Open questions and the decision rule
1,126 words4 subsections2 tablesPlan version 0.1
On this page4
36.1 The decision rule
Every OPEN item has:
- an owner who can decide it;
- a deadline, expressed as a milestone or gate it blocks;
- a fail-closed default that applies until it is decided;
- the evidence that would decide it.
An OPEN item past its deadline is escalated to the program review. Its default stays in force, and the plan records that the default, not a decision, is governing. Nothing is decided by silence.
36.2 Owner decisions needed first
| OPEN | Question | Owner | Deadline | Default until decided |
|---|---|---|---|---|
| OPEN-B4-09 | Crate and binary naming: closed 2026-10-29, fmine (no crates.io collision, E651; fm collisions stay in RISK-20) |
Owner | Commit 1 | fmine |
| RISK-17 / OPEN-STRATA-6 | Is the MIT + OpenAI/Anthropic rider acceptable for lifted code in a client-facing product? | Owner + counsel | Before M2 | Lift only into internal builds; no client distribution |
| OPEN-B4-01 | Residency statutes: narrowed by W3 (72 rows, 12 countries); counsel confirms the eight W3 §7 clauses | Counsel | Before any regional node | W3 rows as registered; in_country_only for every unknown pair |
| OPEN-B4-02 | asupersync 0.6 bump: unreleased (crates.io max 0.5.0; E653–E655); coordinated by the suite maintainer once 0.6.x publishes and fgdb, FA and fastmcp move | Suite maintainer | GATE-PIN-06 | Stay on =0.5.0 with §31.4 mitigations |
| B5 p | Site data by month 7 | Sponsor | Month 4 | Not assumed (W4, E599); M2′ is fully planned, resourced from M1 |
| OPEN-PUSH-1 | Does UntrustedCandidate import of external plans respect the closed-dependency rule? |
Owner | Pushback start (M4) | External plans enter as data files only, never as linked code |
| OPEN-B4-07 | MNPI insider-list format per listing venue | Counsel | Before M2 | The strictest known format |
| OPEN-HALL-4 | Does a software-prepared data-verification index change QP liability? | Counsel | Before GATE-DATA-01 (month 4; R7-C138) | Index labelled as support material only |
| OPEN-R7-1 | Issuer data terms: may derived Barrick workbook values be committed to the public repository? (RISK-31) The 2026-10-29 push (748da79) carried MOR_CASE rows that quote cell values (E820–E823). Files citing workbook cells, to read for quoted values in one pass: W1, C1, C3, C4, W4, MOR_CASE, AUDIT_4, the R7 MOR run, repro/barrick/README.md, scripts/oracle/share_census.py, forecasts/fy2026/rules.toml (locators only) and fmine-public's sources and tests. Undecided; the default binds new commits |
Owner + counsel | Before the next push that adds derived values | Locators, URLs, sha256 and computed results only |
| OPEN-R7-2 | Who are the two M0 reviewers, what is their relation to Barrick, and are they available by January 2027? (R7-C045) | Owner | M0 week 4 | One independent ex-major reviewer; any issuer reviewer sees forecasts only after release |
| OPEN-R7-3 | Is the owner a public-lane author during the FY2026 forecast window, given §31.1's private-access rule? (R7-C161) | Owner | Before the forecast hash | The owner authors only if they hold no private access; otherwise a walled author set |
| OPEN-R7-4 | Sourcing rule for statements about issuers and their partners (R7-C030, R7-C032). Resolved 2026-10-30: the plan records public, sourced facts that the design uses | Owner | Done | — |
| OPEN-R7-5 | What happens to the unpushed M0 commit 68e7091 (amend, follow with a fix commit, or push as is)? (Appendix K.2) Resolved 2026-10-29: pushed at the owner's instruction and followed by correcting commits (543df53 … 748da79); public history is not rewritten. K.2 step 2 was not complete at the push and is tracked as BD-323 |
Owner | Done | — |
| OPEN-B4-08 / OPEN-HEAD-2 | Will Avathon consume anchor-pinned feeds and write back evidence only? | Sponsor | M2 | Export projections offered; no write-back channel |
| OPEN-B4-10 | Reference site node hardware | Sponsor IT | M1 | Targets stay TARGETs |
36.3 Index of OPEN items by section
Section-level OPEN items satisfy §36.1 by inheritance unless §36.2 says otherwise: the owner is the subsystem's owner role in §34.3 and §38; the deadline is the earliest gate of that subsystem that the item blocks (shown in the "Earliest" column of §34.3); the fail-closed default is the posture in the table below; the deciding evidence is stated with the item in its section.
| Section | OPEN items | Default posture |
|---|---|---|
| §9–§10 Plumb | OPEN-PLUMB-7 (reference class for reserve-to-production grade bias), -9 (estimation-uncertainty disclosures, IAS 1.125-style), -11 (politics of scoring experts) | Uncalibrated flags; scores visible only to the expert and case owner |
| §11 Lodestar | OPEN-LODE-1…6 | Tract mode and Manski bounds where effort data are missing |
| §13 Strata | OPEN-STRATA-1…9 | Declared-estimator authority; belief ledger advisory |
| §14 Highwall | OPEN-HIGH-1…3 | Engineer's existing tools stay authoritative; FrankenMining tracks evidence state and TARP obligations only |
| §15 Pushback | OPEN-PUSH-1…5 | Vendor plans as candidates; honest gaps |
| §16 Headframe | OPEN-HEAD-1…4 | Survey epochs and certified drivers only |
| §17 Crucible | OPEN-CRUC-1…4 | Monthly metallurgical report as an attested observation |
| §18 Freeboard | OPEN-FREE-1…4 | Document-only evidence state |
| §19 Muster | OPEN-MUST-1…3 | Aggregate-only analytics |
| §20 Touchstone | OPEN-TOUCH-1…4 | Parity-only deliverable |
| §21 Bullion | OPEN-BULL-1…4; OPEN-B4-03 (does PostBatch accept external-subledger members, FA-ACC-13), OPEN-B4-04 (= OPEN-BULL-2) |
Monthly posting; local certified ledger |
| §23 Helm II | OPEN-HELM-1…6 | Reference-class widening; board sets τ |
| §24 Hallmark | OPEN-HALL-1…4 | QP authorship; no class labels from software |
| §26 Bedrock | OPEN-B4-01, -05, -07, -09, -10 | Fail-closed residency; one authority mechanism; strictest insider-list format; fmine naming |
| §27 Suite | OPEN-SUITE-3, -5 (OPEN-SUITE-1, -2 and -4 closed by the suite-fit audit, §27.7) | Local schema-compatible types; oracles not dependencies |
| §32 Portal | OPEN-B4-06, -08; OPEN-PORT-1 | Lab-oracle conversion; export projections only |
36.4 Planned refinement passes
- B6 Brenner pass (done 2026-10-29;
planning/brenner/B6_operations_plant_tailings_workforce.md). Headframe (§16), Crucible (§17), Freeboard (§18) and Muster (§19) received a refuter-first pass over 17 hypotheses, including four forced third alternatives. It added discriminating experiments T6-1 and T6-2, guards G-CRUC-6, G-FREE-11 and G-MUST-6, and cards GB-40 to GB-43 (Appendix B). Its AHS premise, a live 40-truck autonomous fleet at Carlin, was corrected against E619 (Appendix H.5b). - Plan review rounds. Round 1 (
AUDIT_1–AUDIT_3) and round 2 (AUDIT_4corpus second read;AUDIT_5equations, guards and bead graph) are folded in (Appendix H). At least two further external rounds (planning-workflow) remain before beads are finalized at commit 1, each diffed against the previous round until changes are marginal.