV = k·(D/√W)^−β (FACT[U]). It is fitted by Bayesian regression per monitoring location, with prediction intervals.
  • Charge-per-delay limits at sensitive receptors are computed at a declared exceedance probability (policy data, e.g. AS 2187.2 or USBM RI 8507 frequency-dependent criteria, as a regulatory pack).
  • Flyrock exclusion zones are policy data. FrankenMining computes and records them; it never clears a zone.

Underground development and production blasting.

  • Development rounds are cycle records: drill (jumbo face pattern: cut/burn holes, easers, perimeter holes for smooth-wall), charge (emulsion or ANFO; a charge plan per hole), fire (in the blasting window, from the central blasting system), ventilate and re-enter (re-entry time is policy data from §16.6, with §14.3 seismic exposure rules), scale, muck (LHD), survey, then support (bolts, mesh, shotcrete per §14.3), and the next round.
  • Advance per round = pull fraction × hole depth. Pull is observed per round (often 0.85–0.95, FACT[U]). Overbreak and underbreak come from scanned profiles against design (§16.2) and feed the perimeter-control cards.
  • Development rate is a DES over headings on the §16.4 engine: one jumbo, charge-up unit and LHD are shared across several headings, so interference is explicit. Planned development metres per month are a registered forecast scored monthly (§10), because development shortfall is the usual leading indicator of underground production shortfall.
  • Longhole and ring production blasting: ring design records (toe spacing, burden, hole length), hole deviation from gyro surveys (an observation with its own error model), charging records, and outcomes per stope: fragmentation at the drawpoint and dilution as ELOS from cavity scans (§14.3). Deviation above tolerance updates the predicted fragmentation and dilution before the ring is fired.
  • Backfill (paste or cemented rock fill) is a cycle dependency. Cure time to the required strength is a precedence constraint in the stope sequence (§15), with strength from cylinder tests as evidence.
    • Strength is a FillStrength(t) curve with a degradation flag, not a monotone cure: Loulo paste at 3.5% binder falls from 2.65 MPa at 56 d to 1.10 at 112 d, and Kibali's legacy slag-cement fill has degraded (FACT, E233, E234). Design strength depends on exposure (E236).
    • Planned dilution is a typed DilutionMatrix(stope_type × sequence × wall × n_exposures): Kibali plans 2.0–2.5% per paste wall exposed (FACT, E235).
    • Uncured or degraded fill refuses (G-HEAD-7, FMINE-REF-504). A secondary or tertiary stope that exposes a wall of filled primary stope gets no ring-charge plan or extraction step if the fill's FillStrength(t) is below UCS_design(wall height, span, exposures), or if its cylinder and binder-dosage QA is missing or conflicted. FillStrength(t) covers early-age cure and late-age binder loss from sulphate attack.

Safety-semantic refusal FMINE-REF-401.

  • Reactive ground is pyritic ground where ammonium nitrate can react exothermically. If a hole lies in a domain whose reactivity class is unknown, or whose measured ground temperature exceeds the policy threshold, no ANFO or emulsion charge plan is produced.
  • Only an inhibited-product plan, which requires a human authority token, may be prepared.
  • This uses Strata's S-field projection plus hole temperature records.

16.4 Load and haul (fmine-ops::haul, fmine-ops::fleet)

Ingest.

  • FMS cycle records are snapshot extracts from DISPATCH, MineStar, FrontRunner, Wenco or Pitram (§32). Each cycle carries its components: queue, spot, load, haul loaded, dump, return.
  • Payload comes from on-board weighing with a per-truck bias model calibrated against the weighbridge (§12.5).
  • Assignment of loads to material polygons is a probabilistic join: GNSS position at load time plus bucket position uncertainty. A load is never assumed to come from exactly one block.

The time-usage model is a registered standard (GMG time categories): calendar → available → utilized → productive, with delays typed.

  • Availability alone misleads. A fleet can show 95.7% availability with 28.1% utilization (FACT, R7 §6.3).
  • OEE is computed on calendar time, not loading time. Loading-time OEE overstates performance (FACT, R7 §6.3, Elevli & Elevli 2010).
  • Every time-usage KPI states its category basis, or it is refused (G-HEAD-2).

Haulage model.

  • The haul-road network is a graph with segment grade, rolling resistance, speed limits and surface condition. Routing uses frankennetworkx Dijkstra/A* (FACT, R3 §4.4).
  • Travel time on loaded and empty segments comes from OEM rimpull and retarder performance cards, by truck class and payload.
  • Fuel and energy come from the same cards, which supports diesel vs trolley-assist vs battery-electric comparisons as CapitalCandidates (§23).

Fleet simulation, sizing and autonomous haulage (fmine-ops::haul).

  • A discrete-event simulation runs on deterministic virtual time (asupersync LabRuntime, E012), with stochastic cycle components fitted from FMS records.
  • Autonomous haulage changes the queueing (FACT plus DESIGN). NGM runs Komatsu FrontRunner (partnership launched July 2025; E618). Cortez finished 23 truck retrofits in May 2026 ahead of a site-wide rollout planned for Q3 2026, and Carlin began 40 retrofits in Q2 2026 with autonomous operations planned for Q1 2027 (FACT, E619). Carlin's TR lists 40 Komatsu 930E trucks in a mixed fleet and says nothing of autonomy (FACT, E662). The DES models what governs autonomous throughput (DESIGN; parameters are site-fitted):
    1. reservations: a truck must hold the path lock for its braking envelope before entering an intersection, switchback or dump bay, so bunches become token waits;
    2. staffed vehicles in the autonomous zone: a grader or light vehicle inside a geo-fence slows or stops nearby trucks, often the largest source of cycle variance;
    3. weather and dust: sector speed caps when sensing degrades.
  • Cross-checks:
    • the match factor MF = (N_trucks × loader cycle) / (N_loaders × truck cycle);
    • finite-source queueing (machine-repair model) as an analytic bound;
    • max-plus cycle bounds from lifted fs-tropical.
  • TARGET: 1 shift of 100 trucks in ≤ 10 s.
  • Fleet-size and AHS-retrofit decisions are DecisionCards with the queueing and DES results side by side (GB-17).

Dispatch policy.

  • Real-time dispatch belongs to the FMS.
  • FrankenMining evaluates dispatch policies offline in the DES (assignment by fsci-opt::linear_sum_assignment or min-cost flow) and publishes recommended shovel targets and priorities as prepared effects.
  • Reinforcement-learning dispatch results in the literature are simulation-only (FACT, R7 §5.7). Any learned policy is a forecast that is registered and scored before it may be recommended.

Underground loading, hauling and hoisting.

  • LHD and underground truck cycles come from the same FMS ingest. Cycle components: tram empty, load at the drawpoint, tram loaded, dump to orepass or truck. Drawpoint and orepass states (hang-ups, oversize, wet muck) are typed events with durations.
  • Shaft hoisting. Skip cycle = load + accelerate + full-speed travel + decelerate + dump + settle; hoisting capacity per hour = 3,600 × skip payload ÷ cycle time × availability × utilisation × fill factor. Each factor is a separately registered parameter with the site's own definition. Kibali's 34 skips/h × 14.8 t × 8,760 h × 0.90 = 3.97 Mt against a stated 3.2 Mtpa implies a further ≈ 0.81 factor (INFERENCE, E231, E232). Rope, skip and brake inspections are reliability records (§16.5). The hoist is usually the system bottleneck, so its capacity is a hard constraint in the underground schedule (§15) and its dual value is displayed. A schedule that needs a hoist upgrade (Kibali: 3.4–3.6 Mt/yr UG ore from 2028 against 3.2 Mtpa today) registers the upgrade as a schedule dependency.
  • Decline haulage versus shaft is a CapitalCandidate comparison (§23) on the same performance cards, with ventilation (§16.6) and energy (§16.8) costs from the same realizations.

Dozing, ripping and scraping.

  • Dozer and scraper productivity are performance cards: OEM handbook curves × correction factors (grade, material, operator, visibility), each with a validity domain, calibrated against survey-measured volume changes (§16.2).
  • Ripping versus blasting is a decision card. Rippability enters as an uncertain input from the Strata P-wave velocity or rippability-class field, and the card shows the flip margin on velocity.
  • Dozing and scraping in rehabilitation and TSF construction are earthworks events with as-built survey. They feed the closure cost estimate (§18.6) and the ARO in Bullion (§21).

Demolition and decommissioning.

  • Demolition of structures, plant and infrastructure is closure-plan work: quantities from as-built records, a hazardous-materials register, unit costs with an uncertainty class, all feeding the ARO (§18.6, §21).
  • Each closure domain carries an evidence state: demolished, verified, signed off by the responsible person. As everywhere, FrankenMining records the state; a human signs it.

16.5 Equipment health, reliability and maintenance

Reliability models (fmine-ops::reliability):

  • Weibull life models for components that are replaced (renewal).
  • Power-law NHPP for repairable systems that are not renewal processes (FACT, R7 §6.3, Kumar & Klefsjö 1992).
  • Cox proportional hazards with condition covariates: oil analysis, vibration, temperature, payload history, haul profile.
  • All of these are hierarchical over component → fleet → site → company, so sparse failure records borrow strength.
  • Censoring is honoured: a component removed while still working is right-censored and never treated as a failure (G-HEAD-3).

Wear.

  • Archard's law (volume = k·F·s/H) is lifted or pattern-copied from fs-tribo::ArchardLaw (§13.9).
  • It is used as a card for ground-engaging tools, truck tray liners, chute and mill liners (§17.7) and slurry pipes, with abrasion-index inputs from Strata.

Tyres.

  • TKPH limits per haul profile, with tyre life as a survival model.
  • FACT (R7 §6.3): one study found 93.6% of 455 tyres scrapped before wear-out. Premature scrapping causes are typed (cut, separation, heat) and modelled as competing risks.

Maintenance decisions.

  • Age replacement, condition-based thresholds and component change-out timing are DecisionCards. They are priced in avoided unplanned downtime × production value at the bottleneck, which comes from the Pushback duals (§15.6).
  • RCM taxonomies follow SAE JA1011 (FACT, R7 §6.3).
  • Work orders and spares are SAP PM/MM extracts (§32).

Scoring vendor predictions (DESIGN; the differentiator).

  • Every predictive-maintenance alert from an OEM or AI platform (Avathon, MineStar Health, Modular Predict) is ingested as a registered forecast: asset, failure mode, horizon, stated probability or severity.
  • It is scored when the window closes, using maintenance records and failure codes. The calibration ledger (§10) then holds a per-vendor, per-failure-mode track record: precision, lead time and reliability diagram.
  • Why. These platforms are adopted on business-case IRRs (INFERENCE, R6 §6.8: in the Barrick and Newmont filings read, the only quantified digital results are autonomous-haulage cases; Freeport reports 214 Mlb of incremental copper from leach analytics in each of 2024 and 2025, FACT, E645). No shared score across vendors is published. FrankenMining keeps one, without competing with them.

16.6 Ventilation and underground environment (fmine-ops::vent)

  • Network model.

    • Airways, regulators, doors and fans form a network.
    • Branch resistance follows Atkinson's square law, p = R·Q², which is a quadratic-loss network (FACT, R1: fs-airflow solves fan operating points by interval Newton, and its general-topology graph module is nominal and uncertified).
    • Posture: Bridge after GATE-FSIM-RECONV; until then, Pattern (a Hardy Cross / Newton network solve built in fmine-ops::vent, with fs-airflow fixtures as oracles).
  • Geometry from the twin. The development as-built (§16.2) generates the airway network. Each airway's resistance is a claim from its friction factor, perimeter, length and area.

  • Requirements as policy data.

    • Diesel dilution rates (m³/s per kW, which are jurisdiction-specific). Both Kibali and Loulo use 0.05 m³/s per kW; Kibali states it without units (FACT, E238).
    • The registry carries adopted_standard separately from jurisdiction: Kibali, in the DRC, adopts Western Australian regulations (FACT, E237).
    • Gas, dust and diesel particulate limits.
    • Heat: wet-bulb or other heat-stress index limits.

    These are jurisdictional packs. FrankenMining computes compliance evidence and never asserts compliance (regulatory_compliance_claim = false).

  • Heat. Autocompression, wall-rock heat flux (geothermal gradient and rock thermal properties from Strata), diesel and electrical heat, and groundwater. The rock heat flux is an fs-conduction-type operator (Bridge later); a correlation-card heat load is used before then.

  • Ventilation-on-demand. Set-point recommendations only. Fans and regulators are OT.

  • Refuge chambers and egress. Their positions, capacities and inspection records are tracked as critical-control evidence (§19.5).

16.7 Dewatering and mine water

  • Pump stations, sumps and pipelines form a network.
  • Inflow forecasts come from the hydrogeological model (§14.5) and rainfall.
  • Pump curves and energy are cards.
  • Outputs:
    • P(sump level exceeds alarm level) over the forecast horizon;
    • pumping energy per period;
    • inflow forecasts registered and scored.
  • Mine water flows into the site water balance (§18.4).

16.8 Energy, power supply and emissions (EnergyEnvelope)

  • Diesel, power and explosives consumption are attributed to activities using the same drivers as cost (CostDriverCard, §21.6): litres per tonne-km, kWh per tonne milled.
  • Power is a binding constraint at remote and weak-grid sites (EnergyEnvelope; FACT plus DESIGN).
    • Lumwana (FACT, E668): the expansion targets a 52 Mtpa run rate during 2028 (peak design 54) with electrified ultra-class shovels. A 2024 grid study found that "for every MW generated more than a third is lost as unusable reactive power". The response combines 330 kV transmission lines (complementing STATCOMs at neighbouring mines), 100% BESS backup, 50% emergency generating capacity on site (a target of 31.5 MW by Q4 2025) and 45% imported power within the Southern African Power Pool.
    • Kibali (FACT, E669): three hydropower stations (Nzoro II about 22 MW, Ambarau 10.6 MW, Azambi 10.2 MW; 42.8 MW peak), a 32 MW high-speed diesel bank, a 7 MW BESS (2020) that cut the spinning reserve from nine generators to four, and a 16 MW solar plant with a 15 MW BESS (2025). Renewables supply about 85% of the site's energy; the diesel bank sets the marginal cost in the dry season.
    • Coupling (DESIGN; fmine-ops::energy ↔ fmine-plan §15.6 ↔ fmine-plant §17). Each period has a piecewise-linear supply stack of tiers (hydro and solar, grid or imports, BESS discharge, diesel), each with capacity P_j,t and cost c_j. Demand must fit it: Σ_{s,p} x_{spt} (e_grind(s, p) + κ_O2 S_s 1[p ∈ POX]) + P_hoist,vent,dewater(t) + P_shovels(t) ≤ Σ_j P_j,t, with reactive balance Q_load(t) − Q_comp(t) ≤ Q_max(t) and apparent power P² + Q² ≤ S_max(t)², the latter as a piecewise-linear outer approximation in the LP. The power shadow price λ_MWh(t) then moves soft or oxidized ore to the mills in dry-season or high-tariff windows, shifts deferrable dewatering and hoisting, and prices BESS, compensation and solar expansions as CapitalCandidates against avoided diesel and mill trips.
  • Scope 1 and 2 emissions are computed per activity with factor provenance, following the GHG Protocol. Emission factors are claims with sources and validity.
  • Carbon prices and renewable PPAs enter cost scenarios through the shared scenario index (§23.4).
  • Electrification, trolley assist and renewables are CapitalCandidates.

16.9 OT data ingestion

Source Path Notes
Historians (AVEVA PI and others) Exported snapshots, or a read-only OPC UA client on a DMZ relay node, outbound-only from site (§26, §31.3) Never a write session. Tag maps are versioned.
FMS (DISPATCH, MineStar, FrontRunner, Wenco, Pitram) Vendor export or API snapshots Each vendor schema is a Portal adapter with quarantine-on-import (§32)
Drill rig MWD, blast design software File exports (vendor formats, IREDES where available) —
Condition monitoring Oil-lab certificates, vibration exports Lab certificates are ThirdPartySigned
Fragmentation, BMM, vibration monitors Vendor exports Each carries a measurement-error model
  • Telemetry lands in segment logs (FMT-TELSEG-1, §26) and is compacted into anchor-sealed summaries.
  • fgdb and frankensearch are projections over it, never the authority (B4 G2: a graph-database authority fails at telemetry rates).

16.10 Guards, proof obligations, gates and kills

Guard Condition Action
G-HEAD-1 A recommendation would be delivered to an OT endpoint Refuse. No such conduit exists (§31.3).
G-HEAD-2 A time-usage KPI without its category basis Refuse the render
G-HEAD-3 A censored component life treated as a failure Refuse the fit
G-HEAD-4 A stale instrument is used for a TARP, ventilation or gas statement not_observable (FMINE-REF-202)
G-HEAD-5 A charge plan in a reactive or unknown-reactivity domain FMINE-REF-401
G-HEAD-6 A payload or weightometer reading without a calibration in validity Down-weight to ModelledUncalibrated; flag in reconciliation
G-HEAD-7 A secondary/tertiary stope blast or extraction step adjacent to a paste/CRF-filled stope whose FillStrength(t) < UCS_design(exposure) or whose cure/degradation QA is missing/conflicted FMINE-REF-504 (AdjacentFillUncured, §16.3)
PO Statement Verification
PO-HEAD-1 The DES is deterministic: same seed and inputs ⇒ same event trace digest LabRuntime replay
PO-HEAD-2 DES throughput converges to the analytic finite-source queue for exponential components Known-answer test
PO-HEAD-3 Survey volume enclosures contain the true volume on synthetic surfaces Analytic shapes
PO-HEAD-4 Ventilation network solve satisfies Kirchhoff's laws to tolerance; fan operating point matches the fs-airflow fixture Oracle fixture
PO-HEAD-5 Every ingested vendor prediction resolves to a scored outcome or a declared non-resolution Ledger audit
Gate / kill Threshold (TARGET) Fallback
GATE-HEAD-01 One year of FMS cycle data from a pilot pit ingested; load-to-polygon join coverage ≥ 95% of tonnes Polygon-level aggregates only
GATE-HEAD-02 DES reproduces 12 months of actual shift production within ± 5% (median shift), with calibrated 80% intervals Analytic queueing bounds only; DES labelled uncalibrated
GATE-HEAD-03 Vendor-prediction scoring live for ≥ 1 vendor at the pilot —
✖ KILL-HEAD-1 No FMS export access by month 9 of a site engagement (§34.4) Headframe limited to survey epochs and FA-certified activity drivers

16.11 Galaxy-brain cards (illustrative values)

GB-17 · How many trucks per shovel? Match factor vs queueing.

  • Equation.
    • MF = N·t_load / (N_loaders·(t_load + t_travel)).
    • Finite-source queue (one shovel, N trucks, exponential times): utilization U = 1 − P₀, with P₀ = [Σ_{n=0}^{N} N!/(N−n)!·rⁿ]⁻¹ and r = t_load/t_travel.
  • Substituted.
    • t_load = 2.5 min and t_travel (haul, dump, return, spot) = 22.5 min, so r = 0.111.
    • At N = 10, MF = 1.00, so the deterministic answer is a fully used shovel at 24 loads/h.
    • The queue model gives U = 0.832 and 20.0 loads/h (−17%), with an average queue of 5.1 min per cycle.
    • At N = 12, U = 0.917 and 22.0 loads/h, but per-truck productivity falls from 2.00 to 1.83 loads/h.
  • Intuition.
    • MF = 1 is the point where variability costs the most.
    • The deterministic answer overstates production. The exponential model understates it, because real cycle CVs of about 0.2–0.4 are smaller than exponential's 1.0.
    • The DES with fitted distributions sits between them. The decision depends on whether the shovel (an ore face whose margin is priced by the §15.6 duals) or the trucks are the expensive resource.
  • Assumptions. One shovel; a homogeneous fleet; no breakdowns. Breakdowns enter through availability.
  • Flip. If the shovel serves the bottleneck ore face (high dual), add trucks until marginal loads × margin < truck hourly cost. If it serves waste with stripping slack, run MF < 1.

GB-18 · What is blast-movement monitoring worth on one ore blast?

  • Substituted geometry. An ore zone 40 m wide × 100 m long × 10 m bench at 2.7 t/m³ is 108,000 t. A uniform 3 m horizontal movement with unshifted polygons misallocates 3 × 100 × 10 × 2.7 = 8,100 t on each side.
  • Ore loss. 8,100 t at 1.5 g/t is 390.6 oz; at 90% recovery and $3,000/oz, that is $1.055M of revenue, less $178k of avoided processing at $22/t, net −$0.877M.
  • Dilution. 8,100 t of 0.1 g/t waste processed costs $178k against $70k recovered: net −$0.108M.
  • Total: ≈ $0.98M per blast. Because blasting also mixes, perhaps 60% is recoverable by shifting, so about $0.59M. Monitoring costs perhaps $15k per blast.
  • Intuition. On narrow ore, movement-blind dig lines are one of the cheapest leaks to plug. The value scales as movement ÷ ore width.
  • Assumptions. Uniform movement (real movement varies with depth and the free face); no mill-capacity displacement cost (adding it increases the value).
  • Flip. Movement < 0.5 m, or ore zones ≫ 100 m wide, make monitoring marginal. The pilot's registered F1/F2 changes after adopting shifted dig lines are the test.

GB-40 · AHS intersection tokens vs. staffed haulage (Carlin's planned 40-truck autonomous fleet).

  • Equation.
    • Token service time at a single-lane switchback or dump bay: s = τ_clear + v₀/(2a_brake) + τ_comms.
    • With N trucks of cycle T, each passing each of m single-token points once per cycle, every point sees λ = N/T. Pollaczek–Khinchine wait: W = ρs(1 + C_s²) / (2(1 − ρ)), with ρ = λs.
    • Staffed-vehicle stops cost ΔT_LV = ν_LV · p_overlap · τ_stop · T per cycle.
  • Substituted (illustrative: N = 40, T = 24 min, m = 2, s = 0.367 min, C_s² = 0.25; ν_LV = 0.05 min⁻¹, p_overlap = 0.25, τ_stop = 3.5 min):
    • λ = 1.667 min⁻¹ per point, ρ = 0.611, W = 0.360 min per pass, 0.72 min per cycle;
    • ΔT_LV = 0.05 × 0.25 × 3.5 × 24 = 1.05 min per cycle;
    • the cycle rises 24.0 → 25.77 min, −6.9% fleet capacity, about 3.8 Mt/yr on a 55 Mt/yr pit. A smooth staffed-haulage model predicts no token or geo-fence delay.
  • Intuition. Autonomy removes operator shift-change losses but turns geometric bottlenecks and staffed-vehicle intrusions into hard queueing locks.
  • Assumptions. Single-token points, Poisson-like arrivals and unscheduled staffed entries. Carlin's autonomous operations start in Q1 2027 (E619), so every parameter is a prior until its FMS data exist.
  • Flip. A second lane (c = 2 tokens) gives ρ = 0.306 per server and W ≈ 0.02 min per pass (M/G/2, Lee–Longton), and moving grader work into scheduled windows cuts ΔT_LV by about 80%. Road widening and staffed-vehicle windows become a quantified DecisionCard.

Open questions.

  • OPEN-HEAD-1. FMS export rights and formats at the pilot site (OEM contracts).
  • OPEN-HEAD-2. Whether Avathon will exchange anchor-pinned certified projections (B5 F1).
  • OPEN-HEAD-3. Fatigue and collision-avoidance event data: lawful-basis and works-council constraints (§19.4).
  • OPEN-HEAD-4. Ventilation jurisdiction packs needed for the first underground site.