FrankenMining

Hallmark: the resource and reserve register, attestation and disclosure

2,916 words10 subsections5 tables1 listingPlan version 0.1

On this page10
24.1 Doctrine24.2 Code status that shapes the renderers (FACT, R7 §4.2; B5 W7)24.3 The register model24.4 The classification support pack (evidence for the CP)24.5 The data-verification evidence index24.6 Renderers24.7 Statement-to-statement reconciliation24.8 Links to accounting and capital24.9 Guards, proof obligations and gates24.10 Galaxy-brain card (illustrative values)

Crate: fmine-reserves. Sources: R7 §4.2 (codes verified to October 2026), B1 (snapshot triple), B5 W7, E031.

24.1 Doctrine

  • FrankenMining never classifies resources or reserves. reserve_disclosure_claim is hard-wired false (§0.4; NONGOAL-003). Classes (Measured, Indicated, Inferred; Proved/Proven, Probable) are qualitative labels a named Competent or Qualified Person assigns. None of the codes prescribes an estimation method or a probabilistic definition of the classes (FACT[U], R7 §4.2).
  • FrankenMining computes the evidence for the CP's decision and records the decision as a signed, versioned human act with rationale: the CompetentPersonAct.
  • Store once, render many. Estimates are stored once with full uncertainty and rendered by versioned rule sets per code, because the codes are in flux (2024–2026).
  • The regulatory tailwind is probable, not certain (R7 §4.2; E031). The JORC exposure draft proposes a mandatory reconciliation section and defines risk as the effect of uncertainty; final wording and commencement are unverified and JORC 2012 remains in force. That aligns directly with Touchstone (§20.7) and the calibration ledger (§10).

24.2 Code status that shapes the renderers (FACT, R7 §4.2; B5 W7)

Code Status (October 2026) Features the renderer must handle
JORC 2012 In force Table 1 checklist; CP sign-off
JORC 2026 (provisional) Under parent-body, ASX and ASIC review; about a one-year transition after finalization; no commencement date Draft content (wording unverified): "Specialist" role; reasonable prospects "more likely than not" with a documented Reasonable Prospects Assessment; mandatory reconciliation section; risk as the effect of uncertainty; rounding to reflect relative uncertainty
CRIRSCO Template (June 2024 update) Current "Eventual" removed; CP requires a recognised professional organisation with enforceable discipline and ≥ 5 years' relevant experience
NI 43-101 Current form in force. Replacement proposed 12 June 2025, not final. Proposal: "mineral project"; QP needs 5 years' relevant experience without the formal-education requirement; "relevant" replaces "material"; specific disclosure of QP data verification per technical-report item (B5 W7); more Indigenous, community and environmental disclosure
SEC S-K 1300 In force since fiscal years from 1 January 2021 Cut-off grade and price must be disclosed; technical report summary on first or materially changed disclosure; "proven/probable"
PERC 2021, SAMREC 2016 In force Renderer packs added on client demand

A renderer for a code version not yet in force is labelled "draft standard" on every page (G-HALL-2).

24.3 The register model

pub struct EstimateStatement {                       // one per (deposit, effective date, basis)
    pub id: StatementId, pub deposit: DepositId, pub effective: Date, pub kind: StatementKind, // Resource | Reserve
    pub snapshot: SnapshotTriple,                    // (EvidenceCut, SpecHash, Vec<ProjectionReceiptHash>), §13.2
    pub process_inventory: Inclusion,                // Included | Excluded (PV excludes it; Veladero and Porgera include it)
    pub price_deck: DeckRef,                         // { evaluation: DeckRef, shell_selection: Option<{revenue_price, discount_rate}> }
    pub cutoffs: Vec<CutoffSpec>, pub attributable: OwnershipRef,
    pub resource_inclusion: Inclusive | Exclusive, pub rounding: RoundingRule,
    pub qp_relationship: Independent | Employee, pub item22: Included | ProducingIssuerExemption,
    pub rows: Vec<StatementRow>,                     // domain × class, with intervals for internal use
    pub modifying_factors: Vec<ModifyingFactorClaim>,// mining, processing, metallurgical, infrastructure, economic, marketing,
                                                     // legal, environmental, social, governmental: each a Claim with evidence
    pub rpee: Option<ReasonableProspectsAssessment>,  // documented assessment (JORC 2026 draft, CRIRSCO)
    pub cp_acts: Vec<CompetentPersonActRef>, pub mnpi: MnpiLabel, pub supersedes: Option<StatementId>,
}
pub struct StatementRow {
    pub source: SourceKind,                          // InSituOpenPit | InSituUnderground | Stockpile | ProcessInventory
    pub route: Option<ProcessRoute>,                 // HeapLeach | DumpLeach | Mill | FlotationPox | ...
    pub point_of_reference: PointOfReference,        // per row, not per statement: in-situ | ROM at crusher | plant feed | product
    pub metal_stage: MetalStage,                     // Contained, or Recoverable{card} for process inventory (§25.2)
    pub tonnes: Option<DryTonnes>,                   // None only for ProcessInventory (Porgera's 102 koz row has no tonnes)
    pub class: Class, pub grades: Vec<GradeQty>, pub metal: Vec<MetalQty>, pub intervals: Option<RowIntervals>,
}
pub struct OwnershipRef {                            // bitemporal
    pub valid_from: Date, pub valid_to: Option<Date>,
    pub interests: Vec<(HolderRef, Ratio, HolderKind /* ListedCorp | FederalSOE | ProvincialGovt | ... */,
                        InterestBasis /* Funded | FreeCarried */)>,
    pub control_basis: ControlRef,                   // separate from economic interest
    pub arrangement: InKind | Entity | MarketingAgent { agent: PartyRef },
}
pub enum ModifyingFactorClaim { /* ...as listed above..., */
    Tenure { instrument: InstrumentRef, expiry: Date,
             renewal_state: Granted | Applied | Pending { expected: Date } | NotApplied | Refused,
             depended_on_by: DateRange },
}
pub struct CompetentPersonAct {
    pub person: PersonRef, pub rpo: MembershipRef, pub relevant_experience: DocumentRef,
    pub scope: ActScope,                             // which deposits, domains, items
    pub decisions: Vec<ClassificationDecision>,      // volume → class, with rationale and the support pack consulted
    pub support_pack: ClassificationSupportPackRef,  // §13.11: evidence for, never a class
    pub signature: AttestationRef, pub date: Date,
}
  • Internal intervals vs disclosure. Rows carry intervals internally. Disclosure renders what the code requires, with rounding per the code version.
  • Point estimates. The disclosed point estimate is the CP's chosen estimator, usually DeclaredOk (§13.1). The belief-ledger e-type is shown beside it to the CP, but never substituted silently.
  • Reasonable prospects. The RPEE assessment record captures the "more likely than not" reasoning the JORC 2026 draft would require, with the pit shell or stope envelope at a declared deck as evidence.
  • Why rows carry the point of reference (C4 P2). Real statements mix sources and bases: Pueblo Viejo states ROM delivered to the crusher and excludes process inventory (FACT, E261); Veladero includes pit, stockpile and leach-inventory rows, and its "contained" leach row arithmetically equals the recoverable-basis book (FACT, E274, E276); Zaldívar splits rows by route (E288). When a source label contradicts the arithmetic, the importer files a discrepancy row and never relabels silently.
  • Ownership is bitemporal (C4 P10; C5 §4.6). Veladero went from 100% to 50% on 30 Jun 2017, inside a reported series, and its doré is sold to Barrick "as agent for" the partner (FACT, E273); Porgera was 95% (BNL) in 2011; since 22 Dec 2023 it is 51% PNG stakeholders and 49% Porgera (Jersey) Ltd (50/50 Barrick–Zijin), so Barrick holds 24.5% equity but 23.5% of economic benefits, and the Q2/Q3 2024 summary sheets label it 47.5% while their values are at 24.5% (FACT, E293, E428–E432, E468, E469); Zaldívar's boundary agreement stockpiles ore for the other owner (E292). Reko Diq's province holds 15% funded and 10% free-carried (FACT, E302, E303). Series that cross a change render per interval; disagreeing documents are conflicted; free-carried interests change attributable cash flow (§21) and capex funding (§23). Material lots carry owner where a boundary agreement exists.
  • Tenure (C4 P6; C3 §3.6). G-HALL-6 highlights, in the QP pack and the §35 register, any scheduled reserve period after an instrument's expiry or dependent on a permit whose state is not Granted. Cases: Porgera's 2012 reserve LOM ran past the 2019 SML expiry before any extension application had been made (FACT as of March 2012, E296); BNL applied in June 2017, the SML expired on 16 Aug 2019 and the State refused the extension on 24 Apr 2020 (FACT, E426, E425); Pueblo Viejo's reserve LOM to 2048–2049 depends on a Naranjo starter-dam permit not yet granted and about 680 households resettled (FACT, E269, E270); Kibali's permits expire 2029/2030 against a LOM to 2043 (FACT, E245). The software does not decide the class.
  • Reserve Claims cite the technical report or the annual reserve table, never investor-deck endnotes: deck components can fail to sum to the deck's own total (C1 DR-13; E133). A secondary "reserve", one document quoting another's estimate (E310), is stored as Assertion{source: secondary}, and G-HALL-1/3 refuse any render of it as a reserve.
  • Issuer reserve rows are imported assertions (B7). Through M2, public reserve and roll-forward figures are stored as IssuerReserveRow (Assertion{source: issuer}), with the price deck and the filing vintage as separate keys. They never enter EstimateStatement, which needs a snapshot triple and a CP act (G-HALL-3) that no public filing supplies. Where filings disagree, the first-filed row and the later one are both kept (E692: the 2024 GEO net change was printed as 6.7, then as 79), and a deck row is a cross-check, never the source (E698).
  • Imported column semantics are asserted, not read from headers. Kibali's "Contained Gold" column holds recovered ounces (FACT, E240). Every imported column carries an asserted basis (contained or recovered; 100% or attributable) checked by an identity test (§32).

24.4 The classification support pack (evidence for the CP)

Per block, volume or domain, from Strata (§13.11):

  • kriging efficiency and slope of regression;
  • drill spacing vs variogram ranges;
  • distance-to-data and extrapolation flags;
  • simulation-based P(metal within ±t over a production period at confidence c), where (period, t, c) is a registered policy triple with named variants: quarterly/annual ±15% at 90%, and ±10% at 95% (E387). Pueblo Viejo uses ±15% at 90% on quarterly (Measured) and annual (Indicated) volumes and ±30% for Inferred (FACT, E263). The pack prints the caveat that ±15% can be too loose because margins rarely exceed 15% (E388), and the production-volume choice is a declared parameter, because NGM notes the result is "highly sensitive" to it and "assumes stationarity" (FACT, E159). This remains an industry heuristic, labelled as such. Internal non-CIM classes (Pueblo Viejo's "Inventory" class) are allowed and never render publicly;
  • interpretation-hypothesis weights (L1): how much of the volume's metal depends on contested geology;
  • the reconciliation track record for analogous mined domains (§20).

What the pack never does: emit a class label, a "suggested class" or a colour-coded class map. A volume-by-metric view is allowed. A view that thresholds metrics into class names is refused (G-HALL-1), because it would be a classification in all but name.

24.5 The data-verification evidence index

  • The proposed NI 43-101 replacement requires specific disclosure of QP data verification per technical-report item (FACT, B5 W7).
  • Hallmark assembles, per item, the evidence trail the QP needs:
    • drillhole database audit results (Corebox lineage: what was checked, against which originals);
    • QA/QC performance (CRM, blank and duplicate statistics, e-process alarms and their disposition; §12.4);
    • umpire results;
    • density and survey verification: the laboratory check fraction (default 5–10%; E382) and the density grid against an optimal grid per confidence class (density grids are far sparser than grade grids; E383);
    • site visit records;
    • check sampling;
    • limitations and unresolved issues;
    • target vs achieved insertion rates with denominators, per-lab failure rates, "control absent" periods, the no-certificate share, qaqc_regime per campaign, and audit findings (RC vs DD bias, porosity assumptions, a "lack of Data Quality Objectives"; E164) (§12).
  • Each entry links to signed originals in the CAS (lab certificates, survey reports).
  • Disclosure depth differs by report: Carlin gives counts and failure rates, while Turquoise Ridge and Cortez give rules only (C2 §4.5f). That gap is what the index fills.
  • Why this is a strong product (B5). It turns the QP's most tedious and liability-laden task into a reproducible, auditable index. It is valuable under any code, and it creates no classification risk.

24.6 Renderers

Renderer Output (always a draft for the CP/QP)
render::jorc2012 Public report tables; Table 1 checklist populated with evidence links, with gaps marked
render::jorc2026_draft As above, plus the reconciliation section from Touchstone (§20.7) and the RPEE record. Labelled "draft standard".
render::ni43101 (current) and render::ni43101_proposed Technical-report item skeletons with the data-verification index (§24.5)
render::sk1300 Summary and individual-property disclosure tables with cut-off and price; technical report summary skeleton
render::crirsco Template-aligned tables
render::internal Intervals, hypothesis dependence, sensitivity ladders (MNPI; never public)

Every renderer is a pure function of (statement, code version, rounding rules) (PO-HALL-1). The system never files anything. Filing is a human act recorded as a DisclosureAct. Tests: render Pueblo Viejo's 2026 rows from unrounded internal rows and match the published two-significant-digit table (E262); recompute Carlin's attributable column at 61.5%, which catches its internal errors (E153, E193).

24.7 Statement-to-statement reconciliation

  • Year-over-year changes are decomposed exactly:
    • depletion (from Touchstone's as-mined volumes and posteriors);
    • model updates (new drilling; interpretation changes);
    • price-deck and cost changes;
    • cut-off changes;
    • conversion between classes;
    • acquisitions and divestments;
    • ownership changes (attributable).
  • Model and deck effects use the same order-independent decomposition as the AISC waterfall (§21.6).
  • Reserve replacement is computed from this waterfall under each named definition (§21.6).
  • The statement histories also train the conversion priors (c_FI, c_IR) used in capital allocation (§23.5).
  • DATA-GATE. Public bridges give only net change per deposit with qualitative drivers (Carlin 2023 → 2024), so the exact decomposition cannot be reproduced from public text (C2 §4.7).

24.8 Links to accounting and capital

  • A new reserve statement enters FA as ImportDocument(kind Disclosure) plus the QP's Attest.
  • DD&A units-of-production rates reprice prospectively from the effective date (§21.5 part 4).
  • Impairment indicators, stream drawdown and ARO timing read the same statement (§21.5).
  • Reserves are evaluated at the disclosure deck. A ladder of other decks is internal sensitivity, labelled MNPI, and feeds Helm (§23).

24.9 Guards, proof obligations and gates

Guard Condition Action
G-HALL-1 Software emits a class label, suggested class or thresholded class map Refuse (E023, E031)
G-HALL-2 A renderer for a code version not in force Every page labelled "draft standard"
G-HALL-3 A statement without its snapshot triple and CP act Refuse the render
G-HALL-4 S-K 1300 render without cut-off grade and price Refuse
G-HALL-5 Internal sensitivity content reaches a public renderer FMINE-REF-301 (MNPI wall)
G-HALL-6 A scheduled reserve period falls after a tenure expiry, or depends on a permit whose renewal_state is not Granted Highlight in the QP pack and the §35 register; never decide the class
PO Statement Verification
PO-HALL-1 Renderers are pure functions of (statement, code version, rounding rules) Golden tests per code
PO-HALL-2 Statement-to-statement reconciliation sums exactly and is order-independent Property tests
PO-HALL-3 The snapshot triple regenerates the declared-estimator projection bit-identically GATE-STRATA-G5
Gate Threshold (TARGET) When
GATE-HALL-01 Public lane: a published reserve reconciliation (Barrick or Newmont) reproduced from filings, with every unexplained difference listed. First fixture: Barrick's filed 2019–2025 roll-forward (Q4 2024 MD&A p.77; Q4 2025 MD&A p.71), with the Fourmile deck p.14 as a cross-check that differs by 0.1 Moz on 2025 depletion and net change (E698); the engine flags the printed 2025 copper net-change sign (closure gap 263 Mlb; E144), the 2024 GEO row's price-basis mismatch (E147) and the first-filed 2024 GEO net change of 6.7 against a total that implies 79 (E692) as discrepancy items with closure arithmetic, never silently corrected M0–M1
✖ GATE-HALL-02 Independent QP replay from the snapshot triple in ≤ 1 day (= GATE-STRATA-G5) S+12 (month 24). Kill: revert to the declared-estimator authority, with the belief ledger as advisory.
GATE-HALL-03 The data-verification index accepted by a pilot QP as usable for a technical report M3

24.10 Galaxy-brain card (illustrative values)

GB-33 · The "±15% at 90% over a quarter" heuristic turns on one correlation.

  • Practice anchor. Pueblo Viejo uses exactly this rule, ±15% at 90% on quarterly (Measured) and annual (Indicated) volumes (FACT, E263); a textbook proposal gives the same triple and warns it can be too loose (E387, E388).
  • Equation.
    • The requirement is CV_quarter ≤ 0.15/1.645 = 0.0912.
    • With SMU-level relative error CV = 0.6 and N = 2,000 SMUs mined per quarter, CV_quarter = 0.6/√n_eff, where n_eff = N/(1 + (N − 1)·ρ̄) and ρ̄ is the average error correlation between SMUs.
    • The requirement needs n_eff ≥ 43.3.
  • Substituted.
    • ρ̄ = 0.01: n_eff = 95 and P = 0.985. Passes.
    • ρ̄ = 0.02: n_eff = 49 and P = 0.919. Passes.
    • ρ̄ = 0.025: n_eff = 39 and P = 0.883. Fails.
    • ρ̄ = 0.03: n_eff = 33 and P = 0.848. Fails.
  • Intuition.
    • Whether a volume "supports Measured" under this heuristic hinges on the long-range error correlation, which comes from the variogram's longest structure and the drill spacing. Small, defensible modelling choices move it across the line.
    • That is why the pack shows the metric with its sensitivity to the variogram particles (§13.3), and why the class is the CP's call.
  • Assumptions. Equicorrelated errors (simulation computes the real thing directly); Gaussian quarterly error.
  • Flip. Closer drill spacing reduces both CV and ρ̄. The VOI of infill drilling for classification is a §22 card.

Open questions.

  • OPEN-HALL-1 (= OPEN-STRATA-2). Will QPs sign DeclaredOk, the simulation e-type, or both side by side?
  • OPEN-HALL-2. Final wording and commencement of JORC 2026 and the NI 43-101 replacement.
  • OPEN-HALL-3. Whether regulators or auditors require retained realizations for disclosed snapshots (OPEN-STRATA-4).
  • OPEN-HALL-4. Liability posture: does a data-verification index prepared by software change the QP's liability? Counsel review is needed before M3.

Part III described the mine. Part IV describes the machine underneath it. Each section answers "what does the code stand on, and why can it be trusted?" The order matters: units and time (§25) come before storage (§26), because every durable format encodes quantities and times, and a format that gets them wrong cannot be repaired by better storage.