Milestones M0–M6

3,760 words4 subsections3 tablesPlan version 0.1

On this page4
37.1 The wedge: Guidance & Reserve Assurance37.2 Galaxy-brain card37.3 The ladder (about 36 months from November 2026)37.4 The dependency firewall

37.1 The wedge: Guidance & Reserve Assurance

Brenner pass B5 tested seven first wedges. The verdicts:

Hypothesis Verdict Role
H-a Exploration prospectivity and capital allocation first Deferred, not rejected The second wedge, at M4, led by deal-structure capital allocation (PQ-7) and an effort-aware hindcast
H-b Reconciliation and metal accounting as the system of record first Rejected as system of record; kept as assurance System of record waits for FA convergence (M3 at the earliest)
H-c Full operating twin first Rejected for 24 months Becomes the M6 read-only "twin of record". Never a control system.
H-d Evidence spine plus a thin vertical slice Mandatory but narrowed The engineering spine under H-f, with the budget protocol from day one
H-e DecisionCards for the board Adopted as the delivery format Every executive output is a DecisionCard
H-f Guidance & Reserve Assurance Recommended wedge M0–M3: a read-only overlay delivered through H-e cards on a narrowed H-d spine
H-g TSF evidence state or CCV first Deferred to M5 After trust is earned; never "safe" or "unsafe"

Why H-f.

  • It is the only option that is useful with no data, through the public lane and synthetic truth, and decisive with some data, at one site (GB-38).
  • It targets measurement integrity behind the metrics the company publishes and steers by: gold and copper AISC, GEO and reserve replacement (E025).
  • Honest wording: software does not move AISC. It moves the accuracy, timeliness and attribution of AISC, which management then acts on.

37.2 Galaxy-brain card

GB-38 · The wedge under data-access uncertainty.

  • Equation. EV(h) = p·V(h | S1) + (1 − p)·V(h | S2) − λ·T(h).

    • S1: site data by month 7. S2: none in year 1.
    • V is the executive-perceived decisive value at month 12, on a 0–10 scale.
    • T is the tail exposure to the worst loss: a false-certainty number reaching a disclosure, capital decision or dam.
  • Substituted (elicited values from B5; λ = 1):

    h V(S1) V(S2) T EV at p = 0 EV at p = 0.5 EV at p = 1
    H-f 8 4 0.5 3.5 5.5 7.5
    H-a 4 3 1.0 2.0 2.5 3.0
    H-e 4 3 1.0 2.0 2.5 3.0
    H-d 3 2 0 2.0 2.5 3.0
    H-b 3 1 1.0 0.0 1.0 2.0
    H-c 2 0 2.0 −2.0 −1.0 0.0
  • Intuition. H-f dominates at every p under these values. That makes the dominant uncertainty (data access) irrelevant to which wedge to start. It matters only for when M2 delivers.

  • Assumptions.

    • Executives care about guidance credibility.
    • Filings contain per-site components (verify in M0 week 1).
    • A pre-registered scored forecast is persuasive.
  • Flip.

    • At p = 0, H-f loses to H-a only if V_f(S2) < 2.5, i.e. the public lane impresses no one. Then weight shifts to H-a plus PQ-7 for the parent.
    • If the sponsor's stated priority is exploration or capital allocation, start M4 at month 3, in parallel.
    • If Barrick's existing reconciliation already attributes its variances, H-f loses its finding mechanism. Pivot to H-e plus PQ-7.

37.3 The ladder (about 36 months from November 2026)

Each milestone has an artifact, acceptance criteria (TARGETs), a kill gate with a fallback, and the published metrics whose decision inputs it touches.

Clocks (DESIGN). M0 keeps absolute dates, because its deadlines are Barrick's release dates. Steps that need Barrick's people, data or signature (the site decision rule, GATE-DATA-01 to -04 in §34.4, M2 to M6 and the program gate) count months from the start of the engagement, so a later signature moves all of them by the same amount. On a January 2027 start, GATE-DATA-01 (month 4) falls at the end of April 2027 and the program gate (month 12) at the end of December 2027. Work that needs nothing from Barrick (engineering gates, M1's synthetic and public-lane items) keeps month 0 = November 2026.

M0 — Public Mirror plus Spine (months 0–3; Nov 2026–Jan 2027).

  • Artifact: fmine assure public --issuer barrick, emitting:
    • per-site AISC/TCC (C1 for copper)/CoS/grade/recovery/capex for every quarter whose Mine Stats workbook is in the source registry (today: the ten quarters 2024Q1–2026Q2, their half-year and year-to-date blocks, and the 2023 comparatives; E148, E451). Every cell cites <file-period>:<Sheet>!<Cell>
      • the workbook's sha256 and the filed Quarter Report page that reconciles it (E107). GEO is company-level only, on a named price basis (GB-27). Q3 2026 is the only DATA-GATE. It is released on 9 Nov 2026 at 06:00 ET, inside M0, so the importer meets a workbook it was not developed against (E454; W1 found layout drift in every vintage). That counts as a blind test only if a label-anchored importer exists and its commit and built-binary sha256 are pushed to the public repository before the release; if that is missed, the Q4 2026 workbook (February 2027, inside M1) is the blind test and that clause of GATE-BULL-01 moves to M1 (R7-C025, R7-C041);
    • published cut-off reproduction for every cut-off a technical report states (seven reproduced in the corpus, including the $/t vs $/st trap; E182–E184);
    • the metric-definition registry v1 (WGC 2013/2018 AISC/AIC; by-product vs co-product; GEO price ratio; named reserve-replacement bases);
    • a discrepancy register, each item bridged with citations or marked OPEN with the document that would close it, and each issuer discrepancy carrying its exact certificate and shipped as an evidence-challenge packet (BD-340, BD-349);
    • the live-dependency proof and a reproduction kit for outside readers: source URLs, sha256 digests, label selectors and expected state roots, with no workbook bytes in the repository (BD-338, BD-339);
    • TARGET, not gating: the issuer's per-site guidance FY2023–FY2026 transcribed by two readers with page citations, and FY2026 guidance registered beside FrankenMining's own forecasts as an issuer forecast family. It uses released documents only, so it can be shown to the issuer reviewer before the FY2026 release, and it is the answer to "nothing new" that does not depend on FrankenMining's own forecasting skill (BD-341);
    • the FY2026 forecast record (§21.6): per-site forecasts with 80% intervals and the flag uncalibrated, with information cut-off, input manifest, basis rule and baselines, hashed and pushed with an external time proof by 31 Dec 2026 and before any M0 content reaches an issuer insider;
    • the evidence spine: Claim, ledger, refusal codes;
    • a security pack: SBOM, threat model, offline single binary.
  • Acceptance (GATE-BULL-01, three parts; §21.6, §21.8): extraction fidelity of 100% of the named denominator against an independent reference read; identity accounting with every instance in one of five cited states; issuer consistency reported per identity family; the live-dependency proof on every scored value; byte-identical reruns with the input manifest in the state root; zero uncited numbers; every company-level figure matches its filed page and label (reserve replacement reads three-year 2023–25 on both bases, about 190% gold ounces and 504% GEO, Circular p.41; FY2025 gold AISC reads $1,637/oz on 3,318 koz sold; R7-C131); the forecast record time-proved before the release. The denominator is numeric site-quarter cells only, with placeholders and NOT_PUBLISHED site-quarters (Loulo-Gounkoto Q1–Q3 2025) excluded and listed by name. The gate record cites a run whose input manifest equals the source registry.
  • Reviewers and disclosure sequencing (R7-C045, R7-C133–R7-C135; CONDITIONAL on counsel). The kill is judged by a named pool: one independent ex-major finance reviewer and at most one issuer finance reviewer. Before the FY2026 release the issuer reviewer sees only the historical reproduction and the discrepancy register; the forecast set reaches issuer staff only after release, as scored output. Counsel reviews any external use of public-lane forecasts (B5 F3; default: share with the sponsor only, after release). Barrick files on Form 40-F as a foreign private issuer, so Regulation FD does not apply; the provincial tipping and insider-trading prohibitions (explained in National Policy 51-201) and U.S. antifraud rules do. No M0 content is presented to issuer insiders in Barrick's pre-release quiet period without counsel's clearance.
  • Kill: blind-file extraction fidelity below 80%, or the two reviewers rate it "nothing new". Fallback: the public metric engine becomes test fixtures only, and weight shifts to M1 reconciliation and an early M4.
  • Crates: WP-00 to WP-03 and WP-06 slices, plus BD-090 (WP-04, FMT-CAS-1) and BD-142 (WP-07, e2e harness), which the M0 deliverables' dependency closures contain (§38; R7-C086, R7-C104).
  • Dependency calendar (R7-C116). Each human or external dependency is listed by role with a commit-by date and a private-register id (no personal names in this repository): the two M0 reviewers by M0 week 4; BD-075 complete by month 2, because the month-2 Lumwana decision (BD-199) waits on it (R7-C089, R7-C106); the executive or ex-executive panel (GATE-HELM-01, KILL-PLUMB-5) before M1 starts; the Lumwana sponsor by month 2; the penetration tester (GATE-SEC-01) by month 4; GATE-SYNC-01 and INT-ATP-001 by month 5, because GATE-DATA-02 depends on them (R7-C090); the QP or metallurgist for GATE-TOUCH-04 named at GATE-DATA-01. A missed date is logged as a gate event.

M1 — Synthetic truth, reconciliation known answers, retrospective cards (months 3–6; Feb–Apr 2027).

  • Artifact:
    • the synthetic-truth generator (open-pit Au and Cu–Au) with seeded biases;
    • the reconciliation engine (§20);
    • calibration ledger v1;
    • scoring of the FY2026 public forecasts at release, reported whatever they show, against the two pre-registered baselines, with n, n_eff and the Clopper–Pearson interval (§21.6); the Q1 2027 vintage hashed before its quarter begins;
    • two retrospective DecisionCards built as known at decision time (GATE-HELM-01), each with a temporal-cone certificate over all its ancestors, including fitted parameters, exclusion lists and decks (BD-344);
    • from public data only (Appendix K.5): the guidance track record and the guidance completion test (BD-341, BD-342); forecast cohorts with outcome vintages (BD-343); disclosure lint in cited mode and the reliance check for issued outputs (BD-345, BD-347); the JV mirror for NGM, Pueblo Viejo and Kibali (BD-346).
  • Acceptance:
    • each K.5 capability shipped at M1 passes its K.5 test, and any whose kill condition fired is recorded as killed;
    • GATE-TOUCH-01/02: over ≥ 200 replicates, 90% intervals on each injected bias cover truth 85–95% of the time; the metal balance closes within stated uncertainty; non-identifiable pairs return FMINE-REF-104;
    • GATE-STORE-01, GATE-SYNC-01, GATE-DET-01, GATE-ROBOT-01, GATE-WALL-01 pass.
  • Kill: coverage outside 80–97% after one fix cycle, or identifiability not characterised. Fallback: no site proposal on reconciliation; lead with the metric engine and H-a/PQ-7.

M2 — Site Assurance Pilot in shadow mode (engagement months 6–12; Jul–Dec 2027 on a January 2027 start). The 12-month demonstrator.

  • Preconditions: GATE-DATA-01/02 (data agreement, insider list and blackout policy, security review, a named site sponsor plus QP and metallurgist).
  • Site preference: Lumwana (Zambia; 100% through Lumwana Mining Company, E551), Barrick's only wholly owned operating mine after the Hemlo and Tongon sales (E552–E554). It is outside the NGM/Newmont JV and outside the North American Barrick perimeter where Avathon is deploying (E563, E590, E591). The finding mechanism is recovery-led (W4 §5.2):
    • Headline recovery went from 89.4–89.8% (2023–24) to 91–92% (2025–H1 2026), mostly because head grade rose to 0.57–0.67% Cu. Every 2025–26 quarter sits 1.7–2.7 points below the site's own 2013–22 grade–recovery relation: 2.4–3.4% of output (3.4–4.0% in 2023–24), roughly $30–57M/yr at $4.00–5.50/lb (INFERENCE, E566, E567). Metal balance reproduces the printed recovery within ±1.5 points, so the gap is not a print artefact (E127).
    • Barrick describes 2021–25 recovery (91.15%, fresh plus transitional ore) as reasonable and attributes changes to grade and the mine plan; no breakdown by mechanism is published (E569, E573). The pre-registered deliverable is therefore an attribution of the grade-normalised gap among measurement (head and tail sampling, assay), ore type (fresh vs transitional) and operations (throughput and grind, downtime, power), not "recovery is low". Grind (P80) is split from throughput only where sizing data exist (LIMS or historian, GATE-DATA-04); otherwise the two are reported as one cause.
    • The same recovery card is scored against the feasibility study's 92.7% fresh-ore recovery for the 52 Mtpa parallel plant, which uses a similar flowsheet. One point at 240 ktpa ≈ 2.6 kt Cu/yr (E570–E572).
    • The site reports its grade reconciliation as confirming the model (E130). A grade null is the expected result there and is reported as such.
    • Non-stationarity: the window holds a prolonged SAG shutdown (Q1 2025), crusher downtime (Q3 2025), a reline (Feb 2026), the pebble-crusher tie-in (Q2 2026) and grid-power instability (2024) (E580–E584); each is a segment boundary. Strip ratio rises 4.37 → 5.74 and new-plant commissioning runs from H2 2027, with first copper at end-Q1 2028 (E131, E132, E578). Historical quarters are 2024Q1–2027Q1; the two forward quarters are pre-registered for the existing circuit only, and new-plant tonnage is a separate circuit with Estimated cards. On a January 2027 start they are Q3 and Q4 2027, each registered before it begins (by 30 June and 30 September 2027) and scored by January 2028, before first copper; Q3 needs GATE-DATA-03 met by month 6.
    • The recovery-capable GATE-DATA-03 set is the monthly metallurgical balance; head, tail and concentrate sampler and assay records; concentrate shipment and settlement assays; fresh/transitional tags on feed; and the monthly reconciliation pack. Historian and LIMS access (GATE-DATA-04) refines the finding but does not enable it.
    • GATE-DATA-03 has two thresholds (R7-C084, R7-C102). The recovery-led threshold is the set above; the grade-led threshold is §34.4's full set (block and GC models, dispatch tonnages, surveys, cost-centre extracts, one GATE-PORT-02 export). Lumwana delivering only the recovery-led set does not trigger M2′. On the recovery-led route BD-204 does not wait on BD-188, BD-189 or BD-194; a metallurgical-balance and sampler-record import bead is added (BD-336), WP-12 gains an edge to WP-10, and GATE-TOUCH-03 has a recovery-led variant (parity with the site's monthly metallurgical balance and recovery statement rather than F1/F2/F3).
    • A material finding is routed to disclosure (R7-C138). Lumwana is a material property in the 2025 AIF, and the 92.7% feasibility recovery is an AIF statement. A finding that bears on an AIF statement is sent to Barrick's disclosure QP and disclosure committee the day it is attested, before any wider sharing; counsel's QP-liability item OPEN-HALL-4 moves from "before M3" to before GATE-DATA-01.
    • Residency: Zambia's DPA 2021 s.70 keeps personal data in Zambia (FACT, E514), which the on-prem artifact already satisfies; rosters and fatigue data never leave the site node, and only aggregates may (W3).
  • Ranked alternates (used only if Lumwana has no named site sponsor by month 3):
    1. North Mara with Bulyanhulu under one Twiga data-governance paper. The Government of Tanzania's 16% is free-carried from 1 Jan 2020, it appoints Twiga board members, and economic benefits are split 50/50 through an annual true-up that excludes the $300M settlement (FACT, E135, E448, E562). Mechanism: plan vs actual on grade and ore delivery. Processed grade fell from 4.29 g/t (2024Q4) to 1.80 g/t (2026Q2) while AISC rose from $1,098 to $2,577/oz; Q1 2026 mined 7 kt of open-pit ore at a strip ratio of 514 during the Gokona pre-strip, and H1 2026 delivered 68 koz attributable against 200–230 koz guidance (FACT, E493–E495, E587, E588). Its recovery fall to 85% is grade-driven (E589), not a separate finding. Mining Act s.35(6) needs Geological Survey authorisation to export "any other data collected" (E527), so its node stays in Tanzania.
    2. Kibali (45%; Barrick operates; AngloGold Ashanti 45%, SOKIMO 10%; E560), if AngloGold consent is obtainable. It has the richest public reconciliation record in the corpus (C3 §2.3: the GC call is below model metal in every year 2016–25).
    • Not candidates: NGM and Pueblo Viejo (Newmont JV, the IPO vehicle and Avathon; E556–E558, E591); Fourmile (moving into NGM at fair market value, so any Fourmile work is a walled lane, §11.7; E139); Loulo-Gounkoto, Porgera, Reko Diq and the non-operated JVs (E559, E561).
  • Site decision rule. Month 1: the executive sponsor is asked to name a Lumwana site sponsor, metallurgist and QP and to accept the data list. Month 2: if all are named, the pilot is Lumwana. Month 3: otherwise open North Mara (Twiga paper) and Kibali (AngloGold consent) in parallel and take the first to reach GATE-DATA-01, preferring Kibali if both do. Month 4: no signed agreement means M2′.
  • Artifact: an on-prem single binary ingesting read-only snapshots for 8–12 historical quarters. Outputs:
    • parity reproduction of the site's own monthly reconciliation pack;
    • the reconciliation posterior and attribution;
    • a per-quarter AISC waterfall from tonnes, grade and recovery to unit cost, in $/lb for a copper site, with each bar classed controllable, price-linked or structural so the CFO's §3 question is answered by name (R7-C141, R7-C142);
    • a rolling-origin hindcast;
    • two forward quarters pre-registered inside the tenancy;
    • a Site Assurance DecisionCard that names, for each attributed cause, the cheapest trial or audit that would confirm it, with its expected effect registered before it runs; the metallurgist decides what to try;
    • a read-only agent interface on the node: the robot CLI and a read-only fmine-mcp slice over the pilot's Claims, with no prepare_* effects and the §30.4 rules (walls, AccessEvents, imported text as data). It opens only after RISK-17 is decided.
  • Acceptance:
    1. Parity with the site's F1/F2/F3 from the same inputs, every difference explained (GATE-TOUCH-03).
    2. At least one material finding attested Reviewed{against} by the site QP or metallurgist as new and plausible. "Material" is pre-registered: ≥ 1% of contained metal, or ≥ a $M/yr threshold set with the sponsor (GATE-TOUCH-04).
    3. Hindcast coverage reported with a small-sample caveat (GATE-TOUCH-05).
    4. No data egress, verified by Barrick IT.
    5. Reconciliation pack time down ≥ 50%, or the site elects to co-sign. The baseline is registered in BD-356's card before GATE-DATA-01: person-hours per pack for the last three packs, by role and site total, with no per-person figures, held in the private register.
  • Kill (month 12):
    • No data by month 7 → M2′: parent-level metric and reserve assurance on public data, the Nevada exploration hindcast and PQ-7 deal cards.
    • Data, but zero attested findings → report the null honestly and offer one second site with a recorded variance.
    • A second null → H-f is falsified as the wedge; pivot to H-e plus PQ-7.

Program gate (month 12; §34.5).

M3 — Group metric and reserve assurance plus the FA bridge (months 12–18).

  • Artifact:
    • a certified AISC/AIC/C1/TCC engine reading SAP extracts at the pilot and consolidating published group figures;
    • the reserves register with roll-forward, every named reserve-replacement basis and the QP attestation workflow (§24);
    • the data-verification index (GATE-HALL-03);
    • a JORC-style reconciliation section drafted for QP review if the code is in force;
    • an FA draft book with a statistical roll-forward and summary metal subledger through fa --json (§21).
  • Acceptance: three years of published reserve statements reproduced; an auditor replays the AISC certificate offline with fmine-verify; FA dry-run plan certificates for one month of summary posts, or a documented FA blocker list.
  • Kill: KILL-1 trigger (b) at month 15, as defined in §21.3. Fallback: as defined there (a local certified ledger with FA as a draft adapter). No executive deliverable slips.

M4 — Exploration and capital allocation, the second wedge (months 15–24).

  • Artifact:
    • a Nevada public-district model: the thinned marked point process with effort (§11), plus a USGS three-part parity mode with MapMark4 as lab oracle;
    • a temporal hindcast;
    • one Barrick region on internal data, outside North America unless OPEN-B4-08 is settled (§32.3);
    • junior earn-in, stake and option DecisionCards with distance-to-Tier-One (§23.8).
  • Acceptance: three-part parity on a published tract (GATE-LODE-P2); hindcast PR-AUC vs baseline with CIs and the count of positives; coverage reported; at least one live deal evaluated before the decision, recorded in the decision ledger.
  • Kill: the hindcast cannot beat parity, or has too few positives. Fallback: ship parity, effort accounting and the deal-structure engine without ML lift claims.

M5 — Multi-site rollout, TSF evidence state, group calibration ledger (months 24–30).

  • Artifact:
    • 3–5 sites;
    • a group calibration ledger with surprise monitors (CUSUM on F-factors that opens a hypothesis review and never retrains silently);
    • guidance ranges derived from calibrated intervals;
    • the GISTM evidence-state map for Extreme and Very High facilities (§18);
    • Highwall TARP automata and Muster CCV evidence at the first sites.
  • Acceptance: ≥ 3 sites use it, or co-sign it, as their reconciliation pack of record; calibration reported over ≥ 24 site-quarters; the TSF map covers all requirements for ≥ 3 facilities, with staleness and no safety claim.
  • Kill: fewer than 2 sites adopt after 6 months. Fallback: freeze the rollout and keep it as an audit and assurance tool.

M6 — Planning under calibrated uncertainty and a twin of record (months 30–36).

  • Artifact:
    • a stochastic LOM evaluation at one site, using simulations whose bias and variance are calibrated by M2–M5 reconciliation;
    • the value of the stochastic solution measured on the site's own plan;
    • a read-only "twin of record" API that any agent, Avathon's included, can cite (§16, §32.3);
    • frankensim capabilities only where they have passed GATE-FSIM-RECONV.
  • Acceptance: pit limits equal MineFlow/MineLib optima exactly (GATE-PUSH-PIT1); the stochastic-solution value reported with CIs; at least one external agent consumes certificates.
  • Kill: the optimizer differs from the oracle. Fallback: keep the vendor optimizer as the oracle. Do not ship an optimizer that is merely different.

37.4 The dependency firewall

No milestone's executive deliverable may be blocked by a sibling repo. A sibling capability enters only behind an adapter with a working local fallback.

Milestone frankensim FA fgdb Lifted / consumed
M0–M2 None None: a local exact ledger with FA-compatible ids and idempotency keys None (fsqlite projections) fs-evidence, fs-eproc, fs-robust, fs-rand, fs-sparse; franken-evidence/decision (OPEN-SUITE-1); fsci, fp
M3 None fa --json on a draft book, summaries only; local fallback Optional (KILL-2) + fs-voi
M4 None — Optional + SPDE/GMRF on lifted fs-sparse; fj for NUTS
M5–M6 Lifted crates; fmine-simbridge only after RECONV CloseRun if live If spatial needs are met + fs-uq/fs-assimilate patterns