3,953 words8 subsections4 tablesPlan version 0.1

On this page8
18.1 Doctrine: evidence state, never "safe"18.2 GISTM as a requirements-traceability engine18.3 The TSF twin of record18.4 Site water balance18.5 Acid rock drainage and geochemistry18.6 Closure, rehabilitation and asset retirement obligations18.7 Guards, proof obligations, gates and kills18.8 Galaxy-brain cards (illustrative values)

Source: Brenner pass B6 (planning/brenner/B6_operations_plant_tailings_workforce.md, sub-question B6-SQ3), building on R6 §1.8, §2.8 and §6.5, R7 §8, B4's security model and the C2–C5 corpus. Every verdict survived a refuter-first attempt and a forced third alternative: H6.3b (generalized RequirementSet traceability engine, EsCommitment + OB-COMMIT, three-valued OB-TARP where stale/missing sensors or open manual gates escalate to Indeterminate, and environmental certificate reconciliation) and H6.3d (coupled physical-financial twin: undrained excess pore-pressure ratio B̄ = Δu/Δσ_v, Naranjo-style PAG waste co-disposal storage shadow pricing, and three-measurand closure/ARO completeness with G-FREE-11) are adopted over H6.3a (compliance dashboard / green-light checklist, banned by INV-002 / G-FREE-1) and H6.3c (autonomous 3D coupled Biot/liquefaction FEM as sole authority, rejected by NONGOAL-007 and INV-002). The crate is fmine-tailings.

18.1 Doctrine: evidence state, never "safe"

  • FrankenMining never presents a tailings facility as safe, stable or conformant. geotechnical_signoff and regulatory_compliance_claim are hard-wired false (§0.4).

  • What it presents is the evidence state per facility and failure mode:

    • which failure modes are monitored, by what, and with what detection capability;
    • which instruments are stale;
    • when the Engineer of Record (EoR) last reviewed, and the latest Independent Tailings Review Board (ITRB) opinion;
    • which GISTM requirements have current evidence.

    This follows R7 §8.4.

  • Missing data is not reassurance. An offline piezometer gives no evidence, not "pressure normal" (FACT, R7 §8.4; FMINE-REF-404).

  • InSAR "no acceleration detected" is weak evidence for many failure modes.

    • InSAR is a screening tool. "Most potential failure modes may not exhibit InSAR-detectable accelerations," and line-of-sight geometry limits it (FACT, R7 §8.3, Rana et al. 2024).
    • Its likelihood ratio for "no failure in progress" is therefore set per failure mode, and is near 1 for modes it cannot see.
  • The historical lesson is workflow, not sensing.

    • At Jagersfontein, toe movement was visible in satellite imagery from February 2019, years before the 2022 failure (FACT, R7 §8.1).
    • Brumadinho needed no specific external trigger (FACT, R7 §8.1, Robertson et al. 2019).
    • So Freeboard's core artifacts are obligations and escalation (OB-TARP, OB-REVIEW), not dashboards.

18.2 GISTM as a requirements-traceability engine

FACT (R6 §6.5; R7 §8.2):

  • GISTM was launched in August 2020 by ICMM, UNEP and PRI. It has 6 topics, 15 principles and 77 requirements, which map to 219 conformance-protocol criteria.
  • Its roles are the Accountable Executive, the Responsible Tailings Facility Engineer, the EoR, and an ITRB or senior independent reviewer. An ITRB is required for Very High and Extreme consequence classes.
  • Consequence classes: Low, Significant, High, Very High, Extreme.
  • ICMM members committed to conformance by August 2023 for Very High/Extreme facilities and by August 2025 for all others.
  • Barrick (FACT, R6 §1.8):
    • 64 facilities, 18 of them Extreme (6) or Very High (12).
    • Of those 18: 14 fully conformant, 1 partial, 1 in safe closure, and 2 at Reko Diq for which Barrick "cannot disclose conformance to GISTM in 2026".
  • Newmont (FACT, R6 §2.8): "meeting the majority of GISTM requirements across all tailings storage facilities", with 11 priority Very High/Extreme facilities.

Design (DESIGN).

  • GistmRequirement is registry data, versioned by standard edition and conformance protocol.
  • For each (facility, requirement), FrankenMining maintains an evidence dossier:
    • documents (design reports, dam safety reviews, EoR inspection reports, ITRB minutes, emergency preparedness plans, consequence classification studies, community engagement records);
    • monitoring evidence;
    • the attestations of named role holders;
    • freshness rules, e.g. an annual EoR inspection, or a dam safety review at the frequency the classification sets.
  • Each dossier cell's knowledge state comes from the FSS lattice (§7.2): current, stale, missing, conflicted, not_applicable{attested reason}.
  • The output is the facility × requirement matrix with evidence state and the actions due. It renders into the annual GISTM disclosure package as a draft for the Accountable Executive. That person signs, and the signature is recorded as a DisclosureAct (§24 pattern).
  • Why this is a strong second-wave module (B5, R6 [INF]). Both majors disclose against it every August. It is bounded, high-trust and requirement-shaped, and it needs no OT write path. B5 placed it in M5 (§37).
  • Consequence class is per facility and may be absent. Kibali CTSF1/2 are "High" and CTSF3 "Very High" (FACT, E216); Kibali's FTSF and the Loulo TSF state no class, and NGM's reports disclose none, only conformance claims (FACT, E218, E191). A missing class is stored as NULL and never inferred; it is a data gate for the matrix. Design-flood criteria are per facility too (CTSF3: EDF 1:100 24 h 153 mm, IDF 72 h PMP 487 mm, 1.5 m freeboard; Loulo: 2.7 m for 1:50 72 h; E217, E220).

Requirement sets beyond GISTM, and the ESIA commitments register (DESIGN; C5 §4.1).

  • RequirementSet is a registry kind with variants {GISTM, ESMP, PermitCondition, IFC_PS, EP4, LocalContentAgreement}. Each set carries kind, edition, jurisdiction, a DocLocator (doc no, revision, page, table/row) and DocApproval (Draft{rev} or Approved{stamp}). The §18.2 matrix, freshness rules and DisclosureAct are reused unchanged. Solution-holding heaps and valley-fill leach facilities (§18.3) use permit-derived sets: Veladero's requirement set is its permit plus ICMC certification, not GISTM (FACT, E280).
  • EsCommitment = {source locator, verbatim text, firmness (Will, Hedged{phrase}, ToBeDefined), mitigated impacts, the stakeholder concerns it responds to, standard clauses, owner role, phase, monitoring spec (measurand with its chemical basis §25.2, CRS location, frequency, limit and averaging time), trigger (None is shown, never hidden), reporting and freshness}. Impact ratings keep a fixed identity and sign, and a sign change is a new Impact (E338). A commitment due at a frequency is an OB-COMMIT obligation (§26).
  • ESMP tables are requirement-shaped. Every cell sourced from a draft document caps at conflicted or stale (E304; RISK-29).
  • Facility lifecycle. A facility that is designed but not built is not_constructed{design_stage}, separate from venture_wall and embargo (E308).
  • Standards are registry rows {instrument, clause, jurisdiction, edition, phase applicability, averaging time}. Conservation status is a Claim keyed by (list, edition); a renderer shows every list's status, and a score that uses one list names it (E345).

18.3 The TSF twin of record

Element Content Evidence class
Geometry Embankment raises by epoch, beach, pond extent and level, decant structures, spillways, freeboard; L5 anthropogenic body (§13.2) Survey (Measured)
Construction TailingsDisposalMethod {Impoundment{raise: Upstream, Centreline, Downstream}, FilteredDryStack, InPit, PasteBackfill, CoDisposalWithWaste, Riverine, Submarine}; zone materials and their specifications; construction QA records. For riverine disposal the twin of record is the downstream compliance-monitoring network and its exceedance history; there are no embankment failure modes and GISTM's facility framing does not apply (Porgera; FACT, E297) Attested design + Measured QA
Materials Tailings PSD, density, consolidation and strength (CPTu-derived state parameters), embankment fill Measured, via cards
Instrumentation Vibrating-wire piezometers (with drift checks), inclinometers, settlement monuments, survey prisms, InSAR, seepage weirs, pond level, rainfall Packet-plane streams with calibration and staleness monitors (§6.1)
Deposition Deposition plan, spigot positions, rate of rise, water recovery Plan (DESIGN) + Measured
Studies Consequence classification, dam-break and inundation studies, stability analyses, seismic hazard Attested external studies, ingested with validity
Gates and valves Manual gate and valve positions on solution and tailings circuits, as attested observations with a freshness bound. A stale or unknown position renders position unknown, never "contained". Veladero's 2015 release passed through a diversion-channel gate "that was open at the time" (FACT, E282). FrankenMining has no write path to these devices (§31.3) Attested observation

Solution-holding heap and valley-fill facilities (DESIGN; C4 P4). The same twin covers them: in-heap solution level against the permitted limit; leak-collection (LCRS) level and pumped volume as liner-leak indicators; a seasonal melt forecast registered as P(level > limit); and a permit-derived requirement set. Veladero's Trigger Limits are PSSA ≤ 3,927 MASL, LCRS ≤ 3,914.7 MASL and LCRS pumping ≤ 270 m³/day, and an exceedance restricts water make-up and cyanide addition (FACT, E280, E281). The evidence state is rendered, never "within limits" from stale data (FMINE-REF-404).

Failure-mode evidence state (DESIGN). For each credible failure mode, the twin shows:

  • the monitored indicators;
  • the detection capability: what change, how fast, by which instrument;
  • current freshness;
  • TARP state, using the TARP automaton shared with Highwall (§14.4);
  • the last engineering assessment.

The failure modes covered are overtopping, slope instability, static liquefaction, seismic liquefaction, internal erosion and piping, foundation failure, and decant or spillway failure.

Stability and seepage.

  • Limit-equilibrium sections reuse Highwall's LEM solvers (§14.2), with pore pressures from piezometers.
  • Liquefaction triggering and post-liquefaction strength come from CPTu state-parameter cards.
  • Seepage uses confined Darcy through the fs-conduction operator twin (Bridge after GATE-FSIM-RECONV). Unconfined and coupled consolidation are gaps (E010; NONGOAL-007). The EoR's own numerical models enter as attested results.

Rate of rise, the pore-pressure ratio B̄ and PAG co-disposal (DESIGN plus FACT).

  • Pore-pressure response to loading. For each raise or deposition lift with vertical stress increment Δσ_v = γ ΔH, fmine-tailings tracks B̄_k(t) = Δu_k / Δσ_v,k at each foundation and slimes piezometer k as a registered, scored forecast family, linked to the FoS sensitivity J_u of §14.5. B̄ near 1 means pore water carries the load; B̄ falling with time means drainage. A site threshold B̄_crit, set by the EoR from CPTu state-parameter screening and laboratory work, raises an OB-TARP rate-of-rise obligation. B̄ is an indicator, not a liquefaction criterion; triggering analysis stays with the EoR (NONGOAL-007; GB-42).
  • PAG waste inside the TSF (FACT, E667). At Pueblo Viejo, tailings go to El Llagal until 2030 and then to the new Naranjo TSF. From 2028 to 2045 PAG waste rock is placed in a dump inside the Naranjo impoundment and is submerged beneath tailings at the end of mining, under at least 10 m of tailings cover; until Naranjo is ready, PAG goes to temporary dumps and is rehandled. fmine-tailings keeps one storage balance, V_tailings(t) + V_PAG(t) + V_water,min(t) ≤ V_permitted(t), whose shadow price per m³ feeds Pushback's pit and dump optimisation (§15.6), with the Table 15-5 sustaining-capital rates as the cost prior (E665).

18.4 Site water balance

  • Model (fmine-tailings::water). A stochastic site-wide water balance covers:

    • precipitation, evaporation and runoff;
    • pit inflows (§14.5) and dewatering (§16.7);
    • process demand and reclaim;
    • TSF pond, decant and seepage;
    • treatment and discharge.

    Monte Carlo over climate sequences follows the GoldSim-class practice (FACT[U], R7 §8.3).

  • Conservation is enforced (INV-005): every water node balances per period within measurement tolerance, or the period is refused.

  • Climate non-stationarity is a known unknown (FACT[U], R7 §8.3). Climate scenarios are an index dimension (§23.4). The UU term for unprecedented storms is a flip margin, e.g. "freeboard is breached if the wet season exceeds X".

  • Outputs (each a registered forecast):

    • P(pond level exceeds maximum operating level) over horizons;
    • P(discharge exceeds permitted volume or quality);
    • make-up water needs.
  • Discharge criteria are jurisdictional policy data. FrankenMining reports evidence against them and never asserts compliance.

  • Limits are typed by chemical basis and averaging time (§25.2). A lab reporting nitrate as N is not compared with a limit stated as NO3 until both sit on one basis (E322–E324). Two-week samples are not compared with annual limits.

  • Reported tables reconcile to certificates. Environmental samples use LabCertificate (§12.1). A certificate sample with no reported row, an ID that needs an alias map, a date outside the stated campaign window, or a text claim that contradicts the cell becomes a discrepancy-register entry. Fixture: an environmental certificate with more samples than the report's table (E325–E328). Lab qualifiers travel with the value.

  • Water-balance nodes for greenfield abstraction. Abstraction permit vs installed capacity vs demand (E312, E313); RO product and RO reject (E318); camp design vs occupancy. Climate inputs are tagged Transferred until the on-site record passes a registered length (E334, E335).

  • DATA-GATE: groundwater TARP. A TARP for an abstraction field needs piezometer streams and community-well baselines. Without them its state is Indeterminate, which escalates per §14.4 (E330, E331, E333).

18.5 Acid rock drainage and geochemistry

  • Static tests (FACT[U], R7 §8.3; GARD Guide, MEND 1.20.1):
    • Maximum potential acidity MPA = 30.6 × S% (kg H₂SO₄/t).
    • Acid neutralizing capacity ANC.
    • Net acid producing potential NAPP = MPA − ANC.
    • Neutralization potential ratio NPR = ANC/MPA.
    • NAG pH.
  • Classification thresholds (e.g. NPR < 1 PAG, 1–2 uncertain, > 2 NAF) are policy data from the site's management plan, not code constants.
  • Kinetic tests (humidity cells, columns) are long-run evidence. Prediction uncertainty is large and long-tailed in time (FACT[U], R7 §8.3).
  • Block-level P(PAG) is a Strata projection (§13.6): NAPP per realization from the S and ANC fields, with ANC's sparse measurements carried as a field with its own measurement error.
  • Destination classification by expected loss (DESIGN; GB-22). The cost of placing PAG as NAF (later remediation, perpetual treatment) is far larger than the cost of encapsulating NAF. So the expected-loss threshold on P(PAG) is low, and many point-estimate NAF blocks are treated as PAG or sent for more testing.
  • Refusal FMINE-REF-402. No NAF-dump plan is produced for material whose ARD class is unknown (§15.5).
  • Leading indicators. Seep chemistry (pH, sulphate, metals) at monitoring points is a registered forecast family, scored against the dump's predicted evolution.
  • Stockpile oxidation is one latent. The weathering state that degrades a sulphide stockpile's recovery (§20.8) also drives its ARD; Pueblo Viejo assumes all stockpiles are PAG (FACT, C4 P3).

18.6 Closure, rehabilitation and asset retirement obligations

  • Closure cost estimate. A stochastic estimate over activities (earthworks, covers, revegetation, water treatment, demolition, monitoring, social transition). It uses reference-class priors for closure cost growth (REFCLASS- records, §9.3) and the ICMM Integrated Mine Closure Good Practice Guide (updated February 2025; FACT, R7 §8.3) as the activity taxonomy.
  • Perpetual water treatment is the tail. Its PV is extremely sensitive to the discount rate and to its duration, which is unknown. FrankenMining shows that sensitivity as a flip margin and never hides it inside a point estimate.
  • ARO accounting is done by FA (§21.5). FrankenMining computes the PV inputs: cash-flow profile, inflation, the discount-rate basis per IAS 37 or ASC 410-20 (book-specific), and revision drivers. It posts revisions as Adjusting entries with reason EstimateChange and the closure study as evidence (FACT, R4 §5.7: FA has no PV or accretion law, so FrankenMining computes and FA records).
  • Progressive rehabilitation is tracked as completed areas with evidence (surveys, vegetation monitoring). It reduces the obligation only through an attested revision.
  • Financial assurance (bonds, trusts) per jurisdiction is registry data, compared against the stochastic estimate's P90.
  • At least three closure numbers exist per site, each a named measurand with its basis label: the regulator's assurance (bond), the operator's estimate (an IFRS/IAS 37 provision only where so labelled), and the stochastic estimate. They are rendered side by side, undiscounted and discounted, and never reconciled as one quantity.
    • Bond ÷ operator estimate is 2.7× at Carlin, 2.2× at Turquoise Ridge and 1.5× at Cortez (INFERENCE, E188).
    • Pueblo Viejo: $569M LOM, of which $273M is in the provision ($126M discounted), against $250M of assurance (FACT, E271). Kibali carries $41.5M undiscounted and $25.8M discounted (FACT, C3 §3.7).
    • An unlabelled "closure model" cost is never assumed to be the IFRS provision.
  • Closure completeness check. Every stored hazardous inventory maps to an ARO line (Veladero's mercury does not; E285).
  • Tailings capacity runway is a monitored quantity with permitting lead time: Goldstrike's storage lasts "through 2028" while its new TSF is still in permitting (FACT, E190). Pushback consumes it as a constraint (§15.6).

18.7 Guards, proof obligations, gates and kills

Guard Condition Action
G-FREE-1 Any system-authored rendering that would state or imply "safe", "stable" or "conformant" Refuse; render the evidence state instead. A source document's own wording ("will safely store"; E267) is imported as an attributed Assertion, rendered in quotation marks with author and locator, never restated without attribution
G-FREE-2 A stale or offline instrument, or a gate or valve position past its freshness bound, contributes to a "within TARP" or "contained" statement FMINE-REF-404
G-FREE-3 A GISTM requirement shown as satisfied without a current, attested evidence item Refuse; show missing or stale
G-FREE-4 A water balance period that does not close within tolerance FMINE-REF-101
G-FREE-5 ARD class unknown and a NAF destination is requested FMINE-REF-402
G-FREE-6 Tailings data from a facility under a venture wall or disclosure embargo (e.g. paused project review) FMINE-REF-302 or 301
G-FREE-7 A stakeholder Concern has no responds_to commitment and no attested not_addressed{reason} Show missing. Demo: a recorded stakeholder concern absent from the document's consultation summary (E331, E332)
G-FREE-8 A reported (consequence, significance) differs from the registered rating method applied to its own inputs conflicted. Demo: a reported rating that does not recompute from the document's own matrix (E337)
G-FREE-9 A monitored parameter with a limit or receptor has no trigger Render "no TARP registered"; never "compliant"
G-FREE-10 A commitment with firmness = ToBeDefined is past its phase start missing
G-FREE-11 A registered HazardousByproduct inventory (e.g. Veladero flasked Hg; E285) or engineered structure has no mapped ARO/closure activity line (UnmappedClosureInventory) Refuse closure-completeness pass; surface unmapped liability on the Closure DecisionCard
PO Statement Verification
PO-FREE-1 TARP evaluation is three-valued, and Indeterminate escalates like Triggered for notification Exhaustive automaton test (shared with PO-HIGH-1)
PO-FREE-2 Water balance conserves volume per node and period Property tests
PO-FREE-3 The GISTM matrix is a pure function of (registry edition, evidence cut, freshness policy) Replay test
PO-FREE-4 Closure estimate PV is reproducible from cash flows and the declared rate basis to $1 Known-answer test
Gate / kill Threshold (TARGET) Fallback
GATE-FREE-01 Pilot: one company's full facility × requirement GISTM matrix assembled from its own documents, reviewed by its tailings function, with ≥ 95% of cells resolved to a knowledge state —
GATE-FREE-02 TARP automaton live on ≥ 1 facility's instrumentation export with staleness monitors; zero silent Indeterminate → NotTriggered mappings in a 3-month shadow run Document-only evidence state
GATE-FREE-03 Water balance forecasts registered for 12 months; 80% interval coverage of pond level in [0.70, 0.90] Deterministic balance with sensitivity, labelled uncalibrated
✖ KILL-FREE-1 The client's tailings function declines to let software hold the evidence dossier (accountability concern) Read-only mirror of their system, with FrankenMining computing only freshness and the TARP evidence state

18.8 Galaxy-brain cards (illustrative values)

GB-21 · Freeboard exceedance under climate shift (and what a pump buys).

  • Equation.
    • The pond exceeds its maximum operating level if wet-season net inflow I > storage S + pump-out capacity C.
    • With I ~ lognormal(median m, σ_ln = 0.35): p = 1 − Φ(ln((S + C)/m)/σ). Over a life of n years, 1 − (1 − p)ⁿ.
  • Substituted (S = 1.8 Mm³, C = 0.5 Mm³):
    • Today, m = 0.9 Mm³: p = 0.37%/y (1 in 272), which is 5.4% over 15 years.
    • With a climate shift (m + 15%): p = 1.13%/y (1 in 89), which is 15.6% over 15 years.
    • Adding 0.3 Mm³/season of pump capacity restores p = 0.43%/y (6.2% over 15 years).
  • Intuition.
    • A 15% shift in the median triples the tail probability.
    • Sustaining capital spent on pumping is risk reduction, not an NPV project (§23.2). The DecisionCard prices it against the CVaR of an exceedance, not against AISC, where deferral looks free.
  • Assumptions. Lognormal tail; independent years; storage fixed by the raise schedule. Real tails may be heavier, and the UU term is a flip margin on σ.
  • Flip. σ_ln > 0.45 or a raise delay that shrinks S → re-rank; the TARP for pond level binds first.

GB-22 · Point-estimate NAF that should be treated as PAG.

  • Equation.
    • NAPP = 30.6·S − ANC. Under Gaussian errors, P(PAG) = Φ(E[NAPP]/sd[NAPP]).
    • Treat as PAG when P(PAG) > c_FP/(c_FP + c_FN).
  • Substituted.
    • Block A: S = 0.8% ± 0.25 and ANC = 20 ± 6 kg/t. NAPP = 4.5 ± 9.7 and NPR = 0.82, so P(PAG) = 0.68 (PAG either way).
    • Block B: S = 0.3% gives NAPP = −10.8 and NPR = 2.18, which classifies as NAF by point estimate, yet P(PAG) = 0.13.
    • With encapsulation cost c_FP = $2/t and later remediation cost c_FN = $40/t, the threshold is P* = 0.048, so Block B is treated as PAG or tested further.
  • Intuition. Asymmetric losses plus sparse data mean the "uncertain" class is much larger than the NPR thresholds suggest. Sulphur carries a 30.6× multiplier, so at Block B sulphur precision dominates sd[NAPP] (7.65 of 9.72 kg/t): repeat S assays are worth more than ANC tests here, and both have quantifiable VOI.
  • Assumptions. Gaussian errors; independent S and ANC errors (they are often correlated in carbonate-bearing units, which a joint field handles); c_FN excludes perpetual treatment (adding it lowers P* further).
  • Flip. P* = 0.048 needs sd[NAPP] ≤ 6.47 kg/t. ANC testing alone cannot get there (ANC sd = 2 still gives P(PAG) = 0.086). S sd ≤ 0.15% together with ANC sd ≤ 4 kg/t gives sd 6.09 and P(PAG) = 0.038 → NAF.

GB-42 · Pore-pressure ratio B̄ vs. a drained assumption on a raise over contractive slimes.

  • Equation. A raise ΔH adds Δσ_v = γΔH and Δu = B̄Δσ_v, so σ′_v = σ′_v0 + (1 − B̄)Δσ_v. In a one-dimensional simplification τ_f = σ′_v tan φ′ and FoS = τ_f / τ. After triggering, strength falls to the liquefied ratio s_u(liq)/σ′_v0, typically 0.05–0.12 (Olson and Stark 2002).
  • Substituted (illustrative: σ′_v0 = 275 kPa, φ′ = 28°, τ = 88 + 24 = 112 kPa, ΔH = 5 m, γ = 18 kN/m³, so Δσ_v = 90 kPa):
    • drained (B̄ = 0): σ′_v = 365 kPa, τ_f = 194.1 kPa, FoS = 1.73;
    • measured B̄ = 0.72: Δu = 64.8 kPa (6.6 m of head), σ′_v = 300.2 kPa, FoS = 1.43, below a 1.50 criterion;
    • if 40% of the slip surface liquefies at s_u = 0.08 × 275 = 22 kPa: FoS = (0.40 × 22 + 0.60 × 159.6) / 112 = 0.93.
  • Intuition. A drained FoS of 1.73 can sit beside an undrained one below 1 when the raise outpaces drainage, and tracking B̄ is what tells them apart.
  • Assumptions. Contractive state (ψ > −0.05 from CPTu); one-dimensional loading; the 40% liquefied fraction is a scenario, not a prediction.
  • Flip. Slowing the rate of rise until B̄ ≤ 0.25 keeps FoS ≈ 1.63, and the rate-of-rise TARP acts on B̄ before total head reaches its static trigger.

Open questions.

  • OPEN-FREE-1. Whether tailings functions will accept FrankenMining as the evidence-dossier system, or only as a mirror (KILL-FREE-1).
  • OPEN-FREE-2. Instrument export formats and staleness semantics at the pilot facility.
  • OPEN-FREE-3. Which jurisdictional packs (CDA, ANCOLD, national regulations) the first clients need.
  • OPEN-FREE-4. How Reko Diq-style "cannot disclose" states are represented: a venture-wall or embargo state with an attested reason (§31.2). Partial answer: for a facility not yet built, not_constructed{design_stage} may be the right state (INFERENCE, E308). The reason must come from Barrick as an attested reason.